Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

303 Lytton Blvd

The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Hvac - proposed: demolition / new house / 200.18 square meters of finish basement / plumbing / drain / hvac

    Applied Jan 19, 2024 · issued Mar 18, 2024 · Permit 23 237146 HVA

    Inspections under way
  • Drains and site services

    Drain - PROPOSED: DEMOLITION / NEW HOUSE / 200.18 SQUARE METERS OF FINISH BASEMENT / PLUMBING / DRAIN / HVAC

    Applied Dec 19, 2023 · issued Feb 12, 2024 · Permit 23 237146 DRN

    Inspections under way
  • Plumbing

    Plumbing - PROPOSED: DEMOLITION / NEW HOUSE / 200.18 SQUARE METERS OF FINISH BASEMENT / PLUMBING / DRAIN / HVAC

    Applied Dec 19, 2023 · issued Feb 12, 2024 · Permit 23 237146 PLB

    Inspections under way
  • New house · New building

    Proposed: demolition / new house / 200.18 square meters of finish basement / plumbing / drain / hvac

    Applied Dec 19, 2023 · issued Feb 12, 2024 · 1 home added · Permit 23 237146 BLD

    Inspections under way
  • Demolition

    Proposed: demolition / new house / 200.18 square meters of finish basement / plumbing / drain / hvac

    Applied Dec 19, 2023 · issued Mar 14, 2024 · completed Aug 28, 2025 · 1 home removed · Permit 23 237155 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    Proposed new 2-storey single family dwelling.

    Decision: Approved (hearing Oct 12, 2023)

    Filed Aug 25, 2023 · File A0462/23NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 285 Glencairn Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, and a covered rear deck and balcony.

    240 m away · filed Aug 20, 2026 · Hearing scheduled

  • 258 Lytton Blvd · Minor variance

    To construct a new dwelling.

    140 m away · filed Feb 3, 2026 · Approved

  • 87 Hillhurst Blvd · Minor variance

    To construct a new detached dwelling with an integral garage. Note: This application was previously deferred at the Committee of Adjustment hearing on October 9, 2025.

    230 m away · filed Aug 29, 2025 · Approved

  • 93 Mona Dr · Minor variance

    To construct a new two-storey detached dwelling with a one-car integral garage.

    210 m away · filed Aug 5, 2025 · Approved

  • 63 Hillhurst Blvd · Minor variance

    Proposal to demolish existing dwelling and construct a new two-storey single family detached dwelling.

    220 m away · filed May 21, 2025 · Approved

  • 110 Hillhurst Blvd · Minor variance

    To propose additional habitable space below grade.

    220 m away · filed Jan 20, 2025 · Approved

  • 156 Cortleigh Blvd · Minor variance

    To construct a new detached dwelling.

    210 m away · filed Nov 13, 2024 · Approved

  • 205 Cortleigh Blvd · Minor variance

    To construct a new detached dwelling.NOTE: This application was previously deferred at the Committee of Adjustment hearing on July 4, 2024.

    120 m away · filed May 28, 2024 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.