Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

309 Westwood Ave

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    bwv installation

    Applied May 18, 2022 · issued May 30, 2022 · completed Jun 27, 2022 · Permit 22 148577 DRN

    Closed
  • Small residential project · Finishing basements

    REVISION01: Proposal to remove load bearing wall at first floor.Proposal for interior alterations to finish the basement of an existing SFD-detached dwelling.

    Applied May 10, 2016 · issued May 11, 2016 · completed Feb 2, 2026 · Permit 15 156003 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to finish the basement of an existing SFD-detached dwelling.

    Applied May 13, 2015 · issued May 15, 2015 · completed Feb 2, 2026 · Permit 15 156003 PLB

    Closed
  • Small residential project · Finishing basements

    Proposal for interior alterations to finish the basement of an existing SFD-detached dwelling.

    Applied May 13, 2015 · issued May 15, 2015 · completed Feb 2, 2026 · Permit 15 156003 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 270 Floyd Ave · Consent

    To obtain consent to sever the merged property into three residential lots.

    150 m away · filed Dec 10, 2024 · Approved

  • 190 Donlands Ave · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    200 m away · filed May 14, 2024 · Application withdrawn

  • 188 Donlands Ave · Consent

    To obtain consent to sever the property into two residential lots and to maintain an existing easement/right-of-way.

    200 m away · filed Aug 21, 2023 · Approved

  • 188 Donlands Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite with a rear [west] second storey juliette balcony), in the rear yard, abutting the laneway. The existing ancillary building (semi-detached garage) in the rear yard, will be demolished. Also, the existing two-storey detached main dwelling will be maintained and unaltered.

    200 m away · filed Aug 21, 2023 · Approved

  • 190 Donlands Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite with a rear [west] second storey juliette balcony), in the rear yard, abutting the laneway and Kings Park Boulevard. The existing ancillary building (semi-detached garage) in the rear yard, will be demolished. Also, the existing two-storey detached main dwelling will be maintained and unaltered.

    200 m away · filed Aug 21, 2023 · Approved

  • 323 Mortimer Ave · Minor variance

    To maintain the existing three-storey semi-detached dwelling.

    80 m away · filed Apr 14, 2023 · Approved

  • 323 Mortimer Ave · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    80 m away · filed Apr 14, 2023 · Approved

  • 269 Donlands Ave · Minor variance

    To permit a fourth dwelling unit within the existing triplex. This dwelling has one basement unit, two ground floor units, and one second level unit and a front basement walkout.

    110 m away · filed Jan 30, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.