Toronto address · Ward 11, University-Rosedale
32 Belmont St
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Construct 2-Storey and Basement Rear Addition, Interior Alterations throughout, new rear deck to an Existing Single Family Dwelling Semi-Detached House, including underpinning the basement. (Existing detached garage access from the existing lane will be remaining).
Applied Jul 3, 2024 · issued Jul 8, 2024 · completed Jun 9, 2025 · Permit 24 119022 HVA
- Closed
Plumbing
Plumbing - 2 storey and basement rear addition, interior alterations throughout, new rear deckBase Addition: 22.7sqm, Base Alt: 46.51sqm, Ground Fl Add: 23.4sqm, Ground Fl Alt: 48.1sqm, Second fl Add: 26.2sqm, Second fl Alt: 47.97sqm, deck: 11.19sqm
Applied Feb 26, 2024 · issued Mar 6, 2024 · completed Jun 3, 2025 · Permit 24 119022 PLB
- Closed
Small residential project · Other
Construct 2-Storey and Basement Rear Addition, Interior Alterations throughout, new rear deck to an Existing Single Family Dwelling Semi-Detached House, including underpinning the basement. (Existing detached garage access from the existing lane will be remaining).
Applied Feb 26, 2024 · issued Mar 6, 2024 · completed Jul 8, 2025 · Permit 24 119022 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
for new drains throughout including sump pump and backwater valve
Applied Feb 26, 2024 · issued Feb 26, 2024 · completed Jul 8, 2025 · Permit 24 119060 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Approved with conditions
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by constructing a two-storey addition (along the west side and north rear walls) with a new rear ground level walkout deck. The existing ancillary building (detached garage) will be maintained and unaltered.
Decision: Approved (hearing Dec 13, 2023)
Filed Oct 20, 2023 · File A0960/23TEY
What’s planned nearby
Development sites within 500 m
- Approved
11 storeys · Not stated in the file
120 m away · Site plan · Approved · filed Feb 13, 2025
- Under review
19 storeys · 43 homes · Mixed use
200 m away · Condominium · Under review · filed Oct 28, 2021
- Approved
25 McMurrich Street and 906 Yonge Street
19 storeys · 401 homes · Mixed use
210 m away · Site plan · Approved · filed Nov 3, 2021
- Approved
12 storeys · 24 homes · Mixed use
260 m away · Site plan · Approved · filed Nov 14, 2024
- Approved
22-32 Scollard Street and 21-25 Davenport Road
61 storeys · 79 homes · Mixed use
340 m away · Rezoning · Approved · filed Dec 31, 2021
- Approved
48-58 Scollard Street and 1315-1325 Bay Street
130 homes · Residential
350 m away · Condominium · Approved · filed Feb 28, 2025
Neighbours’ Committee of Adjustment files within 250 m
6 Gibson Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
210 m away · filed Jul 27, 2026 · Hearing scheduled
131 Davenport Rd · Minor variance
To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).
240 m away · filed Jul 13, 2026 · Hearing scheduled
17 Belmont St · Minor variance
To convert the existing two-storey semi-detached mixed-use building (containing two residential dwelling units and three commercial units) to commercial uses. Also, to alter the building by constructing a rear one-storey vestibule addition to replace the existing attached garage, a front second storey dormer addition, a raised rear second storey balcony to replace the existing balcony, and a side (east) exterior staircase. The altered building will contain three commercial units (one dental clinic occupying the ground and second storeys, and two commercial units within the basement). There wi…
60 m away · filed Jun 17, 2026 · Approved
100 Davenport Rd · Minor variance
To alter the development standards for the approved 19-storey mixed-use building with 46 dwelling units (as approved under Site Specific Zoning By-law 1578-2025 (OLT)), by revising the maximum building heights and permitted height projections (overall building height and number of storeys remain unchanged at 19 storeys, 66 m, plus a 6 m mechanical penthouse), modifying the required minimum building setbacks, and increasing the maximum permitted total gross floor area and residential gross floor area. There will be a total of 46 residential dwelling units on this lot. A related Site Plan Contr…
200 m away · filed Oct 21, 2025 · Approved
8 Gibson Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (including a basement extension below) with a first level deck. A new retaining wall will be constructed in the rear yard.
210 m away · filed Aug 1, 2025 · Approved
68 Belmont St · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.
80 m away · filed Mar 21, 2025 · Approved
113 Davenport Rd · Minor variance
To permit an eating establishment use on this subject lot.
210 m away · filed Jun 9, 2023 · Approved
40 Belmont St · Minor variance
To alter the existing two-storey townhouse by constructing a one-storey side addition, and a rear second storey addition. Also, to construct a new ancillary building (carport), abutting the laneway.
20 m away · filed Mar 25, 2022 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.