Toronto address · Ward 13, Toronto Centre
311 Bay St
The City of Toronto has 21 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations to the existing condo unit.
Applied May 31, 2022 · issued Jul 11, 2022 · Permit 22 154478 BLD
- Closed
Addition or alteration · Interior alterations
Revision to electrical components - St. Regis residential lobby
Applied Feb 7, 2019 · issued Feb 11, 2019 · completed Jul 16, 2020 · Permit 18 193709 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Interior Alterations unit 5403
Applied Aug 23, 2018 · issued Sep 24, 2018 · Permit 18 214256 PLB
- Inspections under way
Heating and ventilation
HVAC - Interior Alterations unit 5403
Applied Aug 23, 2018 · issued Sep 24, 2018 · Permit 18 214256 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior Alterations unit 5403
Applied Aug 23, 2018 · issued Sep 11, 2018 · Permit 18 214256 BLD
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Interior alterations to the 32nd floor - St. Regis residential lobby
Applied Jul 16, 2018 · issued Jul 6, 2020 · completed Jul 13, 2020 · Permit 18 193709 FSU
- Closed
Heating and ventilation
HVAC - Interior alterations to the 32nd floor - St. Regis residential lobby
Applied Jul 13, 2018 · issued Aug 10, 2018 · completed Jul 13, 2020 · Permit 18 193709 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to the 32nd floor - St. Regis residential lobby
Applied Jul 13, 2018 · issued Jul 27, 2018 · completed Jul 16, 2020 · Permit 18 193709 BLD
- Closed
Plumbing
Plumbing - Interior alterations to the 32nd floor - St. Regis residential lobby
Applied Jul 13, 2018 · issued Aug 10, 2018 · completed Jul 15, 2020 · Permit 18 193709 PLB
- Closed
New building
Occupant load approval for liquor license purposes for L31 Sky Lobby and Terrance (total occupant load = 40).
Applied Mar 13, 2013 · issued Mar 27, 2013 · completed Jun 27, 2017 · Permit 07 185757 BLD (revision 05)
- Closed
Addition or alteration · Interior alterations
REVISION: This is a revision to show the occupant load on the drawings.This is for the tenant fit out of the upper and lower spa portions of the building on level 30 of the "TRUMP INTERNATIONAL HOTEL AND TOWER".
Applied Apr 18, 2012 · issued Apr 25, 2012 · completed Jun 27, 2017 · Permit 11 281651 BLD (revision 01)
- Closed
New building
REVISION - to increase the occupant load on levels LG, L30, L30(U), and L31Proposal to construct a 59 sty hotel, condo, office, & commercial tower with below grade storage and loading. "Trump Tower". 118 new residential units.
Applied Jan 12, 2012 · issued Jan 17, 2012 · completed Jun 27, 2017 · Permit 07 185757 BLD (revision 03)
Show 9 more permits
- Closed
New building
REVISION - to increase the occupant load on level 9Proposal to construct a 59 sty hotel, condo, office, & commercial tower with below grade storage and loading. "Trump Tower". 118 new residential units.
Applied Nov 15, 2011 · issued Nov 17, 2011 · completed Jun 27, 2017 · Permit 07 185757 BLD (revision 02)
- Closed
Addition or alteration · Interior alterations
This is for the tenant fit out of the upper and lower spa portions of the building on level 30 of the "TRUMP INTERNATIONAL HOTEL AND TOWER".
Applied Sep 26, 2011 · issued Oct 3, 2011 · completed Jun 27, 2017 · Permit 11 281651 BLD
- Closed
Plumbing
Revision for as built construction to Trump Tower.
Applied Jul 14, 2010 · issued Feb 17, 2011 · completed Jun 27, 2017 · Permit 07 185757 PLB (revision 01)
- Closed
Heating and ventilation
Revision for as built construction to Trump Tower.
Applied Jul 14, 2010 · issued Feb 17, 2011 · completed Jun 27, 2017 · Permit 07 185757 HVA (revision 01)
- Closed
New building
Revision for as built construction to Trump Tower.
Applied Jul 12, 2010 · issued Feb 17, 2011 · completed Jun 27, 2017 · Permit 07 185757 BLD (revision 01)
- Closed
Heating and ventilation
/HVAC - Proposal to construct a 59 sty hotel, condo, office, & commercial tower with below grade storage and loading. "Trump Tower". 118 new residential units.For plans see Building permit file
Applied Aug 11, 2008 · issued Mar 18, 2009 · completed Jun 27, 2017 · Permit 07 185757 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a 59 sty hotel, condo, office, & commercial tower with below grade storage and loading. "Trump Tower". 118 new residential units.
Applied Aug 11, 2008 · issued Aug 12, 2008 · completed Jun 27, 2017 · Permit 07 185757 PLB
- Closed
Heating and ventilation
Part Mech permit for below grade in connection with BLD 07 185757.
Applied Aug 15, 2007 · issued Jan 8, 2008 · completed Jun 27, 2017 · Permit 07 253520 HVA
- Closed
New building
Proposal to construct a 59 sty hotel, condo, office, & commercial tower with below grade storage and loading. "Trump Tower". 118 new residential units.
Applied May 1, 2007 · issued Aug 11, 2008 · completed Jun 27, 2017 · 118 homes added · Permit 07 185757 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1-3 King Street East and 69-71 Yonge Street
15 storeys · 127 homes · Residential
230 m away · Site plan · Under review · filed Nov 7, 2021
- Under review
187-199 Bay Street, 18-30 Wellington Street West and 3 other streets
64 storeys · Residential
250 m away · Site plan · Under review · filed Aug 26, 2021
- Under review
65 storeys · 649 homes · Mixed use
270 m away · Site plan · Under review · filed Apr 7, 2025
- Under review
68 storeys · 836 homes · Residential
290 m away · Rezoning · Under review · filed Oct 21, 2024
- Under review
66 storeys · 511 homes · Mixed use
290 m away · Site plan · Under review · filed Apr 27, 2022
- Under review
60 storeys · 256 homes · Mixed use
310 m away · Condominium · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
20 King St W · Minor variance
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
110 m away · filed May 6, 2026 · Approved
67 Richmond St W · Minor variance
To construct an outdoor patio in the West side yard and rear yard of the existing seven-storey mixed-use building.
170 m away · filed Dec 18, 2020 · Approved
330 Bay St · Minor variance
To alter the existing 11-storey mixed-use building by increasing the usable floor area at the first and second storey.
80 m away · filed Sep 16, 2020 · Approved
365 Bay St · Minor variance
To alter the existing commercial building by converting the basement, ground, and mezzanine levels to an eating establishment (greater than 30 seats). An expansion of the existing mezzanine will be constructed to accommodate mechanical space, elevators and access stairs.
140 m away · filed Sep 27, 2017 · Approved
85 Richmond St W · Minor variance
To alter the existing office building by facilitating heritage restoration, recladding and the addition of non-residential gross floor area to the rear of the building.
230 m away · filed May 15, 2017 · Approved
1 Adelaide St E · Minor variance
To construct two outdoor patios to be associated with restaurant uses in the east courtyard area.
190 m away · filed Dec 6, 2016 · Approved
120 Adelaide St W · Minor variance
To facilitate the recladding of the existing office building and a reconfiguration of Open Space on the lot to facilitate new directory signage and new restaurant patio spaces.
230 m away · filed Nov 22, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.