Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Interior alterations
Tenant improvement work for designated office and storage areas - PHASE 1 - DC7 Phase 2C
Applied Feb 19, 2021 · issued Mar 24, 2021 · Permit 21 118146 BLD
- Inspections under way
Heating and ventilation
HVAC - Tenant improvement work for designated office and storage areas - PHASE 1 - DC7 Phase 2C
Applied Feb 19, 2021 · issued Apr 16, 2021 · Permit 21 118146 HVA
- Closed
Heating and ventilation
REVISION - as per the drawingsHVAC - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
Applied Feb 16, 2021 · issued Sep 20, 2021 · completed Sep 23, 2021 · Permit 19 146104 HVA (revision 01)
- Revision issued
Addition or alteration · Multiple projects
REVISION - Combined interior data halls 7&8 to be one large data hall 7, enlarged data halls 5&6 and relocate corridors 111&112, eliminated storage room 121, modified size of tenant storage room 120, added a unisex washroom 217b.ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
Applied Feb 16, 2021 · issued Sep 20, 2021 · Permit 19 146104 BLD (revision 01)
- Response received
Plumbing
REVISION - as per the drawingsPlumbing - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
Applied Feb 16, 2021 · Permit 19 146104 PLB (revision 02)
- Permit issued
Fire and security upgrade · Electromagnetic locks
install 3 maglocks on high security doors in Phase 2 side of facility
Applied Dec 11, 2020 · issued Jan 29, 2021 · Permit 20 228389 FSU
- Cancelled
Plumbing
Revision #01 - Plumbing - Changes to add a duplex grinder pump systemPlumbing - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
Applied Oct 7, 2020 · completed Oct 30, 2020 · Permit 19 146104 PLB (revision 01)
- Closed
Plumbing
Revision #01 - Washrooms and maglocks have been removed and the area of interior alteration has been increased. Plumbing - Tenant improvement work for designated office and storage areas in an existing industrial building
Applied Sep 8, 2020 · issued Oct 28, 2020 · completed Nov 13, 2020 · Permit 19 248441 PLB (revision 01)
- Revision issued
Fire and security upgrade · Electromagnetic locks
REV 01 - Changes as per drawing Maglock location has been modified. Proposal to install 1 magnetic lock related to the installation of a new door
Applied Jul 20, 2020 · issued Aug 24, 2020 · Permit 19 248471 FSU (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision #01 - Washrooms and maglocks have been removed and the area of interior alteration has been increased.Tenant improvement work for designated office and storage areas in an existing industrial building
Applied May 26, 2020 · issued Jul 30, 2020 · Permit 19 248441 BLD (revision 01)
- Closed
Heating and ventilation
Revision #01 - Washrooms and maglocks have been removed and the area of interior alteration has been increased.HVAC - Tenant improvement work for designated office and storage areas in an existing industrial building
Applied May 26, 2020 · issued Jul 30, 2020 · completed Sep 22, 2020 · Permit 19 248441 HVA (revision 01)
- Closed
Plumbing
Plumbing - Tenant improvement work for designated office and storage areas in an existing industrial building
Applied Nov 13, 2019 · issued Feb 10, 2020 · completed Nov 13, 2020 · Permit 19 248441 PLB
Show 21 more permits
- Closed
Heating and ventilation
HVAC - Tenant improvement work for designated office and storage areas in an existing industrial building
Applied Nov 13, 2019 · issued Mar 4, 2020 · completed Sep 22, 2020 · Permit 19 248441 HVA
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Proposal to install 1 magnetic lock related to the installation of a new door
Applied Nov 13, 2019 · issued Dec 16, 2019 · Permit 19 248471 FSU
- Inspections under way
Addition or alteration · Interior alterations
Tenant improvement work for designated office and storage areas in an existing industrial building
Applied Nov 13, 2019 · issued Feb 10, 2020 · Permit 19 248441 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install six magnetic lock on high security doors within the existing facility on existing doors.
Applied Oct 7, 2019 · issued Nov 6, 2019 · completed Oct 3, 2024 · Permit 19 232895 FSU
- Closed
Plumbing
Revision # 02 - To use stainless steel piping as per 19-171536 ALT 00 AS.Revision to plumbing see attached for description. Deleted HRV 4 and added individual HVAC units for Data Centres with associated plumbing/drainage work. Plumbing - Proposal to demolish a portion of the existing building at the rear with interior alterations.
Applied Jul 9, 2019 · issued Jul 12, 2019 · completed Jan 20, 2020 · Permit 18 207287 PLB (revision 02)
- Approved
Alternative solution
Proposal to use 10 gauge 304 stainless steel with welded joints for the rain water leaders. As per permit application 18-207287 PLB 01.
Applied Jun 14, 2019 · completed Jul 2, 2019 · Permit 19 171536 ALT
- Inspections under way
Addition or alteration · Multiple projects
Add new data centre to existing industrial building. Phase 2
Applied Apr 29, 2019 · issued Aug 22, 2019 · Permit 19 146104 BLD
- Closed
Drains and site services · Inside and outside drains
Drain - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING.PHASE 2
Applied Apr 29, 2019 · issued Aug 22, 2019 · completed Aug 24, 2021 · Permit 19 146104 STS
- Closed
Heating and ventilation
Hvac - add new data centre to existing industrial building. Phase 2
Applied Apr 29, 2019 · issued Aug 22, 2019 · completed Sep 23, 2021 · Permit 19 146104 HVA
- Inspections under way
Plumbing
Plumbing - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
Applied Apr 29, 2019 · issued Aug 23, 2019 · Permit 19 146104 PLB
- Closed
Heating and ventilation
Revision to heating - Deleted HRV 4 and added individual HVAC units for Data Centers. HVAC - Proposal to demolish a portion of the existing building at the rear with interior alterations.
Applied Jan 11, 2019 · issued May 22, 2019 · completed Mar 2, 2020 · Permit 18 207287 HVA (revision 01)
- Closed
Plumbing
Revision to plumbing see attached for description. Deleted HRV 4 and added individual HVAC units for Data Centers with associated plumbing/drainage work. Plumbing - Proposal to demolish a portion of the existing building at the rear with interior alterations.
Applied Jan 11, 2019 · issued May 22, 2019 · completed Jan 20, 2020 · Permit 18 207287 PLB (revision 01)
- Closed
Drains and site services · Site service
Proposal to demolish a portion of the existing building at the rear with interior alterations.
Applied Oct 25, 2018 · issued Nov 12, 2018 · completed Jan 20, 2020 · Permit 18 247767 STS
- Closed
Plumbing
Plumbing - Proposal to demolish a portion of the existing building at the rear with interior alterations.
Applied Aug 10, 2018 · issued Nov 9, 2018 · completed Jan 20, 2020 · Permit 18 207287 PLB
- Closed
Heating and ventilation
HVAC - Proposal to demolish a portion of the existing building at the rear with interior alterations.
Applied Aug 10, 2018 · issued Nov 13, 2018 · completed Mar 2, 2020 · Permit 18 207287 HVA
- Closed
Addition or alteration · Interior alterations
Proposal to demolish a portion of the existing building at the rear with interior alterations.
Applied Aug 10, 2018 · issued Oct 5, 2018 · completed Aug 26, 2020 · Permit 18 207287 BLD
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
Install 2 in. backflow prevention device in existing macufacturing plant.
Applied Aug 31, 2009 · issued Sep 22, 2009 · Permit 09 163903 PSA
- Inspections under way
Plumbing
Plumbing - Proposed sprinkler system upgrade, external/internal tanks, O/H door, fire pump house construction - Multiple Projects
Applied Nov 26, 2004 · issued Apr 25, 2005 · Permit 04 163534 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposed sprinkler system upgrade, external/internal tanks, O/H door, fire pump house construction - Multiple Projects
Applied Aug 9, 2004 · issued Apr 25, 2005 · Permit 04 163534 HVA
- Closed
Addition or alteration · Multiple projects
Proposed sprinkler system upgrade, external/internal tanks, O/H door, fire pump house construction
Applied Aug 5, 2004 · issued Apr 25, 2005 · completed Aug 21, 2026 · Permit 04 163534 BLD
- Closed (dormant)
Addition or alteration · Multiple projects
Construction & erection of 2 silos with vacuum blower for silos with foundations, chiller foundation slab on the exterior and installation of access catwalk for process piping support on interior
Applied Jul 8, 2004 · issued Sep 24, 2004 · completed Jun 8, 2026 · Permit 04 154251 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · NR addition
To permit a parking deficiency for a Software Development and Processing use.
Decision: Approved (hearing Nov 22, 2018)
Filed Oct 15, 2018 · File A0754/18EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
330 Humberline Dr · Minor variance
To construct a new loading facility on the north side of the existing industrial building.
210 m away · filed Sep 20, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.