Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

32 Rathnelly Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Install Backwater valve

    Applied Jun 29, 2023 · issued Jul 6, 2023 · completed Jul 7, 2023 · Permit 23 167759 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 14 Dupont St · Minor variance

    To convert the existing two-and-one-half-storey non-residential (commercial) building into a mixed-use building by constructing complete fourth and fifth storey (mechanical penthouse) additions, and a front second storey terrace. Also, to construct a rear three-storey addition (including a basement) with third and fourth storey terraces, and a rear fifth storey rooftop terrace (including a green roof). The existing restaurant will continue to occupy the basement and ground floor levels (including the existing front outdoor patio and a new outdoor patio addition along the east side of the lot)…

    250 m away · filed May 11, 2026 · Approved

  • 23 Poplar Plains Cres · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear two-storey addition (above the existing rear one-storey addition) with juliet balconies at the second and third storeys. The existing rear second storey outdoor terrace will be converted into habitable space. Also, to construct third storey dormers, and a new front porch canopy.

    240 m away · filed Feb 25, 2026 · Approved

  • 12 Mc Master Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a rear third storey addition (one dormer above the two-storey addition), and a rear ground floor deck with stairs (the existing rear ground floor deck will be demolished).

    150 m away · filed Oct 3, 2025 · Approved

  • 247 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    230 m away · filed Oct 1, 2025 · Approved

  • 249 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    220 m away · filed Oct 1, 2025 · Approved

  • 77 Poplar Plains Cres · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing front and rear third storey additions, and a rear second and third storey addition. The existing rear one-storey ancillary building (detached garage) will be maintained and unaltered.

    170 m away · filed May 5, 2025 · Approved

  • 284 Avenue Rd · Minor variance

    To convert the existing three-storey semi-detached mixed-use building (containing one residential dwelling unit and one commercial unit) into a triplex (containing three residential dwelling units) by installing a new basement dwelling unit.

    210 m away · filed Feb 7, 2025 · Approved

  • 39 Poplar Plains Cres · Minor variance

    To construct a new three-storey detached dwelling with a covered front porch and stairs, rear ground floor stairs, and a rear third floor balcony. Also, to construct a one-storey ancillary building (attached garage to the abutting garage at 41 Poplar Plains Crescent) in the rear yard.

    230 m away · filed Jan 20, 2025 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.