Toronto address · Ward 20, Scarborough Southwest
31 Fallingbrook Cres
The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REV #1 installing 2 more runsHVAC - New 2 storey single family dwelling
Applied Jan 10, 2012 · issued Jan 31, 2012 · Permit 09 184837 HVA (revision 01)
- Closed
Demolition
Demolish existing 2 storey dwelling
Applied Nov 4, 2009 · issued Sep 22, 2011 · completed Jan 4, 2017 · Permit 09 185349 DEM
- Inspections under way
Plumbing
Plumbing - New 2 storey single family dwelling
Applied Nov 3, 2009 · issued Sep 22, 2011 · Permit 09 184837 PLB
- Inspections under way
Heating and ventilation
HVAC - New 2 storey single family dwelling
Applied Nov 3, 2009 · issued Sep 22, 2011 · Permit 09 184837 HVA
- Inspections under way
New house · New building
New 2 storey single family dwelling
Applied Nov 3, 2009 · issued Sep 22, 2011 · 1 home added · Permit 09 184837 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
16 Fallingbrook Dr · Minor variance
To construct a new second floor addition above the existing garage.
80 m away · filed Aug 18, 2026 · Hearing scheduled
46 Fallingbrook Dr · Minor variance
To construct an addition to the existing dwelling.
150 m away · filed Oct 25, 2024 · Approved
34 Fallingbrook Dr · Minor variance
To demolish the existing dwelling and to construct a new detached three storey dwelling. This application was previously deferred at the March 2024 hearing.
150 m away · filed Jan 4, 2024 · Approved
12 Fallingbrook Wds · Minor variance
To construct an ancillary building and to alter the existing dwelling with interior alterations, a 3rd floor addition, rear addition and 1-storey front addition. A previous minor variance application was approved in February 2023 MV#A0256/22SC.
100 m away · filed Sep 26, 2023 · Approved
46 Fallingbrook Rd · Minor variance
To construct two rear yard sheds with a pool and to construct interior alterations on the second floor.
150 m away · filed May 12, 2023 · Approved
1 Fallingbrook Rd · Minor variance
To construct additions to the existing dwelling.
250 m away · filed Mar 15, 2023 · Approved
7 Fallingbrook Wds · Minor variance
To construct a new enclosure over existing porch, first floor rear addition and second floor rear addition to extend existing stair landing. Also a second floor front addition.
70 m away · filed Nov 29, 2022 · Approved
12 Fallingbrook Wds · Minor variance
To construct a third floor addition, rear addition, front addition and interior alterations to existing dwelling.
100 m away · filed Nov 10, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.