Toronto address · Ward 1, Etobicoke North
33 Carlingview Dr
The City of Toronto has 19 building permits since 2017 (15 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to an existing cafeteria within the brewery, mechanical and electrical
Applied Apr 23, 2025 · issued Jun 5, 2025 · Permit 25 148013 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to an existing cafeteria within the brewery, mechanical and electrical
Applied Apr 23, 2025 · issued Apr 24, 2025 · Permit 25 148013 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to an existing cafeteria within the brewery, mechanical and electrical
Applied Apr 23, 2025 · issued May 9, 2025 · Permit 25 148013 PLB
- Closed
Temporary structure · Certified tents
Temporary tent for the use of storage during renovations to the building. From November 24th to December 24, 2021 - Molson Brewery15m x 45m HOECKER RIGID FRAME TENTt (Cert # 14-251055) to be installed anchored with steel stakes
Applied Nov 27, 2021 · issued Jan 4, 2022 · completed Apr 17, 2025 · Permit 21 242406 TPS
- Examiner's notice sent
Plumbing
Revision #01 - Adding sinks, ice machine, and dishwasher.Plumbing - Proposal for interior alterations to office building (East Wing).
Applied Oct 28, 2019 · Permit 18 148048 PLB (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision 01: New feature staircase that was not in the original submission (drawings not bubbled)Proposal for interior alterations to office building (East Wing).
Applied Apr 23, 2019 · issued Sep 12, 2019 · Permit 18 148048 BLD (revision 01)
- Examiner's notice sent
Heating and ventilation
Revision 01: New feature staircase that was not in the original submission (drawings not bubbled)HVAC - Proposal for interior alterations to office building (East Wing).
Applied Apr 23, 2019 · Permit 18 148048 HVA (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to office building (East Wing).
Applied Apr 24, 2018 · issued Sep 25, 2018 · Permit 18 148048 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to office building (East Wing).
Applied Apr 24, 2018 · issued Sep 24, 2018 · Permit 18 148048 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to office building (East Wing).
Applied Apr 24, 2018 · issued Sep 24, 2018 · Permit 18 148048 HVA
- Closed
Addition or alteration · Interior alterations
Work to include alteration of existing washrooms with removal of finishes and installation of new finishes and fixtures.
Applied Dec 14, 2017 · issued Mar 13, 2018 · completed Jun 26, 2026 · Permit 17 275721 BLD
- Inspections under way
Plumbing
Plumbing - Work to include alteration of existing washrooms with removal of finishes and installation of new finishes and fixtures.
Applied Dec 14, 2017 · issued Mar 14, 2018 · Permit 17 275721 PLB
Show 7 more permits
- Closed
Heating and ventilation · Other
Proposal to upgrade perimeter VAV terminals to include heating coils, upgrade existing Air Handling Units on roof to include heating coils, abandoning of existing in floor heating system, replacement of Two(2) RTU's.
Applied Dec 6, 2016 · issued Jan 6, 2017 · completed Aug 5, 2026 · Permit 16 260947 MSA
- Revision issued
Heating and ventilation
Revision 01 - Change rads and mechanical on second floor.(HVAC - Proposed interior alterations within the office space of an existing building for Molson Coors Canada.)
Applied Oct 2, 2012 · issued Nov 8, 2012 · Permit 12 119832 HVA (revision 01)
- Inspections under way
Drains and site services · Site service
Site sevice piping relocation.
Applied Jul 20, 2012 · issued Jul 26, 2012 · Permit 12 215386 STS
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations within the office space of an existing building for Molson Coors Canada.
Applied Feb 9, 2012 · issued Mar 19, 2012 · Permit 12 119832 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations within the office space of an existing building for Molson Coors Canada.
Applied Feb 9, 2012 · issued Apr 12, 2012 · Permit 12 119832 HVA
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations within the office space of an existing building for Molson Coors Canada.
Applied Feb 9, 2012 · issued Apr 12, 2012 · Permit 12 119832 PLB
- Closed
Plumbing · Backflow prevention devices (Water only)
Install 3 backflow prevention devices in: Office Building and Laboratory building and Beer Store.
Applied Dec 20, 2010 · issued Feb 8, 2011 · completed Jul 24, 2025 · Permit 10 317183 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.