Toronto address · Ward 22, Scarborough-Agincourt
31 Davisbrook Blvd
The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REVISION - addition of walkout stair, shed and interior alteration at ground and second floorProposal for multiple projects: addition for three levels = 94.46 m2; interior alterations for three levels = 236.43 m2; new porch and a new walkout; creation of second unit in the basement
Applied Feb 26, 2026 · issued Apr 1, 2026 · Permit 24 245928 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal for multiple projects including adding wall, replace closet with bathroom, interior alteration to basement, ground and second floor
Applied Dec 2, 2024 · issued Mar 6, 2025 · Permit 24 245928 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for multiple projects including adding wall, replace closet with bathroom, interior alteration to basement, ground and second floor
Applied Dec 2, 2024 · issued Dec 16, 2024 · Permit 24 245928 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for multiple projects: addition for three levels = 94.46 m2; interior alterations for three levels = 236.43 m2; new porch and a new walkout; creation of second unit in the basement
Applied Dec 2, 2024 · issued Dec 16, 2024 · 1 home added · Permit 24 245928 BLD
- Cancelled
Small residential project · Multiple projects
Proposed multiple projects to include conversion from single family dwelling to two-unit dwelling, basement level, ground and second-floor front addition.
Applied Oct 16, 2024 · completed Oct 28, 2024 · 1 home added · Permit 24 226970 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
3459-3471 Sheppard Avenue East
12 storeys · 201 homes · Mixed use
380 m away · Site plan · Under review · filed Mar 31, 2023
- Approved
3421-3445 Sheppard Avenue East
14 storeys · 378 homes · Mixed use
430 m away · Condominium · Approved · filed Apr 2, 2024
Neighbours’ Committee of Adjustment files within 250 m
16 Marblemount Cres · Minor variance
To construct a new two-storey detached dwelling.
240 m away · filed Nov 23, 2020 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.