Toronto address · Ward 14, Toronto-Danforth
31 Greenwood Ave
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Other
REV01: Proposed revision as per drawingsRevision 01 ¿ Please refer to all bubbled areas on the drawings for the indicated changes. Theproposal is to revise the scope of work from including a secondary unit in the basement to finishing the existing unfinished basement, under active building permit #24 198162 BLD 00 SR. [NK- Oct. 22, 2024]Original Permit: PROPOSED SECONDARY UNIT IN THE BASEMENT
Applied Oct 17, 2024 · completed Oct 22, 2024 · Permit 24 198162 BLD (revision 01)
- Closed
Heating and ventilation
Hvac - proposed secondary unit in the basement
Applied Sep 28, 2024 · issued Nov 18, 2024 · completed Jan 14, 2025 · Permit 24 198162 HVA
- Closed
Plumbing
Plumbing - PROPOSED SECONDARY UNIT IN THE BASEMENT
Applied Aug 14, 2024 · issued Aug 23, 2024 · completed Jan 14, 2025 · Permit 24 198162 PLB
- Closed
Drains and site services
Drain - PROPOSED SECONDARY UNIT IN THE BASEMENT
Applied Aug 14, 2024 · issued Aug 26, 2024 · completed Oct 16, 2024 · Permit 24 198162 DRN
- Closed
Small residential project · Other
Proposed secondary unit in the basement
Applied Aug 14, 2024 · issued Aug 21, 2024 · completed Jan 14, 2025 · Permit 24 198162 BLD
- Closed
Small residential project · Underpinning
Rev 01: Revised bench footing to full party wall underpinning & added new basement walkout.To underpin the basement and increase the wall height by 2 feet.
Applied Aug 17, 2015 · issued Sep 15, 2015 · completed Oct 7, 2024 · Permit 14 215819 BLD (revision 01)
- Closed
Small residential project · Underpinning
To underpin the basement and increase the wall height by 2 feet.
Applied Sep 3, 2014 · issued May 22, 2015 · completed Oct 7, 2024 · Permit 14 215819 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · 26 homes · Residential
270 m away · Site plan · Under review · filed May 11, 2022
- Under review
880-882 Eastern Avenue and 80 Knox Avenue
12 storeys · 167 homes · Mixed use
340 m away · Site plan · Under review · filed May 4, 2022
- Approved
7 storeys · 227 homes · Residential
360 m away · Site plan · Approved · filed Dec 23, 2022
- Approved
1233-1243 Queen Street East and 77 Leslie Street
9 storeys · 142 homes · Mixed use
480 m away · Site plan · Approved · filed Mar 17, 2022
Neighbours’ Committee of Adjustment files within 250 m
38 Kerr Rd · Minor variance
To construct a new rear two-storey detached ancillary building (garden suite) with a basement, and a cantilevered second storey with a side (east) juliet balcony. There will be two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).
160 m away · filed Aug 20, 2026 · Postponed
25 Hiltz Ave · Minor variance
To permit and maintain the existing front (west) staircase and platform (leading to the front enclosed porch) that was partially constructed beyond an authorized building permit (Permit No.19 229066 BLD 00 SR). The existing front enclosed porch and front third-storey balcony on the three-storey detached dwelling will be maintained and unaltered.
110 m away · filed Dec 18, 2025 · Refused
19 Alton Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front covered porch extension, and a rear two-storey addition with a deck and stairs.
230 m away · filed Nov 25, 2025 · Approved
1320 Queen St E · Minor variance
To alter the existing two-storey semi-detached residential dwelling by constructing a rear one-storey addition, a front basement walkout with stairs, a rear ground floor deck with stairs, and a rear second storey rooftop deck Also, to convert the existing semi-detached residential dwelling into a mixed-use building by constructing interior alterations for a new commercial unit in the basement and a new third residential dwelling unit on the first storey. There will be a total of three residential dwelling units on this lot.
250 m away · filed Jul 24, 2025 · Approved
46 Kerr Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a deck and stairs.
170 m away · filed Apr 16, 2025 · Approved
54 Kerr Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the front porch into habitable space, and to constructing a new front porch with stairs, a rear two-storey addition with a new ground level deck.
200 m away · filed Apr 14, 2025 · Approved
56 Greenwood Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition and a rear second storey balcony.
60 m away · filed Sep 20, 2024 · Approved
99 Knox Ave · Consent
To obtain consent to sever the property into two residential lots.
250 m away · filed Aug 2, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.