Toronto address · Ward 1, Etobicoke North
33 Carlson Crt
The City of Toronto has 22 building permits since 2017 (9 still open) and 6 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Drains and site services · Inside and outside drains
Revision 1: Revised grading/inverts as required to suit property severance.Drain - Install 12 manholes, 105.4 lm sani drain, 758.4 lm of STM sani and siamese connection to Backflow preventerConstruct an 8 storey hotel. The ground level podium will contain lobby and breakfast spaces, 3 meeting rooms, fitness room, sun room, and pool. The tower will contain 196 guest suites. The roofs will contain areas of green roof to meet TGS requirements.
Applied Oct 2, 2025 · issued Oct 6, 2025 · Permit 19 149052 STS (revision 01)
- Inspections under way
Drains and site services
Drain - Proposed 1.5 storey open air parking structure
Applied Jun 4, 2025 · issued Aug 19, 2025 · Permit 25 171050 DRN
- Inspections under way
New building
Proposed 1.5 storey open air parking structure
Applied Jun 4, 2025 · issued Aug 19, 2025 · Permit 25 171050 BLD
- Inspections under way
Plumbing
Plumbing - Proposed 1.5 storey open air parking structure
Applied Jun 4, 2025 · issued Aug 19, 2025 · Permit 25 171050 PLB
- Closed
Designated structure · Sign building permit related
4 Wall Signs on the 8th storey, each on North, South East and West elevations, illuminated and displaying static copy**HYATT PLACE**
Applied May 7, 2025 · issued May 30, 2025 · completed Sep 8, 2025 · Permit 25 156078 DST
- Approved
Alternative solution
Combustible composite metal panel system, designated ALPOLIC/FR, an aluminium composite metal (ACM) panel system installed in limited areas on the exterior face of the building which exceeds 6 storeys, will provide the level of performance required by 3.1.5.5.(1) & (2) of OBC. Related to 19-149052 NB, 29 Carlson Crt.
Applied May 31, 2023 · completed Aug 27, 2023 · Permit 23 153615 ALT
- Closed
Designated structure · Sign building permit related
To erect and display four first party illuminated wall signs, displaying static copy at the uppermost storey on all four elevations and one first party illuminated ground sign, displaying static copy located along the westerly frontage.Wall signs dimensions:Sign 1: 1.26m L x 12.29m W x 0.13m D at a height of 29.66m on west elevation.Sign 2: 0.82m L x 7.89m W x 0.13m D at a height of 30.23m on north elevationSign 3: 0.67m L x 6.51m W x 0.13m D at a height of 29.47m on east elevationSign 4: 0.82m L x 7.89m W x 0.13m D at a height of 30.23m on south elevationGround sign dimensions:2.41m L x 1.07…
Applied Jul 21, 2021 · issued Mar 24, 2022 · completed Jul 13, 2022 · Permit 21 186405 DST
- Closed
Heating and ventilation
REVISION - as per the drawingsHVAC - Proposed interior alterations to renovate the ground floor including new office area, fitness centre, add washroom in pool area, renovate existing restaurant, and install new lighting.
Applied May 4, 2021 · issued Jun 2, 2021 · completed Feb 7, 2022 · Permit 19 205177 HVA (revision 01)
- Closed
Designated structure · Sign building permit related
To erect and display one illuminated overhanging structure sign, measuring 0.76 meters verticalyy by 5.56 meters horizontally at the height of 3.91 meters.****THE CANNERY KITCHEN & SOCIAL****
Applied Oct 6, 2020 · issued Oct 16, 2020 · completed Oct 8, 2021 · Permit 20 203020 DST
- Closed
Plumbing
REVISION#1: ADDED/REVISED PLUMBING AT THE EXISTING BAR FOR NEW EQUIPMENT. ADDED A CONVENIENCE SHOWER HEAD AND DRAIN IN THE POOL. Plumbing - Proposed interior alterations to renovate the ground floor including new office area, fitness centre, add washroom in pool area, renovate existing restaurant, and install new lighting.
Applied Aug 20, 2020 · issued Sep 22, 2020 · completed Jan 29, 2021 · Permit 19 205177 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
REVISION - change universal washroom to barrier free washroomProposed interior alterations to renovate the ground floor including new office area, fitness centre, add washroom in pool area, renovate existing restaurant, and install new lighting.
Applied Mar 6, 2020 · issued Aug 21, 2020 · completed Apr 1, 2021 · Permit 19 205177 BLD (revision 01)
- Cancelled
Addition or alteration · Addition(s)
Proposal to demolish existing portion of Crown Plaza hotel and construct new addition for event centre including public washrooms and meeting rooms.
Applied Jan 9, 2020 · completed Oct 8, 2025 · Permit 20 102856 BLD
Show 10 more permits
- Cancelled
Heating and ventilation
HVAC - Proposal to demolish existing portion of hotel and construct new addition for event centre including public washrooms and meeting rooms.
Applied Jan 9, 2020 · completed Oct 8, 2025 · Permit 20 102856 HVA
- Cancelled
Plumbing
Plumbing - Proposal to demolish existing portion of hotel and construct new addition for event centre including public washrooms and meeting rooms.
Applied Jan 9, 2020 · completed Oct 8, 2025 · Permit 20 102856 PLB
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to renovate the ground floor including new office area, fitness centre, add washroom in pool area, renovate existing restaurant, and install new lighting.
Applied Dec 17, 2019 · issued Jan 17, 2020 · completed Feb 7, 2022 · Permit 19 205177 HVA
- Closed
Plumbing
Plumbing - Proposed interior alterations to renovate the ground floor including new office area, fitness centre, add washroom in pool area, renovate existing restaurant, and install new lighting.
Applied Dec 17, 2019 · issued Jan 17, 2020 · completed Jan 29, 2021 · Permit 19 205177 PLB
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations to renovate the ground floor including new office area, fitness centre, add washroom in pool area, renovate existing restaurant, and install new lighting.
Applied Aug 13, 2019 · issued Oct 23, 2019 · completed Apr 1, 2021 · Permit 19 205177 BLD
- Closed
Addition or alteration · Other
Proposed interior alterations to provide for a new vertical lift to give accessibility to the 11th and 12th floors of the existing hotel.
Applied Jul 17, 2019 · issued Sep 17, 2019 · completed Apr 23, 2021 · Permit 19 190469 BLD
- Inspections under way
New building
New construction of an 8-storey, 196 suite Hyatt Place hotel. The ground level podium will contain lobby & breakfast spaces, 3 meeting rooms, fitness room, sun room, and pool.
Applied May 3, 2019 · issued Dec 13, 2023 · Permit 19 149052 BLD
- Inspections under way
Plumbing
Plumbing - See Plumbing data sheet and new siamese connection to Back Flow Preventer.Construct an 8 storey hotel. The ground level podium will contain lobby and breakfast spaces, 3 meeting rooms, fitness room, sun room, and pool. The tower will contain 196 guest suites. The roofs will contain areas of green roof to meet TGS requirements.
Applied May 3, 2019 · issued Mar 22, 2024 · Permit 19 149052 PLB
- Inspections under way
Heating and ventilation
HVAC - Construct an 8 storey hotel. The ground level podium will contain lobby and breakfast spaces, 3 meeting rooms, fitness room, sun room, and pool. The tower will contain 196 guest suites. The roofs will contain areas of green roof to meet TGS requirements.
Applied May 3, 2019 · issued Mar 26, 2024 · Permit 19 149052 HVA
- Inspections under way
Drains and site services · Inside and outside drains
Drain - Install 12 manholes, 105.4 lm sani drain, 758.4 lm of STM sani and siamese connection to Backflow preventerConstruct an 8 storey hotel. The ground level podium will contain lobby and breakfast spaces, 3 meeting rooms, fitness room, sun room, and pool. The tower will contain 196 guest suites. The roofs will contain areas of green roof to meet TGS requirements.
Applied May 3, 2019 · issued May 13, 2025 · Permit 19 149052 STS
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Postponed
Consent · Sever lot
Revision to original consent application B0003/25EYK To obtain consent to sever the lot into two lots and to create various easements/ right-of-ways.
Filed Jun 17, 2026 · File B0016/26EYK
- Closed
Minor variance · Other
To construct a new 8-storey hotel.
Decision: Approved (hearing Jan 15, 2026)
Filed Jan 3, 2025 · File A0026/25EYK
- Conditional consent
Consent · Sever lot
To obtain consent to sever the lot into two lots and to create various easements/ right-of-ways.
Decision: Approved (hearing Jan 15, 2026)
Filed Jan 3, 2025 · File B0003/25EYK
- Closed
Minor variance · Other
To construct a one-storey rear addition and an above grade parking structure. The existing 12-storey hotel will be maintained.
Decision: Approved (hearing Jan 15, 2026)
Filed Jan 3, 2025 · File A0025/25EYK
- Closed
Minor variance · Other
To permit parking for the existing hotel on a different lot during phased construction of the proposed hotel, addition to the existing hotel, and above grade parking garage and a parking reduction. A Previous Committee of Adjustment application (A0243/19EYK) approved variances for the existing Crowne Plaza Hotel and new Hyatt Hotel relating to side yard setbacks, parking and loading spaces, and soft landscaping. An additional Committee of Adjustment application (A181/16EYK) approved a variance permitting a car rental in conjunction with a hotel use.
Decision: Approved (hearing Jun 9, 2022)
Filed Apr 9, 2021 · File A0191/21EYK
- Closed
Minor variance · Other
To construct a one-storey front addition on the existing Crowne Plaza Hotel, a three-storey above grade parking lot and a new eight-storey hotel(Hyatt Hotel).
Decision: Approved (hearing Jul 4, 2019)
Filed Apr 29, 2019 · File A0243/19EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.