Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

319 Sammon Ave

The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - underpin and finish basement

    Applied Oct 27, 2015 · issued Nov 17, 2015 · Permit 15 243187 PLB

    Inspections under way
  • Drains and site services

    Drain - underpin and finish basement

    Applied Oct 27, 2015 · issued Nov 17, 2015 · Permit 15 243187 DRN

    Inspections under way
  • Small residential project · Multiple projects

    underpin and finish basement

    Applied Oct 27, 2015 · issued Nov 17, 2015 · Permit 15 243187 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 48 Queensdale Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.

    220 m away · filed May 25, 2026 · Approved

  • 385 Sammon Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).

    230 m away · filed Feb 27, 2026 · Approved

  • 394 Mortimer Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by demolishing the existing rear one-storey addition and constructing a new rear addition (mudroom).

    250 m away · filed Jan 29, 2026 · Approved

  • 26 Wiley Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second-storey addition, and two rear window wells at the basement level. Also, to reconstruct the front ground floor covered porch with stairs (raised in height to accommodate an increase in ground floor and basement height).

    240 m away · filed Jan 26, 2026 · Approved

  • 53 Wiley Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a partial rear one-storey addition with deck, and a rear cantilevered second storey addition.

    190 m away · filed Oct 31, 2025 · Approved

  • 6 Kimbourne Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (the existing rear one-storey will be demolished) with a ground floor deck and stairs. Also, to construct a new one-storey ancillary building (detached shed), in the rear yard of the property. The existing rear ancillary building (semi-detached garage) will be demolished.

    190 m away · filed Sep 23, 2025 · Approved

  • 38 Leroy Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing front and rear one-storey additions on the first level, a front porch with stairs, a rear deck with stairs, and a rear at-grade patio. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.

    220 m away · filed May 28, 2025 · Approved

  • 2 Frankdale Ave · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front covered porch with stairs, a front second and third floor extended roof, and a rear second floor deck with stairs.

    190 m away · filed May 12, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.