The City of Toronto has 42 building permits since 2017 (29 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Other

    Widening of an existing drain in the existing fire pump room to accommodate more drain pipes. No proposed below grade works. This work is part of an existing permit #26 118663 FSU 00 FS.

    Applied Apr 1, 2026 · issued Apr 27, 2026 · Permit 26 137587 PSA

    Permit issued
  • Heating and ventilation · Other

    Mechanical equipment (intake and exhaust louvre) upgrade for the existing fire pump room. This work is part of an existing permit #26 118663 FSU 00 FS

    Applied Apr 1, 2026 · issued Apr 27, 2026 · Permit 26 137594 MSA

    Permit issued
  • Fire and security upgrade · Other

    The designer's work is limited to providing sprinkler and fire alarm engineering design upgrade throughout including diesel fire pump assembly.

    Applied Feb 19, 2026 · issued Mar 25, 2026 · Permit 26 118663 FSU

    Permit issued
  • Heating and ventilation

    Revision 1: Changes include modification of wall layout and changing the elevation of the mezzanine.HVAC - Proposed new wash bay at 300 humber college blvd bakery

    Applied Jul 11, 2025 · issued Aug 19, 2025 · Permit 22 221686 HVA (revision 01)

    Revision issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to renovate existing wash bay

    Applied Nov 22, 2024 · issued May 22, 2025 · completed Jul 15, 2025 · Permit 24 201328 FSU

    Closed
  • Addition or alteration · Interior alterations

    Revision 01: Changes include modification of wall layout and changing the elevation of the mezzanie. Proposed new wash bay to food manufacturing plant

    Applied Aug 23, 2024 · issued Sep 12, 2024 · Permit 22 221686 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Revision 01: A summery of changes are as follows: "Flour bin platform" renamed to "dispensing bowl platform and has changed locations as well as design changes, addition of platform within blower room for inspection of equipment, roof reinforcing design for the addition on RTU's. All changes are clouded within the attached drawing.HVAC - Phase 1 - Construct a blower room, sifter room, extend a mechanical storage mezzanine, construct one office. Phase 2 - Install a flower & sugar silo, associated delivery system, mezzanine to support indoor bin & hoppers

    Applied Aug 20, 2024 · completed Sep 17, 2024 · Permit 22 241446 HVA (revision 01)

    Cancelled
  • Heating and ventilation

    HVAC - Proposal to renovate existing wash bay

    Applied Aug 20, 2024 · issued Jan 6, 2025 · completed Jun 9, 2026 · Permit 24 201328 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal to renovate existing wash bay

    Applied Aug 20, 2024 · issued Dec 10, 2024 · Permit 24 201328 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to renovate existing wash bay

    Applied Aug 20, 2024 · issued Dec 10, 2024 · completed Mar 25, 2026 · Permit 24 201328 PLB

    Closed
  • Addition or alteration · Multiple projects

    Revision 01: A summery of changes are as follows: "Flour bin platform" renamed to "dispensing bowl platform and has changed locations as well as design changes, addition of platform within blower room for inspection of equipment, roof reinforcing design for the addition on RTU's. All changes are clouded within the attached drawing.Phase 1 - Construct a blower room, sifter room, extend a mechanical storage mezzanine, construct one office. Phase 2 - Install a flower & sugar silo, associated delivery system, mezzanine to support indoor bin & hoppers

    Applied Aug 20, 2024 · issued Oct 9, 2024 · Permit 22 241446 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision 01: Changes include modification of wall layout and platform. Added 1 new platform to the scope of work. Construct a new hygienic separation wall between raw and cooked goods- bakery - Give & Go Prepared Foods Corp.

    Applied Aug 2, 2024 · issued Jun 3, 2025 · Permit 23 127747 BLD (revision 01)

    Revision issued
Show 30 more permits
  • Alternative solution

    Proposed Alternative Solution is to use a fixed ladder in order to access a service platform where electrical equipment is placed, rather than a stair as required in OBC Notice from March 11, 2024. A stair is not feasible in this situation due to space constraints. Furthermore, there is no equipment that requires routine maintenance. It is fixed electrical equipment on the service platform consisting of control panels and transformers which would require infrequent access. The platform will therefore rarely be occupied, and if it were, it would like be by one electrician.

    Applied Jun 4, 2024 · completed Aug 14, 2024 · Permit 24 159590 ALT

    Approved
  • Addition or alteration · Interior alterations

    Revision 01 - Raw washbay ceiling has changed from IMP panel to concrete, addition of 3 total roof platforms, removed monorail from exterior stair, revisions to the raw/RTE separation wall, addition of platform for equipment inspection. Proposal for interior alterations that include a new food processing line, new wash bays, separation walls and warehouse.

    Applied Dec 13, 2023 · issued Aug 20, 2024 · Permit 23 146557 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Installation of free-standing storage rack system

    Applied Aug 9, 2023 · issued Sep 28, 2023 · completed Nov 27, 2023 · Permit 23 186253 BLD

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposed new wash bay to food manufacturing plant

    Applied Jun 21, 2023 · completed Apr 11, 2025 · Permit 22 221686 FSU

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations that include a new food processing line, new wash bays, separation walls and warehouse.

    Applied May 16, 2023 · issued Oct 18, 2023 · Permit 23 146557 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations that include a new food processing line, new wash bays, separation walls and warehouse.

    Applied May 16, 2023 · issued Sep 19, 2023 · Permit 23 146557 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations that include a new food processing line, new wash bays, separation walls and warehouse.

    Applied May 16, 2023 · issued Sep 19, 2023 · Permit 23 146557 BLD

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Phase 1 - Construct a blower room, sifter room, extend a mechanical storage mezzanine, construct one office. Phase 2 - Install a flower & sugar silo, associated delivery system, mezzanine to support indoor bin & hoppers

    Applied Apr 11, 2023 · Permit 22 241446 FSU

    Application on hold
  • Plumbing

    Plumbing - Construct a new hygienic separation wall between raw and cooked goods- bakery - Give & Go Prepared Foods Corp.

    Applied Mar 28, 2023 · issued Jul 12, 2023 · completed Jul 2, 2025 · Permit 23 127747 PLB

    Closed
  • Addition or alteration · Interior alterations

    Construct a new hygienic separation wall between raw and cooked goods- bakery - Give & Go Prepared Foods Corp.

    Applied Mar 28, 2023 · issued Jul 12, 2023 · Permit 23 127747 BLD

    Inspections under way
  • Addition or alteration · Other

    Proposed new compressor and electrical upgrades

    Applied Jan 27, 2023 · issued Jul 23, 2024 · Permit 23 107857 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed new compressor and electrical upgrades

    Applied Jan 27, 2023 · issued Jul 23, 2024 · completed Dec 11, 2024 · Permit 23 107857 HVA

    Closed
  • Heating and ventilation

    HVAC - Phase 1 - Construct a blower room, sifter room, extend a mechanical storage mezzanine, construct one office. Phase 2 - Install a flower & sugar silo, associated delivery system, mezzanine to support indoor bin & hoppers

    Applied Jan 5, 2023 · issued Aug 9, 2024 · Permit 22 241446 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Phase 1 - Construct a blower room, sifter room, extend a mechanical storage mezzanine, construct one office. Phase 2 - Install a flower & sugar silo, associated delivery system, mezzanine to support indoor bin & hoppers

    Applied Dec 21, 2022 · issued Apr 21, 2023 · Permit 22 241446 BLD

    Inspections under way
  • Plumbing · Other

    Construct new underground plumbing services complete with new floor drains

    Applied Nov 22, 2022 · issued Apr 11, 2023 · Permit 22 231851 PSA

    Inspections under way
  • Plumbing

    Plumbing - Proposed new wash bay at 300 humber college blvd bakery

    Applied Oct 25, 2022 · issued Jul 8, 2024 · Permit 22 221686 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed new wash bay at 300 humber college blvd bakery

    Applied Oct 25, 2022 · issued Jul 8, 2024 · Permit 22 221686 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed new wash bay to food manufacturing plant

    Applied Oct 25, 2022 · issued Oct 11, 2023 · Permit 22 221686 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for the installation of a free-standing rack storage system. (Give and Go Prepared Foods Corp)

    Applied Oct 19, 2020 · issued Nov 27, 2020 · completed Apr 1, 2021 · Permit 20 207974 BLD

    Closed
  • Fire and security upgrade · Sprinklers

    Proposed modification to the existing sprinkler system to suite new floor layout.

    Applied Sep 16, 2020 · issued Nov 24, 2020 · completed Apr 1, 2021 · Permit 20 194563 FSU

    Closed
  • Fire and security upgrade · Fire alarm

    REV #1-revise sequence of operations due to converyor tunnelFire alarm upgrade - Give and Go Foods

    Applied Sep 15, 2014 · issued Oct 23, 2014 · Permit 14 178581 FSU (revision 01)

    Revision issued
  • Fire and security upgrade · Fire alarm

    Fire alarm upgrade - Give and Go Foods

    Applied Jun 23, 2014 · issued Jul 23, 2014 · Permit 14 178581 FSU

    Permit issued
  • Plumbing

    Plumbing - Proposal to construct a new slab for oven support platform to existing industrial processing plant

    Applied Jul 5, 2013 · issued Sep 5, 2013 · Permit 13 199349 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal to construct a new slab for oven support platform to existing industrial processing plant

    Applied Jul 5, 2013 · completed Aug 29, 2024 · Permit 13 199349 HVA

    Cancelled
  • Addition or alteration · Other

    Proposal to construct a new slab for oven support platform to existing industrial processing plant

    Applied Jul 5, 2013 · issued Sep 5, 2013 · Permit 13 199349 BLD

    Permit issued
  • Plumbing · Piping: other buildings

    Alteration to existing sewer system.

    Applied Dec 1, 2011 · issued Jul 20, 2012 · Permit 11 319388 PSA

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    Proposed installation of backflow prevention device in existing food processing plant.

    Applied Jun 16, 2011 · issued Jan 28, 2013 · completed Jan 6, 2026 · Permit 11 220639 PSA

    Closed
  • Addition or alteration · Interior alterations

    Proposed Shelf and Rack Storage System, to replace an existing service platform/mezznine under Building Permit # 10-141605.

    Applied Aug 16, 2010 · issued Oct 12, 2010 · completed Jun 8, 2026 · Permit 10 240382 BLD

    Closed (dormant)
  • Plumbing

    Plumbing - Proposed new service platform / mezzanine in existing industrial processing plant.

    Applied Mar 30, 2010 · issued Jun 15, 2010 · Permit 10 141605 PLB

    Inspections under way
  • Addition or alteration · Other

    Proposed new service platform / mezzanine in existing industrial processing plant.

    Applied Mar 29, 2010 · issued Jun 15, 2010 · Permit 10 141605 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 325 Humber College Blvd · Minor variance

    To construct a new industrial and office building.

    200 m away · filed Dec 23, 2019 · Approved

  • 25 Woodbine Downs Blvd · Consent

    To obtain consent to a lease for a term in excess of 21 years.

    240 m away · filed Dec 23, 2019 · Approved

Everything planned in Etobicoke North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.