Toronto address · Ward 14, Toronto-Danforth
301 Sammon Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Installation of Back water valve.
Applied Jul 26, 2023 · issued Jul 31, 2023 · completed Aug 11, 2023 · Permit 23 180204 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
26 Wiley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second-storey addition, and two rear window wells at the basement level. Also, to reconstruct the front ground floor covered porch with stairs (raised in height to accommodate an increase in ground floor and basement height).
180 m away · filed Jan 26, 2026 · Approved
53 Wiley Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial rear one-storey addition with deck, and a rear cantilevered second storey addition.
120 m away · filed Oct 31, 2025 · Approved
2 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front covered porch with stairs, a front second and third floor extended roof, and a rear second floor deck with stairs.
180 m away · filed May 12, 2025 · Approved
2 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front covered porch with stairs, a front second and third floor extended roof, and a rear second floor deck with stairs.
180 m away · filed May 12, 2025 · Approved
2 Frankdale Ave · Consent
To obtain consent to sever the property into two residential lots.
180 m away · filed Feb 11, 2025 · Approved
364 Sammon Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a front covered porch, front and rear one-storey additions, a complete second storey addition above the entire dwelling, and a rear ground floor deck. The existing one-storey ancillary building (shed) and driveway, in the rear yard, abutting Leroy Avenue, will be maintained and unaltered.
180 m away · filed Jan 2, 2025 · Approved
932 Greenwood Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition (cantilevered at the front), a rear two storey addition, a new covered front porch with stairs (the existing front porch will be demolished), a front second storey balcony, and a rear ground floor deck. Also, to construct a front yard parking pad.
190 m away · filed Aug 7, 2024 · Approved
42 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) with a front covered porch, and front and rear third floor balconies facing the side (north) lot line. The existing one-storey detached dwelling, and rear detached garage will be demolished.
40 m away · filed Jul 31, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.