Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

33 Dalton Rd

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Hvac - 1-interior reno to convert to 2 dwelling units, 2-plumbing-add 20 fixtures

    Applied Dec 4, 2017 · issued Dec 13, 2017 · completed Jun 25, 2019 · Permit 17 125181 HVA

    Closed
  • Plumbing

    Plumbing - 1-INTERIOR RENO TO CONVERT TO 2 DWELLING UNITS, 2-PLUMBING-ADD 20 FIXTURES

    Applied Mar 6, 2017 · issued Mar 13, 2017 · completed May 16, 2018 · Permit 17 125181 PLB

    Closed
  • Small residential project · Second suite (New)

    1-interior reno to convert to 2 dwelling units, 2-plumbing-add 20 fixtures

    Applied Mar 6, 2017 · issued Mar 13, 2017 · completed Jul 25, 2019 · 1 home added · Permit 17 125181 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 54 Howland Ave · Consent

    To obtain consent for the technical severance of the property to re-establish two residential lots which merged on title, and to create new easements/rights-of-way. Also, to maintain existing easements/rights-of-way.

    210 m away · filed Dec 19, 2025 · Approved

  • 386 Brunswick Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a one-storey front addition (enclosing the front porch) with stairs, a rear basement addition with a walkout, rear one and two-storey additions with second and third storey balconies, and a rear third storey dormer addition. Also, to reconstruct the front (northeast) turret.

    200 m away · filed Nov 21, 2025 · Approved

  • 386 Brunswick Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear basement walkout, a rear two-storey addition with rear decks on the first and second levels, and a third storey addition (north side dormer extension) with a rear deck. The existing rear one-storey ancillary building (detached garage) will be maintained and unaltered.

    200 m away · filed Mar 24, 2025 · Approved

  • 325 Brunswick Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a third storey dormer, and to convert from two residential dwelling units into three residential dwelling units. Also, to construct a rear exterior staircase to acess the second and third levels, as well as an additional staircase to acess ground level.

    90 m away · filed Feb 28, 2025 · Withdrawn

  • 273 Major St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a side (south) ground floor addition.

    250 m away · filed Dec 11, 2023 · Approved

  • 475 Bloor St W · Minor variance

    To alter the existing two-storey mixed-use building by constructing a two-storey rear addition, and a complete third storey addition.

    190 m away · filed Mar 9, 2022 · Approved

  • 68 Howland Ave · Minor variance

    To alter the existing 2½-storey semi-detached dwelling by constructing a one-storey rear addition and ground floor rear deck.

    240 m away · filed Mar 18, 2021 · Approved

  • 68 Howland Ave · Minor variance

    To alter the existing 2½-storey semi-detached house by constructing a rear one storey addition with a rear deck.

    240 m away · filed Sep 1, 2020 · Refused

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.