Toronto address · Ward 13, Toronto Centre
30 Wellington St W
The City of Toronto has 35 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.Proposed interior alterations to an existing office
Applied May 12, 2026 · issued Jun 15, 2026 · completed Aug 10, 2026 · Permit 25 199543 BLD (revision 01)
- Closed
Plumbing
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.Plumbing - Proposed interior alterations to an existing office
Applied May 12, 2026 · issued Jul 20, 2026 · completed Aug 25, 2026 · Permit 25 199543 PLB (revision 01)
- Closed
Heating and ventilation
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.HVAC - Proposed interior alterations to an existing office
Applied May 12, 2026 · issued Jun 15, 2026 · completed Aug 25, 2026 · Permit 25 199543 HVA (revision 01)
- Closed
Heating and ventilation
REV 01: Revision to floor plans, notes and details.HVAC - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Applied Feb 17, 2026 · issued Feb 27, 2026 · completed Apr 8, 2026 · Permit 25 227574 HVA (revision 01)
- Closed
Plumbing
REV 01: Revision to floor plans, notes and details.Plumbing - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Applied Feb 17, 2026 · issued Feb 26, 2026 · completed Apr 8, 2026 · Permit 25 227574 PLB (revision 01)
- Revision issued
Addition or alteration · Interior alterations
REV 01: Revision to floor plans, notes and details.Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Applied Feb 17, 2026 · issued Mar 10, 2026 · Permit 25 227574 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Applied Sep 19, 2025 · issued Oct 23, 2025 · completed Apr 8, 2026 · Permit 25 227574 HVA
- Closed
Plumbing
Plumbing - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Applied Sep 19, 2025 · issued Oct 23, 2025 · completed Apr 8, 2026 · Permit 25 227574 PLB
- Inspections under way
Addition or alteration · Interior alterations
Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Applied Sep 18, 2025 · issued Oct 23, 2025 · Permit 25 227574 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations back to base - taking the old Druxys space and bringing it back to base building standards for future project.
Applied Aug 22, 2025 · issued Sep 9, 2025 · Permit 25 214661 BLD
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations to an existing office
Applied Jul 24, 2025 · issued Sep 17, 2025 · completed Aug 10, 2026 · Permit 25 199543 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to an existing office
Applied Jul 24, 2025 · issued Sep 17, 2025 · completed Aug 25, 2026 · Permit 25 199543 HVA
Show 23 more permits
- Closed
Plumbing
Plumbing - Proposed interior alterations to an existing office
Applied Jul 24, 2025 · issued Sep 17, 2025 · completed Aug 25, 2026 · Permit 25 199543 PLB
- Closed
Plumbing
REV 01 : Back to Base and Washroom Renovation Floor 5Plumbing - Proposal for Back to Base and Washroom Renovation Floor 5
Applied Jul 16, 2025 · issued Aug 11, 2025 · completed Aug 25, 2025 · Permit 24 200675 PLB (revision 01)
- Cancelled
Heating and ventilation
REV01 : Revision to HVAC - PERMIT #24 200675 HVA/PLBHVAC - Proposal for Back to Base and Washroom Renovation Floor 5
Applied Jun 17, 2025 · completed Aug 11, 2025 · Permit 24 200675 HVA (revision 01)
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 3 stairwell maglocks.
Applied Apr 4, 2025 · issued Apr 15, 2025 · completed Jun 26, 2025 · Permit 25 139894 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 3 single maglocks on 2, 3 single maglocks on 3 and 3 single maglocks on 4 at the stairwell doors.
Applied Oct 31, 2024 · issued Nov 4, 2024 · completed Jan 6, 2025 · Permit 24 233296 FSU
- Closed
Heating and ventilation
HVAC - Proposal for Back to Base and Washroom Renovation Floor 5
Applied Aug 19, 2024 · issued Sep 17, 2024 · completed Aug 25, 2025 · Permit 24 200675 HVA
- Closed
Plumbing
Plumbing - Proposal for Back to Base and Washroom Renovation Floor 5
Applied Aug 19, 2024 · issued Sep 17, 2024 · completed Aug 25, 2025 · Permit 24 200675 PLB
- Closed
Addition or alteration · Interior alterations
Proposal to return the existing 5th floor office level to base building condition. Scope includes washroom renovation. [Commerce Court - South Building]
Applied Aug 19, 2024 · issued Sep 17, 2024 · completed Jul 30, 2025 · Permit 24 200675 BLD
- Closed
Addition or alteration · Interior alterations
REV 02 - TO REFLECT LOCATION OF ADULT CHANGING TABLE AS PER BLD INSPECTOR'S REQUEST. ADDED STRUCT ENG DWGS.REV 01 - adding washrooms to floors 2, 3 & 4Proposal for interior alterations to return existing office spaces to base building condition on floors 2, 3 & 4. [Commerce Court - South Bldg.]
Applied Aug 8, 2024 · issued Sep 12, 2024 · completed Nov 13, 2024 · Permit 23 233896 BLD (revision 02)
- Closed
Plumbing
Revision 01: adding washrooms to floors 2, 3 & 4Plumbing - Proposal for interior alterations - back to base on floors 2, 3 and 4
Applied Mar 4, 2024 · issued Apr 2, 2024 · completed Oct 16, 2024 · Permit 23 233896 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
REV 01 - adding washrooms to floors 2, 3 & 4Proposal for interior alterations to return existing office spaces to base building condition on floors 2, 3 & 4. [Commerce Court - South Bldg.]
Applied Mar 4, 2024 · issued Apr 10, 2024 · completed Nov 13, 2024 · Permit 23 233896 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations - back to base on floors 2, 3 and 4
Applied Dec 8, 2023 · issued Feb 12, 2024 · completed Oct 29, 2024 · Permit 23 233896 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to return existing office spaces to base building condition on floors 2, 3 & 4. [Commerce Court - South Bldg.]
Applied Dec 8, 2023 · issued Feb 12, 2024 · completed Nov 13, 2024 · Permit 23 233896 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations - back to base on floors 2, 3 and 4
Applied Dec 8, 2023 · issued Feb 12, 2024 · completed Oct 16, 2024 · Permit 23 233896 PLB
- Closed
Addition or alteration · Interior alterations
Interior alteration to existing group 'd' occupancy (office use)
Applied Aug 2, 2017 · issued Aug 14, 2017 · completed Nov 28, 2017 · Permit 17 210299 BLD
- Closed
Heating and ventilation
Hvac - interior alteration to group 'd' occupancy
Applied Aug 2, 2017 · issued Sep 6, 2017 · completed Dec 21, 2017 · Permit 17 210299 HVA
- Closed
Heating and ventilation
HVAC - Interior alterations to vacant space to create bicycle storage
Applied Oct 29, 2015 · issued Dec 2, 2015 · completed Oct 30, 2018 · Permit 15 244538 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to vacant space to create bicycle storage
Applied Oct 29, 2015 · issued Nov 30, 2015 · completed Jul 8, 2020 · Permit 15 244538 BLD
- Closed
Plumbing
Plumbing - Interior alterations to vacant space to create bicycle storage
Applied Oct 29, 2015 · issued Dec 2, 2015 · completed Oct 22, 2018 · Permit 15 244538 PLB
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations to ground floor of existing office building with associated sprinkler work.
Applied Jul 13, 2015 · issued Jul 21, 2015 · completed Mar 8, 2018 · Permit 15 189389 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to ground floor of existing office building with associated sprinkler work.
Applied Jul 13, 2015 · issued Jul 24, 2015 · completed Jul 28, 2017 · Permit 15 189389 HVA
- Closed
Heating and ventilation
HVAC - Make interior alterations to ground floor lobby.
Applied Aug 22, 2007 · issued Oct 22, 2007 · completed Dec 6, 2017 · Permit 07 255485 HVA
- Closed
Heating and ventilation · HVAC: groups D & E
Demo old and install new fresh air supply system on 6th floor Mechanical Room Penthouse.
Applied Jul 31, 2007 · issued Aug 3, 2007 · completed Jul 5, 2018 · Permit 07 248911 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
187-199 Bay Street, 18-30 Wellington Street West and 3 other streets
64 storeys · Residential
50 m away · Site plan · Under review · filed Aug 26, 2021
- Under review
65 storeys · 649 homes · Mixed use
120 m away · Site plan · Under review · filed Apr 7, 2025
- Under appeal
40 storeys · 480 homes · Mixed use
150 m away · Site plan · Under appeal · filed Aug 9, 2023
- Under review
60 storeys · 256 homes · Mixed use
160 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
68 storeys · 836 homes · Residential
170 m away · Rezoning · Under review · filed Oct 21, 2024
- Under review
66 storeys · 511 homes · Mixed use
170 m away · Site plan · Under review · filed Apr 27, 2022
Neighbours’ Committee of Adjustment files within 250 m
20 King St W · Minor variance
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
200 m away · filed May 6, 2026 · Approved
20 Wellington St E · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition and to create new easements/rights-of-ways (some stratified).
220 m away · filed Apr 16, 2025 · Approved
200 Bay St · Minor variance
To expand the existing mezzanine floor located on the 12 ½ floor level of the North Tower within the existing 26-storey commercial office building to provide additional office space.
150 m away · filed Feb 5, 2020 · Application withdrawn
55 Yonge St · Minor variance
To convert vacant office space into a medical/dental office on the ground floor of the existing twelve-storey commercial and retail building.
180 m away · filed Jul 31, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.