Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

32 Arden Cres

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Deck

    Proposal to construct a rear deck

    Applied Sep 26, 2025 · issued Oct 8, 2025 · Permit 25 231100 BLD

    Inspections under way
  • Small residential project · Finishing basements

    Finish basement (new bathroom)

    Applied Apr 14, 2004 · issued Apr 14, 2004 · Permit 04 124594 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 2 Dorine Cres · Minor variance

    To construct an addition to front of the existing dwelling. Previously Deferred from April 2024 Hearing.

    250 m away · filed Jan 12, 2024 · Approved

  • 15 Eastgate Cres · Minor variance

    To demolish existing detached garage and to construct a new two car garage.

    130 m away · filed Aug 25, 2022 · Approved

  • 8 Arden Cres · Minor variance

    To construct a new two-storey rear addition.

    140 m away · filed Sep 2, 2021 · Approved

  • 1 Arden Cres · Minor variance

    To construct a new two-storey detached dwelling with an integral garage.

    200 m away · filed Jun 8, 2021 · Approved

  • 17 Dorine Cres · Minor variance

    To construct a two-storey rear addition, a second storey addition over the existing dwelling and a new attached garage.

    170 m away · filed Feb 19, 2020 · Approved

  • 19 Arden Cres · Minor variance

    The Committee of Adjustment approved several variances in September of 2017 to permit the construction of a new two-storey detached dwelling. The previous application (A0273/17SC) was granted to permit variances for coverage, side yard setback, height, length, front stair width and driveway width. The applicant is seeking relief from the Zoning By-law again as a result of a missed variance for eaves setback under the Zoning By-law 569-2013.

    40 m away · filed Oct 17, 2018 · Approved

  • 19 Arden Cres · Minor variance

    To construct a new two-storey detached dwelling.

    40 m away · filed Jul 25, 2017 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.