The City of Toronto has 22 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Inside and outside drains
Drain - Proposed building renovation, exterior staircase, basement pit, floor slab and new door openings to existing telecommunication service building
Applied Oct 3, 2022 · issued Nov 17, 2022 · completed Mar 22, 2025 · Permit 22 212332 STS
- Closed
Addition or alteration · Other
Proposed building renovation, exterior staircase, basement pit, floor slab and new door openings to existing telecommunication service building
Applied Oct 3, 2022 · issued Nov 16, 2022 · completed Oct 17, 2025 · Permit 22 212332 BLD
- Closed
Heating and ventilation
HVAC - Proposed building renovation, exterior staircase, basement pit, floor slab and new door openings to existing telecommunication service building
Applied Oct 3, 2022 · issued Nov 16, 2022 · completed Mar 22, 2025 · Permit 22 212332 HVA
- Closed
Drains and site services · Site service
Replacement/relocation of storm drains, relocation of domestic cold water piping, lining of sanitary drain pipes
Applied Oct 29, 2019 · issued Dec 6, 2019 · completed Dec 17, 2020 · Permit 19 242463 STS
- Closed
Plumbing · Piping: other buildings
Replacement/relocation of storm drains, relocation of domestic cold water piping, lining of sanitary drain pipes
Applied Oct 29, 2019 · issued Dec 9, 2019 · completed Dec 17, 2020 · Permit 19 242436 PSA
- Closed
Addition or alteration · Other
Proposed installation of a new equipment area air-conditioning unit for an existing office building. Structural work required in relation to 19-160891 MSA.
Applied Jun 26, 2019 · issued Aug 23, 2019 · completed Nov 5, 2020 · Permit 19 178706 BLD
- Inspections under way
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Proposed installation of a new computer room air-conditioning unit for an existing office building.
Applied May 28, 2019 · issued Jul 23, 2019 · Permit 19 160891 MSA
- Closed
Heating and ventilation
HVAC - Basement Boiler Room: replace existing door, extend landing including stairs, demolish existing and construct new concrete housekeeping pads, and install new containment curb.Basement Standby Power Room: demolish existing and provide new concrete housekeeping pads.3rd Floor Storage Room: construct new wall to separate room into two, provide new door for each room, install new domestic cold water line, drain, ventilation and containment curb in new M&E Room.
Applied Feb 9, 2018 · issued Mar 21, 2018 · completed Feb 5, 2019 · Permit 18 115702 HVA
- Closed
Addition or alteration · Interior alterations
Basement Boiler Room: replace existing door, extend landing including stairs, demolish existing and construct new concrete housekeeping pads, and install new containment curb.Basement Standby Power Room: demolish existing and provide new concrete housekeeping pads.3rd Floor Storage Room: construct new wall to separate room into two, provide new door for each room, install new domestic cold water line, drain, ventilation and containment curb in new M&E Room.
Applied Feb 9, 2018 · issued Mar 20, 2018 · completed Feb 19, 2019 · Permit 18 115702 BLD
- Closed
Plumbing
Plumbing - Basement Boiler Room: replace existing door, extend landing including stairs, demolish existing and construct new concrete housekeeping pads, and install new containment curb.Basement Standby Power Room: demolish existing and provide new concrete housekeeping pads.3rd Floor Storage Room: construct new wall to separate room into two, provide new door for each room, install new domestic cold water line, drain, ventilation and containment curb in new M&E Room.
Applied Feb 9, 2018 · issued Mar 21, 2018 · completed Feb 14, 2019 · Permit 18 115702 PLB
- Closed
Addition or alteration · Addition(s)
Installation of new structure on rooftop to support two (2) new enclosed generators, including relocation of existing condensers on rooftop to suit.
Applied Dec 22, 2017 · issued Mar 15, 2018 · completed Feb 10, 2019 · Permit 17 278698 BLD
- Closed
Plumbing
Plumbing - Additional cooling capacity to existing server room.Additional condensate drain for new computer room air conditioning system, new ductwork and new exterior wall louver.
Applied Sep 25, 2017 · issued Jan 3, 2018 · completed Feb 25, 2019 · Permit 17 238113 PLB
Show 10 more permits
- Closed
Heating and ventilation
HVAC - Additional cooling capacity to existing server room.Additional condensate drain for new computer room air conditioning system, new ductwork and new exterior wall louver.
Applied Sep 25, 2017 · issued Jan 3, 2018 · completed Feb 5, 2019 · Permit 17 238113 HVA
- Closed
Addition or alteration · Interior alterations
Additional cooling capacity to existing server room.Additional condensate drain for new computer room air conditioning system, new ductwork and new exterior wall louver.
Applied Sep 25, 2017 · issued Dec 22, 2017 · completed Feb 21, 2019 · Permit 17 238113 BLD
- Closed
Fire and security upgrade · Fire alarm
Upgrade fire alarm at Bell Canada
Applied Sep 30, 2016 · issued Oct 31, 2016 · completed Oct 17, 2025 · Permit 16 231157 FSU
- Closed
Addition or alteration · Interior alterations
Converting office space and lunch room on 1st floor to new electrical room. Construction of an outdoor electrical substation.
Applied Jul 29, 2016 · issued Aug 31, 2016 · completed Feb 11, 2019 · Permit 16 199284 BLD
- Closed
Heating and ventilation
HVAC - Converting office space and lunch room on 1st floor to new electrical room. Construction of an outdoor electrical substation.
Applied Jul 29, 2016 · issued Aug 31, 2016 · completed Feb 5, 2019 · Permit 16 199284 HVA
- Closed
Plumbing
Plumbing - Converting office space and lunch room on 1st floor to new electrical room. Construction of an outdoor electrical substation.
Applied Jul 29, 2016 · issued Aug 31, 2016 · completed Feb 14, 2019 · Permit 16 199284 PLB
- Closed
Addition or alteration · Interior alterations
Bell Canada equipment building - Partial 3rd floor
Applied Jun 27, 2013 · issued Jul 19, 2013 · completed Oct 17, 2025 · Permit 13 195267 BLD
- Permit issued
Addition or alteration · Other
Removal and replacement of front entrance stairs - Bell Nexacor Utilities Facility
Applied Apr 11, 2011 · issued Apr 29, 2011 · Permit 11 171226 BLD
- Closed (dormant)
Addition or alteration · Interior alterations
make interior alterations for back up generator in Bell Canada switching building.
Applied Aug 24, 2006 · issued Sep 14, 2006 · completed Jun 8, 2026 · Permit 06 170220 BLD
- Inspections under way
Non-residential building permit · Alteration to existing building
Install 4 maglocks to 3 storey office building.
Applied Oct 31, 2000 · issued Nov 28, 2000 · Permit 00 350312 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
32-38 Olive Avenue and 31 Finch Avenue East
29 storeys · 350 homes · Residential
50 m away · Site plan · Approved · filed Oct 19, 2021
- Now selling
- Under review
35 storeys · 608 homes · Mixed use
250 m away · Site plan · Under review · filed Aug 12, 2022
- Under appeal
46 storeys · 433 homes · Residential
470 m away · Rezoning · Under appeal · filed Dec 20, 2024
- Under review
11 storeys · Mixed use
480 m away · Site plan · Under review · filed Jul 31, 2026
- Under review
38-42 Finch Avenue West, 2-4 Greenview Avenue and 7 Eldora Avenue
46 storeys · 636 homes · Mixed use
490 m away · Rezoning · Under review · filed Nov 24, 2025
Neighbours’ Committee of Adjustment files within 250 m
5580 Yonge St · Minor variance
To permit a video games arcade use accessory to the retail use. The existing retail use will be maintained. No physical interior or exterior changes are being proposed.
200 m away · filed May 1, 2025 · Approved
32 Olive Ave · Minor variance
Proposal to alter the development standards, inclouding height, density, and other technical matters, of the previously approved Site Specific by-law 893-2022.
50 m away · filed Mar 1, 2024 · Approved
50 Finch Ave E · Minor variance
Proposal to constuct a 10-storey mixed use building.
130 m away · filed Mar 25, 2022 · Deferred
32 Olive Ave · Consent
Proposed non-exclusive easement to permit the construction, operation, and future maintenance of telecommunications facilities over Part 1 shown on Draft Reference Plan in favour of Parts 4, being the Bell Property.
50 m away · filed Mar 11, 2022 · Approved
5600 Yonge St · Minor variance
To convert the second floor into a restaurant.
210 m away · filed Oct 2, 2020 · Approved
463 Kenneth Ave · Minor variance
To construct a new two-torey dwelling. The existing dwelling would be demolished.
160 m away · filed Jun 27, 2017 · Approved
5607 Yonge St · Minor variance
To permit a reduced number of parking spaces for the proposed restaurant.
160 m away · filed May 5, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.