Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

30 Soudan Ave

The City of Toronto has 17 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Fire alarm

    Proposed Fire alarm upgrades with reference to Section 11 of the OBC (the performance of the fire alarm system shall be at least equal to the performance level prior to this alteration). Fire alarm work only, no changes to other systems (partition, ceiling, HVAC, etc.). No changes to occupancy type or load.

    Applied May 11, 2026 · issued Jun 9, 2026 · Permit 26 158657 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to use an existing office unit as a new training area for office employees in Suite 201, located on the 2nd floor level for tenant - 'VHA Home Healthcare'.

    Applied Sep 22, 2023 · issued Oct 26, 2023 · completed Jun 27, 2025 · Permit 23 205815 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to convert meeting space into nursing clinic on ground floor suite 100

    Applied Sep 21, 2023 · issued Oct 30, 2023 · completed Oct 16, 2025 · Permit 23 205147 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to convert an existing office into a new nursing clinic in Suite 100, located on the ground floor level for tenant - 'VHA Home Healthcare'.

    Applied Sep 21, 2023 · issued Oct 26, 2023 · completed Jul 8, 2025 · Permit 23 205147 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to convert meeting space into nursing clinic on ground floor

    Applied Sep 21, 2023 · issued Oct 30, 2023 · completed Oct 17, 2025 · Permit 23 205147 HVA

    Closed
  • Addition or alteration · Interior alterations

    nterior alterations on the 3rd floor and a new meeting room on 5th floor.

    Applied Feb 25, 2022 · issued Mar 9, 2022 · completed Jul 29, 2022 · Permit 22 117501 BLD

    Closed
  • Plumbing

    REV01: changes as per drawings

    Applied Jul 7, 2020 · issued Jul 7, 2020 · completed Sep 24, 2020 · Permit 20 113124 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV01: plumbing works only

    Applied Jun 5, 2020 · issued Oct 26, 2020 · completed Oct 29, 2020 · Permit 20 113124 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to unit 200 in existing office "Tri-Gen Realty"

    Applied Feb 6, 2020 · issued Mar 4, 2020 · completed Oct 29, 2020 · Permit 20 113124 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to unit 200 in existing office "Tri-Gen Realty"

    Applied Feb 6, 2020 · issued Mar 9, 2020 · completed Sep 24, 2020 · Permit 20 113124 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to unit 200 in existing office "Tri-Gen Realty"

    Applied Feb 6, 2020 · issued Mar 10, 2020 · completed Sep 25, 2020 · Permit 20 113124 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations - back to base - in unit 200 of existing office.

    Applied Sep 19, 2019 · issued Oct 7, 2019 · completed Dec 12, 2019 · Permit 19 224130 BLD

    Closed
Show 5 more permits
  • Addition or alteration · Interior alterations

    Proposed construction of a partition wall to create a room for the manager of the firm on the second floor of the existing office building

    Applied Dec 12, 2017 · issued Dec 19, 2017 · completed Sep 26, 2019 · Permit 17 274324 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 2 backflow prevention devices to existing building.

    Applied Nov 22, 2017 · issued Dec 20, 2017 · completed Feb 21, 2018 · Permit 17 265922 PSA

    Closed
  • Fire and security upgrade · Fire alarm

    Proposal for fire alram panel replacement in existing 6 storey office building.

    Applied May 22, 2015 · issued Jun 8, 2015 · Permit 15 161156 FSU

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to ground floor, 3rd floor, 4th floor and 5th floorAll floors single tennant floors (2nd floor sub-leased to other tennant)

    Applied Jun 8, 2010 · issued Jul 8, 2010 · Permit 10 191809 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Make interior alterations to 3rd & 5th floor office.

    Applied Sep 27, 2006 · issued Nov 1, 2006 · completed Jun 8, 2026 · Permit 06 179557 HVA

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2161 Yonge St · Minor variance

    To alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5).

    50 m away · filed Jun 15, 2026 · Approved

  • 78 Hillsdale Ave E · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.

    150 m away · filed Apr 16, 2025 · Approved

  • 2100 Yonge St · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-way.

    230 m away · filed Feb 14, 2025 · Approved

  • 57 Soudan Ave · Minor variance

    To permit the continued use on the site as a dental office, as well as to permit the conversion of the second floor of the building into additional dentist office space.

    80 m away · filed Jan 27, 2025 · Approved

  • 2161 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 153-2022(OLT)) for a 38-storey mixed-use building by increasing the residential gross floor area (for a total of 380 residential dwelling units), reducing the commercial (office) gross floor area, and reducing the number of required parking spaces. Also, to permit a home occupation use (personal service shop) within the building, and to reduce the required width of 4 obstructed parking spaces.

    50 m away · filed Jun 17, 2024 · Approved

  • 2161 Yonge St · Minor variance

    To alter Site Specific Zoning By-law 153-2022 (Ontario Land Tribunal (OLT)) to increase the mixed-use building height, increase the total maximum gross floor area, increase the total residential gross floor area, and reduce the minimum length of 26 parking spaces.

    50 m away · filed Feb 21, 2023 · Approved

  • 2100 Yonge St · Minor variance

    To permit a lower percentage of units with three bedrooms or more within a new 12-storey mixed-use building (that will contain 7 rental replacement suites and a total of 76 residential dwelling units).

    230 m away · filed Apr 26, 2022 · Approved

  • 2112 Yonge St · Minor variance

    To alter the 10-storey, 56-unit mixed-use development, approved under Site Specific By-law No. 1173-2015, by permitting two additional storeys, increasing the height of the retail level, converting a part of a residential unit on the second storey to amenity space, and converting two regular parking spaces on level P2 into one accessible parking space, for a total of 70 residential units.

    210 m away · filed Jan 26, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.