Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 7, Humber River-Black Creek

300 Bartor Rd

The City of Toronto has 42 building permits since 2017 (23 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for interior alterations to an exisitng shell space for new data centre "Server Farm"

    Applied Mar 10, 2026 · issued Mar 19, 2026 · completed Jul 3, 2026 · Permit 25 107695 PLB

    Closed
  • Heating and ventilation

    Revision 1: Changes to proposed build out of office space within data centre shell space.TOR 1.3HVAC - Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.3

    Applied Jul 29, 2025 · issued Aug 5, 2025 · Permit 22 241773 HVA (revision 01)

    Revision issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal for interior alterations to an exisitng shell space for new data centre "Server Farm"

    Applied Feb 21, 2025 · Permit 25 107695 FSU

    Application on hold
  • Heating and ventilation

    HVAC - Proposal for interior alterations to an exisitng shell space for new data centre "Server Farm"

    Applied Jan 22, 2025 · issued Oct 2, 2025 · completed Jul 3, 2026 · Permit 25 107695 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to an exisitng shell space for new data centre "Server Farm"

    Applied Jan 22, 2025 · issued Feb 24, 2025 · completed Jul 15, 2026 · Permit 25 107695 BLD

    Closed
  • Addition or alteration · Interior alterations

    The Project is to fit out an exisitng shell space, to be data centre.

    Applied Dec 24, 2024 · completed Jan 9, 2025 · Permit 24 253363 BLD

    Cancelled
  • Addition or alteration · Addition(s)

    REV 01: permit revision is to reduce indicated partition fire rating at shell / future spaces

    Applied Dec 14, 2023 · issued Jan 19, 2024 · Permit 22 190775 BLD (revision 01)

    Revision issued
  • Plumbing

    Rev 01 - Interior equipment and fixtures build-out of data center shell space. Plumbing - Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.1B, 1.2

    Applied Nov 23, 2023 · issued Mar 11, 2024 · Permit 22 241761 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    Rev 01 - Interior equipment and fixtures build-out of data center shell space. HVAC - Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.1B, 1.2

    Applied Nov 23, 2023 · issued Mar 11, 2024 · Permit 22 241761 HVA (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Rev 01 - Interior equipment and fixtures build-out of data center shell space. Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.1B, 1.2

    Applied Nov 15, 2023 · issued Dec 28, 2023 · Permit 22 241761 BLD (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Revision 01. Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.3

    Applied Oct 18, 2023 · issued Jan 22, 2024 · Permit 22 241773 BLD (revision 01)

    Revision issued
  • Partial permit · Partial permit - structural framing

    Part Permit - New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructure rooms. Exterior work includes revised parking areas and mechanical/electrical equipment yards.

    Applied Feb 15, 2023 · issued Jul 13, 2023 · completed Jul 13, 2023 · Permit 22 190775 STR

    Closed
Show 30 more permits
  • Plumbing

    Plumbing - Proposal for interior alterations to an existing data center building - Office - TOR 1

    Applied Jan 26, 2023 · issued Jul 13, 2023 · completed Jul 15, 2024 · Permit 23 107440 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to an existing data center building - office - TOR 1

    Applied Jan 26, 2023 · issued Jul 13, 2023 · Permit 23 107440 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to an existing data center building office - TOR 1

    Applied Jan 26, 2023 · issued Jul 13, 2023 · completed Jul 21, 2024 · Permit 23 107440 HVA

    Closed
  • Heating and ventilation

    HVAC - Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.1B, 1.2

    Applied Dec 22, 2022 · issued Aug 14, 2023 · Permit 22 241761 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.3

    Applied Dec 22, 2022 · issued Aug 14, 2023 · Permit 22 241773 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.1B, 1.2

    Applied Dec 22, 2022 · issued Aug 4, 2023 · Permit 22 241761 BLD

    Inspections under way
  • Plumbing

    Plumbing - Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.1B, 1.2

    Applied Dec 22, 2022 · issued Aug 14, 2023 · Permit 22 241761 PLB

    Inspections under way
  • Heating and ventilation

    TOR 1.3HVAC - Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.3

    Applied Dec 22, 2022 · issued Aug 14, 2023 · Permit 22 241773 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Interior & Exterior alterations to exisitng building in preparation for construction of proposed addition.TOR 1.3

    Applied Dec 22, 2022 · issued Aug 4, 2023 · Permit 22 241773 BLD

    Inspections under way
  • Drains and site services

    Drain - New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructure rooms. Exterior work includes revised parking areas and mechanical/electrical equipment yards.

    Applied Nov 24, 2022 · issued Nov 28, 2022 · completed Jul 2, 2024 · Permit 22 190775 DRN

    Closed
  • Partial permit · Partial permit - foundation

    Part Permit - New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructure rooms. Exterior work includes revised parking areas and mechanical/electrical equipment yards.

    Applied Oct 4, 2022 · completed Mar 17, 2023 · Permit 22 190775 FND

    Superseded
  • Plumbing

    Plumbing - New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructure rooms. Exterior work includes revised parking areas and mechanical/electrical equipment yards.

    Applied Aug 15, 2022 · issued Jul 13, 2023 · completed Jul 2, 2024 · Permit 22 190775 PLB

    Closed
  • Addition or alteration · Addition(s)

    New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructure rooms. Exterior work includes revised parking areas and mechanical/electrical equipment yards.

    Applied Aug 15, 2022 · issued Jul 13, 2023 · Permit 22 190775 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructure rooms. Exterior work includes revised parking areas and mechanical/electrical equipment yards.

    Applied Aug 15, 2022 · issued Jul 13, 2023 · completed Feb 29, 2024 · Permit 22 190775 HVA

    Closed
  • Drains and site services · Site service

    site services - proposed New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructure rooms. Exterior work includes revised parking areas and mechanical/electrical equipment yards by October 20, 2023

    Applied May 18, 2022 · issued Apr 22, 2024 · completed Jul 2, 2024 · Permit 22 148622 STS

    Closed
  • Plumbing

    Rev 1: New interior renovation of an existing data center, support, and office space into new data center, support, and office space including replacement of equipment yard and rooftop mounted mechanical and electriocal equipment.Plumbing - Proposal for interior alterations to existing office building

    Applied Jun 18, 2020 · issued Jul 16, 2020 · completed Oct 28, 2020 · Permit 19 215547 PLB (revision 01)

    Closed
  • Designated structure · Sign building permit related

    The applicant has requested to erect one illuminated wall sign displaying static copy, measuring 0.96 m x 4.25 m at the height of 2.96 meters on the east elevation of existing one storey building.**SERVERFARM**

    Applied Jun 1, 2020 · issued Jun 29, 2020 · completed Aug 10, 2020 · Permit 20 148430 DST

    Closed
  • Fire and security upgrade · Sprinklers

    Proposal for interior sprinkler system alternation of an existing data centre, support, and office space. Separate application as per comments on 19 215547 BLD 00 BA.

    Applied Jan 9, 2020 · issued Feb 25, 2020 · Permit 20 102876 FSU

    Revocation pending
  • Drains and site services · Site service

    Upgrade existing water service from 2" line to 3" line. All existing storm and sanitary to remain without alteration.

    Applied Nov 15, 2019 · issued Dec 16, 2019 · Permit 19 249722 STS

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to existing office building

    Applied Sep 4, 2019 · issued Dec 17, 2019 · completed Oct 28, 2020 · Permit 19 215547 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing office building

    Applied Sep 4, 2019 · issued Feb 5, 2020 · completed Dec 15, 2020 · Permit 19 215547 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office building. Proposed use: "Software Development and Processing"

    Applied Sep 3, 2019 · issued Oct 30, 2019 · completed Nov 13, 2020 · Permit 19 215547 BLD

    Closed
  • Heating and ventilation

    HVAC - Mechanical fuel systems for a new diesel generator, removal of an exising piping system for existing generator to be demolished., (Construct and remove new piers, lintels and cables busways for installation of new diesel generator on existing concrete pad. )

    Applied Nov 17, 2009 · issued Dec 16, 2009 · Permit 09 188107 HVA

    Permit issued
  • Addition or alteration · Other

    Remove existing generator on west side and all supporting structures for cables into building and then construct new piers, lintels and cables busways for the installation of a new diesel generator on existing concrete pad just to the south of previous generator.

    Applied Nov 16, 2009 · issued Dec 16, 2009 · Permit 09 188107 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations of field 1 data centre for Telus.

    Applied Aug 5, 2009 · issued Aug 31, 2009 · Permit 09 153869 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposed interior alterations of field 1 data centre for Telus.

    Applied Aug 5, 2009 · issued Aug 31, 2009 · completed Jun 8, 2026 · Permit 09 153869 PLB

    Closed (dormant)
  • Addition or alteration · Interior alterations

    Proposed interior alterations of field 1 data centre for Telus.

    Applied Aug 5, 2009 · issued Aug 31, 2009 · Permit 09 153869 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Addition to the existing ** TELUS** data centre to accommodate a new electrical room + construction of exterior concrete pad for new generator units and fuel tanks + interior expansion of computer racks in an existing data processing space.

    Applied Oct 3, 2007 · issued Oct 12, 2007 · Permit 07 265755 HVA

    Inspections under way
  • Plumbing

    Plumbing - Addition to the existing ** TELUS** data centre to accommodate a new electrical room + construction of exterior concrete pad for new generator units and fuel tanks + interior expansion of computer racks in an existing data processing space.

    Applied Oct 3, 2007 · issued Oct 12, 2007 · Permit 07 265755 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Addition to the existing ** TELUS** data centre to accommodate a new electrical room + construction of exterior concrete pad for new generator units and fuel tanks + interior expansion of computer racks in an existing data processing space.

    Applied Sep 28, 2007 · issued Oct 12, 2007 · Permit 07 265755 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a two-storey addition along the south side of the existing dwelling.

    Decision: Approved (hearing Jul 14, 2022)

    Filed Mar 11, 2022 · File A0229/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 700 Clayson Rd · Consent

    To obtain consent to a lease for a term in excess of 21 years.

    140 m away · filed Aug 25, 2025 · Application withdrawn

  • 700 Clayson Rd · Consent

    Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.

    140 m away · filed Nov 4, 2020 · Approved

Everything planned in Humber River-Black Creek

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.