Toronto address · Ward 21, Scarborough Centre

3091 Lawrence Ave E

The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Temporary structure · Temporary structures

    Proposal to place the temporary site trailers in the laydown area for the proposed Lawrence East station

    Applied Jun 16, 2025 · issued Aug 13, 2025 · Permit 25 177724 TPS

    Inspections under way
  • Drains and site services · Site service

    1- Storm Water Services: Installation as shown in drawing 2265-001-25 L CIVIL 25-06-02 (R1), including underground storage tank (UGS), oil and grit separator (OGS), storm manholes, and catch basins in the laydown area.2- Sanitary Services: To capture discharge from the bentonite plant, dewatering activities, and site washrooms.3- Water Services: To provide temporary feed to the bentonite plant, site washrooms, and the STC trailer.

    Applied Jun 12, 2025 · issued Mar 24, 2026 · Permit 25 176212 STS

    Permit issued
  • Designated structure · Retaining wall

    The proposed scope includes the installation of a lock-block retaining wall within the construction laydown area to provide temporary earth retention and grade separation. The wall will consist of precast concrete lock blocks with keyed interlocking features.

    Applied May 21, 2025 · issued Jun 3, 2025 · Permit 25 162910 DST

    Inspections under way
  • Demolition

    Demolition of existing building structure for future station building for the Scarborough Subway Extension Project.

    Applied Dec 12, 2022 · issued Jan 4, 2023 · completed Aug 23, 2023 · Permit 22 238456 DEM

    Closed
  • Heating and ventilation · HVAC: groups D & E

    Interior fit up of bank branch, minor alteration of existing hvac route in team lounge area

    Applied Jun 19, 2019 · issued Jul 17, 2019 · completed Aug 21, 2019 · Permit 19 174471 MSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.