Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

3050 Lawrence Ave E

Scar Grace Hosp - Scar General Site

The City of Toronto has 102 building permits since 2017 (58 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior demolition

    The existing cancer care clinic at SHN General Hospital is expanding is footprint across existing level 1 clinical space. The demolition permit is required to reveal the existing conditions of the building prior to construction to assist the design consultants and contractor with the extent of the proposed renovation work. The demolition is proposed to remove all partitions, fixtures, services (where not serving other areas) in the area of work. NOTE: all existing fire and life safety systems and access to existing exits are to be maintained throughout the demolition phase.

    Applied Sep 8, 2026 · issued Sep 25, 2026 · Permit 26 233796 BLD

    Permit issued
  • Heating and ventilation

    HVAC - The existing cancer care clinic at SHN General Hospital is expanding is footprint across existing level 1 clinical space. The demolition permit is required to reveal the existing conditions of the building prior to construction to assist the design consultants and contractor with the extent of the proposed renovation work. The demolition is proposed to remove all partitions, fixtures, services (where not serving other areas) in the area of work. NOTE: all existing fire and life safety systems and access to existing exits are to be maintained throughout the demolition phase.

    Applied Sep 8, 2026 · Permit 26 233796 HVA

    Application acceptable
  • Fire and security upgrade · Sprinklers

    Revision 01: Revised DesignProposal to alter the existing sprinkler system for tenant renovation in an existing hospital - Satellite Diagnostic Imaging

    Applied Jan 16, 2026 · issued Mar 4, 2026 · Permit 25 223077 FSU (revision 01)

    Revision issued
  • Fire and security upgrade · Sprinklers

    Proposal to alter the existing sprinkler system for tenant renovation in an existing hospital - Satellite Diagnostic Imaging

    Applied Sep 10, 2025 · issued Dec 2, 2025 · Permit 25 223077 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    Revision 01: Refer to memo attached for list of changes.Interior alterations to Level 10 office and on call spaces to convert to new classrooms, exam rooms, admin area, workspaces, washrooms, lounge, and on call rooms for intergrated learners spaces.

    Applied Aug 27, 2025 · issued Sep 16, 2025 · Permit 25 130152 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for renovations to the Satellite Diagnostic Imaging area to allow for the installation of existing imaging equipment.

    Applied May 13, 2025 · issued Jul 25, 2025 · completed Aug 26, 2026 · Permit 25 158151 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for renovations to the Satellite Diagnostic Imaging area to allow for the installation of existing imaging equipment.

    Applied May 13, 2025 · issued Jul 25, 2025 · completed Aug 27, 2026 · Permit 25 158151 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for renovations to the Satellite Diagnostic Imaging area to allow for the installation of existing imaging equipment.

    Applied May 12, 2025 · issued Jul 25, 2025 · completed Sep 3, 2026 · Permit 25 158151 BLD

    Closed
  • Fire and security upgrade · Sprinklers

    Renovation to existing sprinkler system for the level 2 haemodialysis isolation unit

    Applied Apr 11, 2025 · issued Apr 14, 2025 · Permit 25 143346 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    Interior alterations to Level 10 office and on call spaces to convert to new classrooms, exam rooms, admin area, workspaces, washrooms, lounge, and on call rooms for intergrated learners spaces.

    Applied Mar 17, 2025 · issued Apr 29, 2025 · Permit 25 130152 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to Level 10 office and on call spaces to convert to new classrooms, exam rooms, admin area, workspaces, washrooms, lounge, and on call rooms for intergrated learners spaces.

    Applied Mar 17, 2025 · issued May 7, 2025 · Permit 25 130152 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations to Level 10 office and on call spaces to convert to new classrooms, exam rooms, admin area, workspaces, washrooms, lounge, and on call rooms for intergrated learners spaces.

    Applied Mar 17, 2025 · issued May 23, 2025 · Permit 25 130152 PLB

    Inspections under way
Show 90 more permits
  • Fire and security upgrade · Electromagnetic locks

    Proposal for installation of one (1) single electromagnetic locking device on concourse level

    Applied Feb 21, 2025 · issued Feb 24, 2025 · completed May 7, 2025 · Permit 25 119920 FSU

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal for installation of seven (7) electromagnetic locking devices on second floor.

    Applied Feb 21, 2025 · issued Feb 24, 2025 · Permit 25 120049 FSU

    Inspections under way
  • Designated structure · Sign building permit related

    To erect and display five first party signs, all illuminated and displaying static copy. Signs will be erected at the first storey, on the south and west elevations.**Scarborough Health Network**

    Applied Feb 10, 2025 · issued Feb 28, 2025 · completed Apr 16, 2026 · Permit 25 115209 DST

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal for Installation of 2 double electromagnetic locking devises on ground floor Emergency

    Applied Oct 24, 2024 · issued Nov 1, 2024 · Permit 24 230793 FSU

    Inspections under way
  • Plumbing

    Plumbing revision - Additional roof replacement and new roof drains. Delete proposed roof fall arrest anchors on west roof as existing are suffice.

    Applied Aug 16, 2024 · issued Sep 4, 2024 · completed Oct 20, 2025 · Permit 22 112390 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision 02- Additional roof replacement and new roof drains. Delete proposed roof fall arrest anchors on west roof as existing are suffice.

    Applied Aug 16, 2024 · issued Sep 13, 2024 · Permit 22 112390 BLD (revision 02)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 2 single electromagnetic locking devices on ground floor emergency area of an existing hospital.

    Applied Aug 9, 2024 · issued Aug 15, 2024 · completed Oct 18, 2024 · Permit 24 195333 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alteration to emergency department

    Applied Jul 25, 2024 · issued Sep 6, 2024 · Permit 24 187321 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alteration to emergency department

    Applied Jul 25, 2024 · issued Sep 6, 2024 · Permit 24 187321 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alteration to emergency department

    Applied Jul 25, 2024 · issued Sep 6, 2024 · Permit 24 187321 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for Full renovation of existing space housing renal dialysis treatment areas, as well as fit-out of adjacent unfinished space, to provide expansion of dialysis services.

    Applied Jul 11, 2024 · issued Aug 26, 2024 · Permit 24 178510 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for Full renovation of existing space housing renal dialysis treatment areas, as well as fit-out of adjacent unfinished space, to provide expansion of dialysis services.

    Applied Jul 11, 2024 · issued Aug 26, 2024 · Permit 24 178510 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for Full renovation of existing space housing renal dialysis treatment areas, as well as fit-out of adjacent unfinished space, to provide expansion of dialysis services.

    Applied Jul 11, 2024 · issued Aug 26, 2024 · Permit 24 178510 PLB

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposed installation of (1) double and (2) single electromagnetic locking devices.

    Applied Jun 13, 2024 · issued Jun 17, 2024 · completed Oct 18, 2024 · Permit 24 164078 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposal to repair vehicle impact damage

    Applied Mar 20, 2024 · issued Apr 9, 2024 · Permit 24 127621 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alteration to existing food cafeteria space

    Applied Jun 5, 2023 · issued Jul 26, 2023 · completed Nov 8, 2023 · Permit 23 156214 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alteration to existing food cafeteria space

    Applied Jun 5, 2023 · issued Jul 26, 2023 · completed Nov 8, 2023 · Permit 23 156214 BLD

    Closed
  • Addition or alteration · Interior alterations

    Revision 01- Fire alarm and electromagnetic locks associated with permit 22 112390 BLD 00 BA and indicated in the electrical drawings submitted for review. Renovation to three areas of a care and treatment facility. Interior fit up of an unoccupied shell space on the concourse level of the hospital. Interior alteration to an existing care and treatment area on the concourse level of the hospital. Interior alterations to an existing care and treatment area on the third floor of the hospital.

    Applied Mar 7, 2023 · issued May 4, 2023 · Permit 22 112390 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Hvac - interior alterations to ex. Radiology reading and reporting rooms to make xray diagonostic and control rooms, including installation of new equipment. Ex. W/c to be renovated

    Applied Oct 14, 2022 · issued Nov 25, 2022 · completed Jan 30, 2023 · Permit 22 213521 HVA

    Closed
  • Plumbing

    Plumbing - INTERIOR ALTERATIONS TO EX. RADIOLOGY READING AND REPORTING ROOMS TO MAKE XRAY DIAGONOSTIC AND CONTROL ROOMS, INCLUDING INSTALLATION OF NEW EQUIPMENT. EX. W/C TO BE RENOVATED

    Applied Oct 14, 2022 · issued Nov 25, 2022 · completed Jan 30, 2023 · Permit 22 213521 PLB

    Closed
  • Heating and ventilation

    HVAC - Airborne isolation rooms floors 1 and 4 associated mechanical system upgrades

    Applied Oct 5, 2022 · issued Oct 28, 2022 · completed May 8, 2025 · Permit 22 212512 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to ex. Radiology reading and reporting rooms to make xray diagonostic and control rooms, including installation of new equipment. Ex. W/c to be renovated

    Applied Oct 5, 2022 · issued Nov 25, 2022 · completed Jan 31, 2023 · Permit 22 213521 BLD

    Closed
  • Plumbing

    Plumbing - Airborne isolation rooms floors 1 and 4 associated mechanical system upgrades

    Applied Oct 3, 2022 · issued Oct 28, 2022 · completed May 8, 2025 · Permit 22 212512 PLB

    Closed
  • Addition or alteration · Interior alterations

    Airborne isolation rooms floors 1 and 4 associated mechanical system upgrades

    Applied Oct 3, 2022 · issued Oct 17, 2022 · Permit 22 212512 BLD

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Renovation to three areas of a care and treatment facility. Interior fit up of an unoccupied shell space on the concourse level of the hospital. Interior alteration to an existing care and treatment area on the concourse level of the hospital. Interior alterations to an existing care and treatment area on the third floor of the hospital.

    Applied May 2, 2022 · completed Oct 4, 2024 · Permit 22 112390 FSU

    Closed
  • Designated structure · Sign building permit related

    Application for a permit to erect and display two first party, static, non-illuminated wall signs on the south and east elevation of the building. Signs are located in Ward #21Scarborough Centre and is subject to sign district I - Institutional. Already approved by variance # 22-112918.*****SCARBOROUGH GENERAL HOSPITAL***** SIGN 1 DIMENSIONS(South Elevation):12.2m L x 4.88m W x 16.85m H***LOVE SCARBOROUGH***SIGN 2 DIMENSIONS(East Elevation):22.86m L x 4.37m W x 39.20m H***LOVE SCARBOROUGH***

    Applied Apr 11, 2022 · issued May 4, 2022 · completed Oct 21, 2022 · Permit 22 132933 DST

    Closed
  • Heating and ventilation

    HVAC - Renovation to three areas of a care and treatment facility. Interior fit up of an unoccupied shell space on the concourse level of the hospital. Interior alteration to an existing care and treatment area on the concourse level of the hospital. Interior alterations to an existing care and treatment area on the third floor of the hospital.

    Applied Feb 9, 2022 · issued Jun 3, 2022 · completed Oct 20, 2025 · Permit 22 112390 HVA

    Closed
  • Addition or alteration · Interior alterations

    Renovation to three areas of a care and treatment facility. Interior fit up of an unoccupied shell space on the concourse level of the hospital. Interior alteration to an existing care and treatment area on the concourse level of the hospital. Interior alterations to an existing care and treatment area on the third floor of the hospital.

    Applied Feb 9, 2022 · issued May 3, 2022 · Permit 22 112390 BLD

    Inspections under way
  • Plumbing

    Plumbing - Renovation to three areas of a care and treatment facility. Interior fit up of an unoccupied shell space on the concourse level of the hospital. Interior alteration to an existing care and treatment area on the concourse level of the hospital. Interior alterations to an existing care and treatment area on the third floor of the hospital.

    Applied Feb 9, 2022 · issued Jun 3, 2022 · completed Oct 20, 2025 · Permit 22 112390 PLB

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to an existing inpatient pharmacy to provide a new cleanroom (sterile prep room, ante room, staging room). A new rooftop air handler serving the cleanrooms is proposed as part of the work. Minor interior alterations and finish upgrades are proposed to support furniture systems replacement within the inpatient pharmacy and identified administration spaces supporting pharmacy operations.

    Applied Nov 23, 2021 · issued Jan 5, 2022 · Permit 21 240671 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations to an existing inpatient pharmacy to provide a new cleanroom (sterile prep room, ante room, staging room). A new rooftop air handler serving the cleanrooms is proposed as part of the work. Minor interior alterations and finish upgrades are proposed to support furniture systems replacement within the inpatient pharmacy and identified administration spaces supporting pharmacy operations.

    Applied Nov 23, 2021 · issued Jan 5, 2022 · Permit 21 240671 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to an existing inpatient pharmacy to provide a new cleanroom (sterile prep room, ante room, staging room). A new rooftop air handler serving the cleanrooms is proposed as part of the work. Minor interior alterations and finish upgrades are proposed to support furniture systems replacement within the inpatient pharmacy and identified administration spaces supporting pharmacy operations.

    Applied Nov 23, 2021 · issued Jan 4, 2022 · Permit 21 240671 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install - Maglock on a double door on 3rd floor, CW3 - Surgical Unit. Please see the attached drawing.

    Applied Oct 13, 2021 · issued Nov 18, 2021 · completed Jul 26, 2023 · Permit 21 225039 FSU

    Closed
  • Designated structure · Sign building permit related

    To erect and display eight ground signs, one of which is non-illuminated and one illuminated wall sign. Already approved by SMP # 19-257795.****SCARBOROUGH HEALTH NETWORK****

    Applied Oct 27, 2020 · issued Dec 3, 2020 · completed Dec 17, 2021 · Permit 20 211713 DST

    Closed
  • Addition or alteration · Interior alterations

    4th floor east washroom renovation

    Applied Jun 19, 2020 · issued Jul 7, 2020 · Permit 20 158261 BLD

    Permit issued
  • Plumbing

    Plumbing - 4TH FLOOR EAST WASHROOM RENOVATION

    Applied Jun 19, 2020 · issued Jul 8, 2020 · Permit 20 158261 PLB

    Inspections under way
  • Plumbing

    Plumbing - To expand NICU by two patient units with amenities, relocation of headwall units and wash basins. Existing procurment room expanded in new operating room. Existing reception and waiting room convert into storage room.

    Applied Aug 23, 2019 · issued Oct 21, 2019 · Permit 19 210618 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    To expand NICU by two patient units with amenities, relocation of headwall units and wash basins. Existing procurment room expanded in new operating room. Existing reception and waiting room convert into storage room.

    Applied Aug 23, 2019 · issued Oct 21, 2019 · completed Jan 22, 2021 · Permit 19 210618 BLD

    Closed
  • Heating and ventilation

    HVAC - To expand NICU by two patient units with amenities, relocation of headwall units and wash basins. Existing procurment room expanded in new operating room. Existing reception and waiting room convert into storage room.

    Applied Aug 23, 2019 · issued Oct 21, 2019 · completed Jun 11, 2021 · Permit 19 210618 HVA

    Closed
  • Heating and ventilation

    HVAC - Interior renovation of 1 private patient room into AIIR Room on Level 2,Interior removation of 2 patient rooms into AIIR Rooms on Level 4,Interior renovation of Nurse station and Reception area on Level 4.

    Applied Aug 7, 2019 · issued Feb 20, 2020 · Permit 19 201677 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior renovation of 1 private patient room into AIIR Room on Level 2,Interior removation of 2 patient rooms into AIIR Rooms on Level 4,Interior renovation of Nurse station and Reception area on Level 4.

    Applied Aug 7, 2019 · issued Feb 20, 2020 · Permit 19 201677 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior renovation of 1 private patient room into AIIR Room on Level 2,Interior removation of 2 patient rooms into AIIR Rooms on Level 4,Interior renovation of Nurse station and Reception area on Level 4.

    Applied Aug 7, 2019 · issued Feb 20, 2020 · Permit 19 201677 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Construct interior demolition/alterations for the Rapid Access Addition Medicine Clinic (RAAM)

    Applied Jun 25, 2018 · issued Jul 10, 2018 · completed Dec 31, 2018 · Permit 18 184211 BLD

    Closed
  • Plumbing

    Plumbing - Construct interior demolition/alterations for the Rapid Access Addition Medicine Clinic (RAAM)

    Applied Jun 25, 2018 · issued Aug 14, 2018 · completed Oct 2, 2018 · Permit 18 184211 PLB

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install two maglocks on level 4.

    Applied May 14, 2018 · issued May 30, 2018 · completed Dec 27, 2018 · Permit 18 157960 FSU

    Closed
  • Plumbing · Fixtures/Roof Drains: other

    Proposal for 2 additional sinks on first floor east wing.

    Applied Jul 19, 2017 · issued Aug 14, 2017 · Permit 17 201120 PSA

    Inspections under way
  • Addition or alteration · Interior alterations

    interior alterations to level 4 east and level 9 tower

    Applied Jun 20, 2017 · issued Aug 11, 2017 · Permit 17 183949 BLD

    Inspections under way
  • Plumbing

    Plumbing - interior alterations to level 4 east and level 9 tower

    Applied Jun 20, 2017 · issued Aug 11, 2017 · Permit 17 183949 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - interior alterations to level 4 east and level 9 tower

    Applied Jun 20, 2017 · issued Aug 11, 2017 · Permit 17 183949 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to floors 1,4 and roof.

    Applied Apr 25, 2017 · issued Aug 16, 2017 · completed Dec 11, 2018 · Permit 17 148932 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to floors 1,4 and roof.

    Applied Apr 25, 2017 · issued Aug 16, 2017 · completed Nov 21, 2018 · Permit 17 148932 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to floors 1,4 and roof.

    Applied Apr 25, 2017 · issued Aug 16, 2017 · completed Mar 12, 2019 · Permit 17 148932 BLD

    Closed
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Installation of a condensing boiler economizer into the existing steam boiler plant

    Applied Feb 15, 2017 · issued Mar 3, 2017 · completed Oct 23, 2017 · Permit 17 117214 MSA

    Closed
  • Heating and ventilation

    HVAC - Interior renovation for the "Plumbing Infrastructure Project - Decanting Phase"

    Applied Nov 29, 2016 · completed Jun 20, 2018 · Permit 16 254112 HVA

    Cancelled
  • Plumbing

    Plumbing - Interior renovation for the "Plumbing Infrastructure Project - Decanting Phase"

    Applied Nov 29, 2016 · completed Jun 20, 2018 · Permit 16 254112 PLB

    Cancelled
  • Addition or alteration · Interior alterations

    Interior renovation for the "Plumbing Infrastructure Project - Decanting Phase"

    Applied Nov 21, 2016 · completed Jun 20, 2018 · Permit 16 254112 BLD

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install one electromagnetic lock on the level 2, Scarborough Hospital.

    Applied Sep 1, 2016 · issued Sep 16, 2016 · completed Mar 9, 2017 · Permit 16 216924 FSU

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 3 premise isolation backflow preventors on existing services. The Scarborough General Hospital.

    Applied Aug 30, 2016 · issued Sep 22, 2016 · completed Feb 17, 2017 · Permit 16 215441 PSA

    Closed
  • Plumbing

    Plumbing - Nephrology department renovation, new plumbing connections for dialysis equipment, accessible shower, eyewash and neutralization tanks. Patient room partition walls will be removed to suit new room layout.

    Applied Aug 3, 2016 · issued Nov 16, 2016 · Permit 16 199771 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Nephrology department renovation, new plumbing connections for dialysis equipment, accessible shower, eyewash and neutralization tanks. Patient room partition walls will be removed to suit new room layout.

    Applied Aug 3, 2016 · issued Nov 3, 2016 · Permit 16 199771 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Nephrology department renovation, new plumbing connections for dialysis equipment, accessible shower, eyewash and neutralization tanks. Patient room partition walls will be removed to suit new room layout.

    Applied Aug 2, 2016 · issued Nov 2, 2016 · completed Jan 6, 2017 · Permit 16 199771 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposed structural and architectural alterations to occur in Acute Surgical Unit located in Level 3 Center and North West corner.

    Applied Jun 2, 2016 · issued Aug 5, 2016 · Permit 16 166534 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed structural and architectural alterations to occur in Acute Surgical Unit located in Level 3 Center and North West corner.

    Applied Jun 2, 2016 · issued Aug 25, 2016 · Permit 16 166534 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposed structural and architectural alterations to occur in Acute Surgical Unit located in Level 3 Center and North West corner.

    Applied Jun 2, 2016 · issued Aug 11, 2016 · Permit 16 166534 PLB

    Inspections under way
  • Plumbing

    Plumbing - Plumbing recirculation piping and pumps replacement. Sanitary piping replacemant, add wash basins, renovate one public washroom group, remove hopper sinks and install macerators, add domestic and sanitary services for dialysis dept

    Applied Jan 29, 2016 · issued Dec 6, 2016 · Permit 16 110552 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Plumbing recirculation piping and pumps replacement. Sanitary piping replacemant, add wash basins, renovate one public washroom group, remove hopper sinks and install macerators, add domestic and sanitary services for dialysis dept

    Applied Jan 29, 2016 · completed Jan 5, 2017 · Permit 16 110552 HVA

    Cancelled
  • Addition or alteration · Interior alterations

    Plumbing recirculation piping and pumps replacement. Sanitary piping replacemant, add wash basins, renovate one public washroom group, remove hopper sinks and install macerators, add domestic and sanitary services for dialysis dept

    Applied Jan 29, 2016 · issued Nov 23, 2016 · Permit 16 110552 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed partial interior alterations to 2nd and 3rd floor.

    Applied Jan 26, 2016 · issued Mar 30, 2016 · completed Mar 31, 2017 · Permit 16 108840 BLD

    Closed
  • Plumbing

    Plumbing - Proposed partial interior alterations to 2nd and 3rd floor.

    Applied Jan 26, 2016 · issued Mar 30, 2016 · Permit 16 108840 PLB

    Inspections under way
  • Plumbing · Fixtures/Roof Drains: other

    Interior alterations to replace existing tub with new hand sink and water closet in room 124 on the fourth floor of the tower.

    Applied Jan 7, 2015 · issued Jan 15, 2015 · Permit 15 101758 PSA

    Permit issued
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposed replacement of four (4) existing air handling units (ahu 12, ahu 16, ahu 17 and ahu 19) and two relief fans (rf-22 and 23) for The Scarborough General Hospital.

    Applied Aug 28, 2014 · issued Oct 15, 2014 · Permit 14 213383 MSA

    Inspections under way
  • Plumbing · Piping: other buildings

    Proposed addition of two new hand sinks c/w standpipes and hose connections for mobile dialysis machines - The Scarborough Hospital

    Applied Jul 31, 2014 · issued Aug 8, 2014 · Permit 14 200204 PSA

    Inspections under way
  • Heating and ventilation

    HVAC - Ground floor Interior Alteration-Reconstructed and demolish Chiller room and related services, associated with mechanical application.

    Applied Jan 21, 2013 · issued May 6, 2013 · Permit 13 109026 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Ground floor Interior Alteration-Reconstructed and demolish Chiller room and related services, associated with mechanical application.

    Applied Jan 21, 2013 · issued Apr 9, 2013 · Permit 13 109026 BLD

    Inspections under way
  • Plumbing

    Plumbing - interior alterations to CT Scan Unit ground floor diagnostic imaging department

    Applied Apr 17, 2012 · issued Jun 1, 2012 · Permit 12 155466 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    interior alterations to CT Scan Unit ground floor diagnostic imaging department

    Applied Apr 17, 2012 · issued Jun 1, 2012 · Permit 12 155466 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to 8th floor of existing Scarborough General Hospital. Convert patient space to office space for finance dept, including plumbing and some duct work

    Applied Jun 24, 2011 · issued Nov 17, 2011 · Permit 11 227024 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to 8th floor of existing Scarborough General Hospital. Convert patient space to office space for finance dept, including plumbing and some duct work

    Applied Jun 24, 2011 · issued Oct 7, 2011 · Permit 11 227024 BLD

    Permit issued
  • Plumbing

    Plumbing - Interior alterations to 8th floor of existing Scarborough General Hospital. Convert patient space to office space for finance dept, including plumbing and some duct work

    Applied Jun 24, 2011 · issued Oct 7, 2011 · Permit 11 227024 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Construct partition walls for examination rooms within existing space in Hospital, including HVAC

    Applied Jan 25, 2010 · issued Feb 25, 2010 · completed Oct 20, 2025 · Permit 10 109225 HVA

    Closed
  • Plumbing

    Plumbing - To construct a new Tim Horton's coffee kiosk inside the Scarborough Hospital - Critical Care Wing.

    Applied Apr 7, 2009 · issued May 25, 2009 · Permit 09 124060 PLB

    Inspections under way
  • Plumbing

    Plumbing - interior renovation of existing floor ( level 6), verifying if fire alarm is to code, plumbing and hvac

    Applied Dec 17, 2007 · issued Feb 13, 2008 · Permit 07 287499 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Interior altertions to second floor- expansion of dialysis program

    Applied Mar 13, 2007 · issued Jun 29, 2007 · completed Mar 27, 2026 · Permit 07 115338 HVA

    Closed
  • Plumbing

    Plumbing - Interior altertions to second floor- expansion of dialysis program

    Applied Mar 13, 2007 · issued Jun 29, 2007 · Permit 07 115338 PLB

    Inspections under way
  • Plumbing

    Plumbing - ADDITION & INTERIOR ALTERATIONS - Multiple Projects

    Applied Feb 20, 2006 · issued Oct 10, 2006 · completed Jan 3, 2024 · Permit 06 110931 PLB

    Closed
  • Drains and site services · Inside and outside drains

    Drain - ADDITION & INTERIOR ALTERATIONS - Multiple Projects

    Applied Feb 20, 2006 · issued Jul 12, 2006 · completed Jan 3, 2024 · Permit 06 110931 STS

    Closed
  • Plumbing

    Plumbing - INTERIOR ALTERATIONS "SCARBOROUGH HOSPITAL" - Interior Alterations

    Applied Oct 7, 2004 · issued Nov 4, 2004 · Permit 04 180125 PLB

    Inspections under way
  • Plumbing

    Plumbing - INTERIOR ALTERATIONS SCARBOROUGH GENERAL HOSPITAL - Interior Alterations

    Applied Jul 28, 2003 · issued Mar 11, 2004 · Permit 03 160915 PLB

    Inspections under way
  • Temporary structure · Temporary structures

    Temporary intern's quarters for hospital

    Applied Apr 17, 2003 · issued Sep 17, 2003 · completed Apr 24, 2020 · Permit 03 124970 TPS

    Closed
  • Plumbing · Piping: other buildings

    Site services for hospital

    Applied Jul 18, 2002 · issued Oct 28, 2002 · completed Jun 9, 2021 · Permit 02 155474 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.