Toronto address · Ward 20, Scarborough Southwest
30 Red Deer Ave
The City of Toronto has 4 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal for main floor rear addition, second floor addition, new front porch, new rear deck, basement underpinning, and interior alterarion.
Applied Apr 14, 2023 · issued May 1, 2023 · Permit 22 210999 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for main floor rear addition, second floor addition, new front porch, new rear deck, basement underpinning, and interior alterarion.
Applied Sep 29, 2022 · issued Nov 22, 2022 · Permit 22 210999 BLD
- Closed
Plumbing
Plumbing - Proposal for main floor rear addition, second floor addition, new front porch, new rear deck, basement underpinning, and interior alterarion.
Applied Sep 29, 2022 · issued Nov 22, 2022 · completed Sep 29, 2023 · Permit 22 210999 PLB
- Cancelled
Drains and site services
Drain - Proposal for main floor rear addition, second floor addition, new front porch, new rear deck, basement underpinning, and interior alterarion.
Applied Sep 29, 2022 · issued Nov 22, 2022 · completed Jul 27, 2026 · Permit 22 210999 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition to existing dwelling with a new rear yard deck and front yard porch.
Decision: Approved (hearing Jun 23, 2022)
Filed Apr 25, 2022 · File A0084/22SC
What’s planned nearby
Development sites within 500 m
- Approved
121 homes · Residential
260 m away · Condominium · Approved · filed Jul 15, 2021
- Under review
12 storeys · 287 homes · Residential
370 m away · Site plan · Under review · filed Mar 23, 2022
- Under appeal
12 storeys · 168 homes · Residential
480 m away · Site plan · Under appeal · filed Jul 29, 2021
Neighbours’ Committee of Adjustment files within 250 m
29 Red Deer Ave · Minor variance
To alter the existing one-storey dwelling by constructing a second storey and rear yard addition with a front and rear platform. There will be a total of two dwelling units on the lot.
50 m away · filed Jun 10, 2026 · Approved
4 Kenny Ave · Minor variance
To alter the existing two-storey dwelling by adding a one-storey rear yard addition with a rear deck and patio.
120 m away · filed Apr 4, 2025 · Approved
236 Warden Ave · Minor variance
200 m away · filed Jan 31, 2025 · Application withdrawn
236 Warden Ave · Minor variance
To construct a new two-storey detached dwelling.
200 m away · filed Jan 31, 2025 · Application withdrawn
236 Warden Ave · Consent
To obtain consent to sever the property into three residential lots. The existing two-storey detached dwelling would be demolished. Cross reference minor variance applications A0034/25SC, A0035/25SC and A0036/25SC.
200 m away · filed Jan 31, 2025 · Application withdrawn
236 Warden Ave · Minor variance
To construct a new two-storey detached dwelling. The existing two-storey detached dwelling will be demolished. Cross-reference Consent and Minor Variance Applications B0007/25SC, A0035/25SC and A0036/25SC.
200 m away · filed Jan 31, 2025 · Application withdrawn
46 Dodge Rd · Minor variance
To convert attic to living space and create a 1-1/2 storey single detached dwelling.
100 m away · filed Aug 21, 2023 · Approved
6 Kenny Ave · Minor variance
To demolish existing 1-storey dwelling and construct a new 2-storey dwelling. NOTE: This Revised Public Hearing Notice is being sent out to correctly identify the proposal description and Zoning Designation.
130 m away · filed Aug 11, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.