Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

30 St Paul St

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to construct a 1 storey laneway suite with finished basement in the rear yard of the existing single family dwelling.

    Applied Sep 27, 2019 · issued Nov 3, 2020 · completed Jan 15, 2021 · Permit 19 228197 PLB

    Cancelled
  • Small residential project · New laneway / rear yard suite

    Proposal to construct a 1 storey laneway suite with finished basement in the rear yard of the existing single family dwelling.

    Applied Sep 27, 2019 · issued Nov 3, 2020 · completed Jan 15, 2021 · 1 home added · Permit 19 228197 BLD

    Cancelled
  • Drains and site services

    Drain - Proposal to construct a 1 storey laneway suite with finished basement in the rear yard of the existing single family dwelling.

    Applied Sep 27, 2019 · issued Nov 3, 2020 · completed Jan 15, 2021 · Permit 19 228197 DRN

    Cancelled
  • Small residential project · Party wall admin permits

    Party Wall Admin Permit for ceiling reconstruction at 30 St Paul Street, 18-141241 BLD 00 SR.

    Applied Apr 10, 2018 · issued Apr 19, 2018 · completed Jan 17, 2019 · Permit 18 141256 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 4 Gilead Pl · Consent

    To obtain consent to sever the property into three lots, and to maintain the existing easement/right-of-way.

    250 m away · filed Apr 2, 2026 · Approved

  • 4 Gilead Pl · Minor variance

    The existing undersized public parking lot will be maintained and unaltered.

    250 m away · filed Apr 2, 2026 · Approved

  • 4 Gilead Pl · Minor variance

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    250 m away · filed Apr 2, 2026 · Approved

  • 498 Queen St E · Minor variance

    To legalize and to maintain the conversion of a rooming house into eight residential dwelling units, within this lawfully existing building.

    170 m away · filed Mar 7, 2025 · Deferred

  • 90 Sumach St · Minor variance

    To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.

    180 m away · filed Sep 27, 2024 · Approved

  • 29 Sackville St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

    180 m away · filed Jun 6, 2024 · Approved

  • 90 Sumach St · Minor variance

    To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.

    180 m away · filed Jan 5, 2024 · Refused

  • 90 Sumach St · Minor variance

    To legalize and to maintain the residential rooftop terrace enclosure (unit 702 in the seven-storey mixed-use building) which was constructed without an authorized building permit.

    180 m away · filed Nov 29, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.