Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

30 Gloucester St

The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for sealant replacement and concrete wall repairs to the entrance canopy slab of the parking garage in an existing apartment building.

    Applied Jun 5, 2023 · issued Jun 20, 2023 · Permit 23 156187 BLD

    Permit issued
  • Designated structure · Sign building permit related

    In conjunction with a multi-storey building on the premises, proposal to erect and display an illuminated overhanging structure sign, displaying static copy at the 1st floor on the south elevation.****GLOUCESTER GATE****

    Applied Oct 16, 2020 · completed Nov 1, 2022 · Permit 20 206750 DST

    Cancelled
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for structural concrete repairs to the garage slab in an existing apartment building.

    Applied Aug 28, 2018 · issued Aug 30, 2018 · Permit 18 216660 BLD

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 680 Yonge St · Minor variance

    To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.

    150 m away · filed Aug 23, 2024 · Approved

  • 577 Yonge St · Minor variance

    To permit the following uses within the existing four-storey non-residential building: a nightclub use within the basement, eating establishment use on the ground level, retail store use on the second level, place of assembly use on the third level, and recreation use on the fourth level.

    170 m away · filed Aug 23, 2024 · Approved

  • 593 Yonge St · Minor variance

    To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.

    130 m away · filed Jul 23, 2024 · Approved

  • 7 Gloucester St · Consent

    To obtain consent to sever the property into two residential lots. The existing easements/rights-of-way will be maintained and unaltered. The existing 44-storey mixed-use building (also on the lot) will be maintained and unaltered. This building is under a condo ownership and requires a variance to the Zoning By-law as outlined in Minor Variance Application A0653/24TEY.

    90 m away · filed Jul 23, 2024 · Approved

  • 11 Gloucester St · Minor variance

    To convert the existing two-and-one-half-storey townhouse into a mixed-use building.

    90 m away · filed Jul 23, 2024 · Approved

  • 30 Charles St E · Minor variance

    To alter the existing three-storey residential apartment building by constructing one additional residential dwelling unit in the basement. There will be a total of 22 residential dwelling units on this lot.

    230 m away · filed Jun 2, 2024 · Refused

  • 62 Charles St E · Minor variance

    To convert an existing three-storey non-residential building (originally constructed as two semi-detached dwellings), into a fourplex residential building with rear third storey rooftop terraces. This building has a Heritage designation.

    250 m away · filed Jan 12, 2024 · Approved

  • 55 Charles St E · Consent

    To obtain consent to sever a lot (with a 50-storey residential building currently under construction) into 4 lots to separate the 100 freehold rental replacement units (located on levels 3 to 7), for ownership purposes. Also, to create easements/rights-of-way above and below-grade. There are no associated minor variance applications.

    190 m away · filed Aug 31, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.