Toronto address · Ward 19, Beaches-East York
32 Treadway Blvd
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
REV 02-REVISE LAYOUTHVAC - Proposal to alter the existing one-storey detached dwelling by constructing a second storey addition, a rear ground floor deck, a front basement walkout and widening the existing integral garage in proposed detached single family dwelling.
Applied Nov 24, 2020 · issued Dec 23, 2020 · completed Mar 11, 2021 · Permit 18 223879 HVA (revision 02)
- Closed
Heating and ventilation
Revision 01 - changes to mechanical HVAC - Proposal to alter the existing one-storey detached dwelling by constructing a second storey addition, a rear ground floor deck, a front basement walkout and widening the existing integral garage in proposed detached single family dwelling.
Applied Oct 7, 2020 · issued Nov 13, 2020 · completed Mar 11, 2021 · Permit 18 223879 HVA (revision 01)
- Closed
Small residential project · Multiple projects
Revision #01 - Changes to 2nd floor exterior wall finish, windows and proposed pitch roof instead of a flat roof.Proposal to alter the existing one-storey detached dwelling by constructing a second storey addition, a rear ground floor deck, a front basement walkout and widening the existing integral garage in proposed detached single family dwelling.
Applied May 10, 2019 · issued Jun 11, 2019 · completed Mar 19, 2021 · Permit 18 223879 BLD (revision 01)
- Closed
Drains and site services
Drain - Proposal to alter the existing one-storey detached dwelling by constructing a second storey addition, a rear ground floor deck, a front basement walkout and widening the existing integral garage in proposed detached single family dwelling.
Applied Oct 5, 2018 · issued Oct 5, 2018 · completed Mar 11, 2021 · Permit 18 223879 DRN
- Closed
Plumbing
Plumbing - Proposal to alter the existing one-storey detached dwelling by constructing a second storey addition, a rear ground floor deck, a front basement walkout and widening the existing integral garage in proposed detached single family dwelling.
Applied Sep 11, 2018 · issued Oct 4, 2018 · completed Mar 11, 2021 · Permit 18 223879 PLB
- Closed
Heating and ventilation
HVAC - Proposal to alter the existing one-storey detached dwelling by constructing a second storey addition, a rear ground floor deck, a front basement walkout and widening the existing integral garage in proposed detached single family dwelling.
Applied Sep 11, 2018 · issued Oct 4, 2018 · completed Mar 11, 2021 · Permit 18 223879 HVA
- Closed
Small residential project · Multiple projects
Proposal to alter the existing one-storey detached dwelling by constructing a second storey addition, a rear ground floor deck, a front basement walkout and widening the existing integral garage in proposed detached single family dwelling.
Applied Sep 11, 2018 · issued Oct 4, 2018 · completed Mar 19, 2021 · Permit 18 223879 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
10 Coxwell Blvd · Minor variance
To alter the existing one-storey detached dwelling by constructing a side (north) one-storey addition (including a basement extension), a complete second storey addition (cantilevered at the rear (west) portion of the building), and a rear ground level porch with stairs. Also, to reconstruct the existing front covered porch with stairs.
150 m away · filed Dec 11, 2025 · Approved
7 Taylor Dr · Minor variance
To construct a new three-storey detached dwelling with a front porch with stairs, a front integral garage, a rear ground floor deck with stairs, front and rear second storey balconies, and a front third storey balcony. There will be four residential dwelling units on this lot.
230 m away · filed Feb 19, 2025 · Approved
109 Lankin Blvd · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a new covered front porch, an integral garage with a new driveway, a rear ground floor deck with stairs, and a rear basement walkout. The existing front porch and the detached garage in the rear yard will be demolished.
150 m away · filed Jan 8, 2024 · Approved
15 Machockie Rd · Minor variance
To legalize and to maintain the rear canopied structure that was constructed without an authorized building permit.
220 m away · filed Feb 2, 2023 · Approved
10 Coxwell Blvd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a covered front porch and a covered rear porch. Also, to install an in-ground swimming pool and a one-storey ancillary building (detached shed) in the rear yard.
150 m away · filed Aug 3, 2022 · Application withdrawn
107 Lankin Blvd · Minor variance
To construct a new two-storey detached dwelling with a basement secondary suite and a new one-storey ancillary building (for storage use) in the rear yard of the property.
150 m away · filed Jan 26, 2022 · Approved
21 Machockie Rd · Minor variance
To construct a new two-storey detached dwelling with a front integral garage, a rear ground floor deck, and a front porch.
210 m away · filed Jan 10, 2022 · Approved
21 Treadway Blvd · Minor variance
To alter the existing one-storey detached dwelling by constructing: a second storey addition; a rear covered deck with the second floor cantilevered over the deck; and a new front porch. A new detached ancillary building (detached garage) will be constructed in the rear yard.
80 m away · filed Sep 26, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.