Toronto address · Ward 12, Toronto-St. Paul's
316 Richview Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Recladding front facade, interior alterations to portion of 1st & 2nd floors and partial underpinning
Applied Sep 12, 2007 · issued Sep 12, 2007 · Permit 07 260930 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
4 storeys · 10 homes · Residential
350 m away · Site plan · Under review · filed Apr 13, 2022
Neighbours’ Committee of Adjustment files within 250 m
300 Glenayr Rd · Minor variance
To install a concrete pad and walkway (amenity space) in the front (south) yard, abutting Elderwood Drive. The existing two-storey detached dwelling will be maintained and unaltered.
240 m away · filed Jun 22, 2026 · Approved
38 Ava Rd · Minor variance
To alter the existing three-storey detached dwelling by constructing a one-storey addition with a basement below, at the northwest corner of the dwelling (abutting Rosemary Road).
170 m away · filed May 12, 2026 · Approved
317 Richview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a one-storey addition along a portion of the south side wall, and a rear covered ground floor deck with stairs. Also, to construct a front yard parking pad.
50 m away · filed Apr 10, 2026 · Approved
408 Richview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing rear one and two-storey additions (including a basement level), a side (south) addition at the ground floor and second floor, and a rear ground floor deck with a canopy and stairs. Also, to construct a new one-storey ancillary building (shed) in the rear yard. The existing rear ancillary building (detached garage) and rear ground floor deck will be demolished.
150 m away · filed Mar 3, 2026 · Approved
1689 Bathurst St · Consent
To obtain consent to sever the property into two undersized residential lots, and to create new easements/rights-of-way. Also, existing easements/rights-of-way will be maintained.
80 m away · filed Jan 21, 2026 · Postponed
414 Richview Ave · Minor variance
To construct a new four-storey detached dwelling (basement floor will be considered as first floor) with a two-car integral garage, a front covered porch with stairs, a rear basement walkout, a rear second floor deck with stairs and two rear third floor balconies. The existing ancillary building (wood garage) in the rear yard will be demolished.
180 m away · filed Jun 3, 2025 · Approved
314 Glenayr Rd · Minor variance
To construct a new three-storey detached dwelling with one integral garage (with a car lift from the basement to the ground floor), a new widened driveway, a front ground floor covered porch, a rear ground floor covered deck (outdoor room) and a rear third floor balcony. The existing two-and-one-half-storey detached dwelling will be demolished.
210 m away · filed May 5, 2025 · Approved
1725 Bathurst St · Minor variance
To alter the existing three-storey detached building by constructing a complete three-storey addition. The sixth storey will contain indoor amenity space, access to the outdoor terrace, and the mechanical penthouse. There will be a total of 10 residential dwelling units within this apartment building. Also, the existing rear 7 surface parking spaces will be maintained and unaltered.
210 m away · filed Jan 24, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.