Toronto address · Ward 14, Toronto-Danforth
328 Leslie St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install back water valve
Applied May 19, 2017 · issued May 19, 2017 · completed May 24, 2017 · Permit 17 163032 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
9 Peyton Lane · Minor variance
200 m away · filed Apr 28, 2025 · Application withdrawn
9 Peyton Lane · Minor variance
To construct a new three-storey detached building (fourplex - four residential dwelling units - refer to the basement floor plan whereby one dwelling unit is partially above another dwelling unit). Each residential dwelling unit will have an integral garage, and a rear partially covered second floor balcony. This proposal has been reviewed as a building abutting side lot lines as the lot does not abut a municipal street. Also, the existing two-storey detached building (currently abutting Peyton Lane) will be maintained and unaltered.
200 m away · filed Apr 28, 2025 · Postponed
11 Stanton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition with a rear balcony, and a rear ground floor deck.
180 m away · filed Apr 28, 2025 · Approved
9 Peyton Lane · Consent
200 m away · filed Apr 28, 2025 · Application withdrawn
1 Sawden Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition with a balcony.
200 m away · filed Apr 26, 2025 · Approved
25 Parkfield Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition with rear ground floor stairs. The existing rear ground floor deck and stairs will be demolished.
180 m away · filed Apr 23, 2025 · Approved
18 Sproat Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the front porch into habitable space.
130 m away · filed Mar 17, 2025 · Approved
1152 Gerrard St E · Minor variance
To legalize and maintain the conversion of the existing two-storey detached building into an apartment building with 13 residential dwelling units. There will be a new ground floor steel balcony on the east side, a new ground level balcony on the west side, and a new steel canopy on the south side. The following will be maintained and unaltered: 3 parking spaces (1 of which is for visitor space) fronting Hastings Avenue; 12 long-term bicycle parking spaces along a portion of the north lot line; 2 short-term bicycle parking spaces, the existing decks and patios; and the existing steel trailer.…
200 m away · filed Jan 13, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.