Toronto address · Ward 13, Toronto Centre
318 Queen St E
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Addition or alteration · Other
Proposal to remove fire alarm system in existing multiple unit building.
Applied Feb 2, 2017 · completed Oct 31, 2017 · Permit 17 112294 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
494-526 Richmond Street East and 156-162 Parliament Street
588 homes · Residential
110 m away · Site plan · Under review · filed Jul 12, 2023
- Approved
80-94 Power Street, 351-373 Queen Street East and 161-167 Parliament Street
28 storeys · 526 homes · Mixed use
130 m away · Site plan · Approved · filed Jun 28, 2021
- Under appeal
130-134 Parliament Street and 529 Richmond Street East
46 storeys · 419 homes · Mixed use
160 m away · Site plan · Under appeal · filed Aug 14, 2023
- Under review
35 storeys · 257 homes · Mixed use
200 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
69-75 Ontario Street and 429-455 Richmond Street East
43 storeys · 380 homes · Mixed use
210 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
245-285 Queen Street East, 348-412 Richmond Street East and 2 other streets
25 storeys · 446 homes · Mixed use
240 m away · Site plan · Under review · filed Jun 11, 2021
Neighbours’ Committee of Adjustment files within 250 m
53 Ontario St · Minor variance
To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.
240 m away · filed Aug 5, 2026 · Hearing scheduled
285 Shuter St · Minor variance
110 m away · filed May 22, 2026 · Postponed
57 Ontario St · Minor variance
To alter the existing 25-storey mixed-use building by constructing a partial mezzanine (46.83 m2) above the ground floor unit (Unit 104) for a new dental office.
220 m away · filed Nov 19, 2024 · Approved
261 Queen St E · Minor variance
To alter part of a mixed-use development (Buildings B and C) comprised of two apartment towers (total of 795 residential units), 6,997 m² of retail space, 7,715 m² of office space, and a 1400 m² public park, approved under Site Specific By-laws 226-2023(OLT) and 227-2023(OLT), by converting approximately 7,715 m² of office area within Building C into 64 residential units (of which 21 of the units will be Live-Work units). Also, by permitting and altering the type of personal service shop uses within dwelling units, permitting a home occupation to be located within a dwelling unit in Building…
240 m away · filed Mar 13, 2024 · Approved
358 Queen St E · Minor variance
To convert the second and third levels from residential units into commercial use(s).
120 m away · filed Aug 24, 2023 · Approved
351 Queen St E · Minor variance
To alter the approved mixed-use development by increasing the height of the building that consists of 10, 12, 13 and 27-storeys, as shown on the Revised Diagram 3. Also, to increase both the total and residential gross floor areas, and to reduce the non-residential gross floor area, the number of vehicular parking spaces, and the residential amenity spaces.
110 m away · filed Aug 23, 2023 · Approved
48 Power St · Consent
To obtain consent to sever the property into three lots and to create various easements/rights-of-way.
220 m away · filed Feb 27, 2023 · Approved
54 Power St · Minor variance
To increase the maximum permitted non-residential gross floor area for a single retail or service use within this existing mixed-use building.
210 m away · filed May 24, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.