Toronto address · Ward 11, University-Rosedale
33 Beatrice St
The City of Toronto has 8 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Multiple projects
Proposal for underpinning basement, reconfigure basement rooms and install new drains
Applied Nov 7, 2025 · completed Nov 17, 2025 · Permit 25 250784 BLD
- Cancelled
Plumbing
Plumbing - Proposal for underpinning basement, reconfigure basement rooms and install new drains
Applied Nov 7, 2025 · completed Nov 17, 2025 · Permit 25 250784 PLB
- Cancelled
Drains and site services
Drain - Proposal for underpinning basement, reconfigure basement rooms and install new drains
Applied Nov 7, 2025 · completed Nov 17, 2025 · Permit 25 250784 DRN
- Cancelled
Drains and site services
Drain - UNDERPINNING BASEMENT, RECONFIGURE BASEMENT ROOMS AND INSTALL NEW DRAINS
Applied Oct 28, 2025 · completed Oct 31, 2025 · Permit 25 245714 DRN
- Cancelled
Small residential project · Multiple projects
Underpinning basement, reconfigure basement rooms and install new drains
Applied Oct 28, 2025 · completed Oct 31, 2025 · Permit 25 245714 BLD
- Cancelled
Plumbing
Plumbing - UNDERPINNING BASEMENT, RECONFIGURE BASEMENT ROOMS AND INSTALL NEW DRAINS
Applied Oct 28, 2025 · completed Oct 31, 2025 · Permit 25 245714 PLB
- Closed
Small residential project · Other
Admin permit for underpinning party wall in conjunction with 35 Beatrice.
Applied Sep 10, 2012 · issued Sep 11, 2012 · completed Dec 29, 2025 · Permit 12 243442 BLD
- Closed
Small residential project · Porch
Rebuild front porch and interior alterations
Applied Jun 21, 2005 · issued Jun 21, 2005 · completed Apr 28, 2026 · Permit 05 147466 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition along the north side of the existing one-storey addition (including an extension to the basement area and the second storey rooftop deck). Also, to reconstruct the rear basement walkout stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and one unit occupying the first, second, and third storeys).
Decision: Approved (hearing Sep 17, 2025)
Filed Jul 17, 2025 · File A0558/25TEY
What’s planned nearby
Development sites within 500 m
- Under review
10 storeys · 74 homes · Residential
480 m away · Site plan · Under review · filed Apr 1, 2026
Neighbours’ Committee of Adjustment files within 250 m
277 Crawford St · Minor variance
To alter the existing three-storey detached dwelling by replacing the existing rear one-storey addition with a new two-storey addition (including a basement level) with a walkout basement and a ground floor deck. Also, to construct a new rear third storey dormer addition with a deck (above the two-storey addition).
180 m away · filed Apr 24, 2026 · Approved
25 Montrose Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a rear balcony, a rear ground floor deck with stairs, and a rear basement walkout on the south side of the dwelling. Also, to convert the basement into one residential dwelling unit. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third storeys). The existing rear one-storey detached ancillary building (one-car garage) will be maintained and unaltered.
90 m away · filed Apr 2, 2026 · Approved
100 Beatrice St · Consent
180 m away · filed Mar 9, 2026 · Postponed
81 Montrose Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (Mezzanine), a rear first and second floor addition and a rear third floor balcony. The existing ancillary building (garage) in the rear yard will be maintained and unaltered.
160 m away · filed Apr 24, 2025 · Postponed
75 Montrose Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front two-storey addition (at the northwest portion of the dwelling), a rear second storey addition, and a third storey addition with a front balcony (above the second floor). The existing front bay window will be demolished.
140 m away · filed Aug 29, 2024 · Approved
82 Montrose Ave · Minor variance
To alter the existing two-storey semi-detached townhouse dwelling by constructing a complete third storey addition (with a rear balcony), a new rear second storey addition (cantilevered over the first storey), and front balconies on the second and third floors. Also, to reconstruct the one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.
170 m away · filed Jul 2, 2024 · Approved
981 Dundas St W · Minor variance
To legalize and to maintin the the existing two-storey ancillary building (one laneway suite with a second storey terrace) that was constructed beyond building permit and to permit the conversion into a home occupation use (office space). There are two residential dwelling units on this lot (within the main two-and-one-half-storey semi-detached dwelling) which will be maintained and unaltered.
160 m away · filed Jun 20, 2024 · Approved
60 Montrose Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear balcony, and a partial south side second storey addition for access to the third storey.
140 m away · filed Jan 24, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.