Toronto address · Ward 9, Davenport
30 Burlington Cres
The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Basement;lower & underpin unexcavated areas adding a bathroom, Mainfloor: add 2 bathrooms and relocate kitchen,;2nd Floor renovate bathroom and add a kitchen, 3rd Flr.add a kitchen and bathroom with4 dormers addition + 2 roofdecks and fire escape.
Applied Aug 27, 2004 · issued Sep 23, 2005 · 2 homes added · Permit 04 169678 BLD
- Closed
Plumbing
Plumbing - Basement;lower & underpin adding a bathroom, Mainfloor: add 2 bathrooms and relocate kitchen,;2nd Floor renovate bathroom and add a kitchen, 3rd Flr.add a kitchen and bathroom with4 dormers addition - Multiple Projects
Applied Aug 27, 2004 · issued Sep 23, 2005 · completed May 27, 2026 · Permit 04 169678 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
173 homes · Residential
300 m away · Condominium · Approved · filed Oct 25, 2021
Neighbours’ Committee of Adjustment files within 250 m
1 Burlington Cres · Consent
To obtain consent to sever the property into two residential lots.
110 m away · filed Jul 23, 2026 · Accepted
97 Alberta Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing an enclosed front porch with stairs (to contain a mudroom).
150 m away · filed Jun 19, 2026 · Approved
129 Oakwood Ave · Minor variance
To legalize and to maintain the existing two-and-one-half-storey semi-detached houseplex containing five residential units, in which four self-contained residential dwelling units were constructed without an authorized building permit. Also, to alter the existing two-and-one-half-storey semi-detached houseplex by converting the second storey from one residential dwelling unit into two residential dwelling units. The existing converted semi-detached houseplex contains a front porch with stairs, rear basement walkout, a rear ground floor deck with stairs, a rear second-storey deck and a rear th…
200 m away · filed May 10, 2026 · Approved
46 Highview Cres · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony, a new front ground level vestibule entrance, and a new rear ground floor entrance with stairs (abutting the north portion of the dwelling).
160 m away · filed Aug 19, 2025 · Approved
32 Thome Cres · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing an extended covered front porch with stairs, a front ground floor deck with stairs, a front second floor deck, a rear ground floor and side (south) deck with pergola above, and a front garbage enclosure. Also, to install a secondary unit within the basement of the existing dwelling.
120 m away · filed Sep 5, 2024 · Approved
5 Burlington Cres · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing partial rear additions on the first and second storeys, as well as a new rear ground floor deck with stairs. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.
90 m away · filed Mar 18, 2024 · Approved
28 Burlington Cres · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition, and a rear ground floor terrace with stairs. Also, to construct a new one-storey ancillary building (detached garage) in the rear year. The existing detached garage in the rear yard will be demolished.
10 m away · filed Apr 6, 2023 · Approved
116 Winona Dr · Minor variance
To alter the two-storey townhouse dwelling by constructing a third storey addition with a rear third storey balcony.
210 m away · filed Nov 21, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.