Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

32 Old Orchard Grv

The City of Toronto has 5 building permits since 2017 (5 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Demolition

    Proposal to demolish the existing 1.5 storey SFD-detached dwelling.See also 26 105498 BLD for the replacement dwelling.

    Applied Feb 9, 2026 · issued Mar 31, 2026 · 1 home removed · Permit 26 114744 DEM

    Permit issued
  • New house · New building

    Proposal to demolish existing 11/2 storey single family dwelling and construct a new two storey single family dwelling.

    Applied Jan 16, 2026 · issued Mar 31, 2026 · 1 home added · Permit 26 105498 BLD

    Permit issued
  • Drains and site services

    Drain - Proposal to demolish existing 11/2 storey single family dwelling and construct a new two storey single family dwelling.

    Applied Jan 16, 2026 · issued Mar 31, 2026 · Permit 26 105498 DRN

    Permit issued
  • Plumbing

    Plumbing - Proposal to demolish existing 11/2 storey single family dwelling and construct a new two storey single family dwelling.

    Applied Jan 16, 2026 · issued Mar 31, 2026 · Permit 26 105498 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal to demolish existing 11/2 storey single family dwelling and construct a new two storey single family dwelling.

    Applied Jan 16, 2026 · issued Mar 31, 2026 · Permit 26 105498 HVA

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new 3 storey detached dwelling

    Decision: Approved (hearing May 1, 2025)

    Filed Mar 5, 2025 · File A0115/25NY

    Closed
  • Minor variance · New R building

    To construct a new dwelling.

    Decision: Approved (hearing Nov 7, 2019)

    Filed Apr 25, 2019 · File A0291/19NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 17 Brooke Ave · Minor variance

    Proposal to construct a new two-storey detached dwelling with a partially covered rear deck.

    150 m away · filed Jul 17, 2026 · Approved

  • 3 Brooke Ave · Minor variance

    To alter the existing detached dwelling by constructing a new front porch.

    190 m away · filed May 22, 2026 · Approved

  • 71 Yonge Blvd · Minor variance

    To construct one-storey addition (attached garage) to the north side of the existing detached dwelling, as well as a one-storey front entry addition.

    130 m away · filed May 12, 2026 · Approved

  • 32 Yonge Blvd · Minor variance

    To construct a new third storey deck.

    60 m away · filed May 4, 2026 · Deferred

  • 31 McNairn Ave · Minor variance

    To alter the existing detached dwelling by constructing a one-storey rear addition (sunroom) and a new rear deck.

    80 m away · filed Apr 28, 2026 · Approved

  • 46 Brooke Ave · Minor variance

    To construct a new 3-storey detached dwelling with an integral garage, a covered front porch and a covered rear deck.

    250 m away · filed Dec 18, 2025 · Approved

  • 3 Mason Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing additions to the front and north side of the dwelling, a new second storey and a third storey addition.

    240 m away · filed Dec 18, 2025 · Approved

  • 51 Yonge Blvd · Minor variance

    To construct a new 3-storey detached dwelling with an integral garage.

    70 m away · filed Dec 9, 2025 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.