Toronto address · Ward 21, Scarborough Centre
30 Perivale Cres
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal to construct new addition in the rear yard. New small deck has been proposed at the rear and a new below grade entrance has also been proposed basically smaller in size, but at the same location. The porch and the small front addition has also been revised to keep up the allowed lot coverage.
Applied Jul 13, 2020 · issued Jul 14, 2020 · completed Apr 29, 2021 · Permit 19 155333 PLB
- Closed
Heating and ventilation
HVAC - Proposal to construct new addition in the rear yard. New small deck has been proposed at the rear and a new below grade entrance has also been proposed basically smaller in size, but at the same location. The porch and the small front addition has also been revised to keep up the allowed lot coverage.
Applied Jun 12, 2020 · issued Jun 19, 2020 · completed Apr 29, 2021 · Permit 19 155333 HVA
- Closed
Small residential project · Multiple projects
Proposal to construct new addition in the rear yard. New small deck has been proposed at the rear and a new below grade entrance has also been proposed basically smaller in size, but at the same location. The porch and the small front addition has also been revised to keep up the allowed lot coverage.
Applied May 16, 2019 · issued Sep 16, 2019 · completed Apr 29, 2021 · Permit 19 155333 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
34 Bendale Blvd · Minor variance
To construct a new two-storey ancillary garden suite in the west side yard and to alter the existing one-storey dwelling by constructing a second storey addition. A roof will also be constructed above the existing east front yard porch of the existing dwelling. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on March 11, 2026.
180 m away · filed Jan 14, 2026 · Approved
24 Rossander Crt · Minor variance
To construct a rear yard addition to the existing dwelling. This application was re-scheduled from the December 4, 2024 hearing.
190 m away · filed Oct 9, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.