Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

317 Mortimer Ave

The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for a second storey addition, interior alterations of existing ground floor and rear deck.

    Applied Nov 22, 2019 · issued Jan 14, 2020 · Permit 19 252737 PLB

    Work not started
  • Small residential project · Multiple projects

    Proposal for a second storey addition, interior alterations of existing ground floor and rear deck.

    Applied Nov 22, 2019 · issued Jan 14, 2020 · Permit 19 252737 BLD

    Work not started
  • Small residential project · Interior alterations

    Proposal for interior alterations to the basement

    Applied Jan 21, 2019 · issued Feb 19, 2019 · Permit 19 106622 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey detached house by constructing a second storey addition and a new rear ground floor deck.

    Decision: Approved (hearing Sep 11, 2019)

    Filed Jun 5, 2019 · File A0592/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 270 Floyd Ave · Consent

    To obtain consent to sever the merged property into three residential lots.

    220 m away · filed Dec 10, 2024 · Approved

  • 190 Donlands Ave · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    130 m away · filed May 14, 2024 · Application withdrawn

  • 169 Woodycrest Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front porch, which will be enclosed and to reconstruct the front stairs.

    240 m away · filed Sep 7, 2023 · Approved

  • 188 Donlands Ave · Consent

    To obtain consent to sever the property into two residential lots and to maintain an existing easement/right-of-way.

    130 m away · filed Aug 21, 2023 · Approved

  • 188 Donlands Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite with a rear [west] second storey juliette balcony), in the rear yard, abutting the laneway. The existing ancillary building (semi-detached garage) in the rear yard, will be demolished. Also, the existing two-storey detached main dwelling will be maintained and unaltered.

    130 m away · filed Aug 21, 2023 · Approved

  • 190 Donlands Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite with a rear [west] second storey juliette balcony), in the rear yard, abutting the laneway and Kings Park Boulevard. The existing ancillary building (semi-detached garage) in the rear yard, will be demolished. Also, the existing two-storey detached main dwelling will be maintained and unaltered.

    130 m away · filed Aug 21, 2023 · Approved

  • 323 Mortimer Ave · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    30 m away · filed Apr 14, 2023 · Approved

  • 323 Mortimer Ave · Minor variance

    To maintain the existing three-storey semi-detached dwelling.

    30 m away · filed Apr 14, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.