Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

33 Fernwood Park Ave

The City of Toronto has 5 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Proposal to demolish existing detached house with two dwelling units and construct a pair of Semi-Detached on one lot.

    Applied Dec 22, 2020 · issued Mar 4, 2021 · 2 homes added · Permit 20 233178 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new two unit semi detached dwelling on one lot with an integral garage.

    Applied Dec 22, 2020 · issued Mar 4, 2021 · completed May 26, 2022 · Permit 20 233178 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new two unit semi detached dwelling on one lot with an integral garage.

    Applied Dec 22, 2020 · issued Mar 4, 2021 · completed May 26, 2022 · Permit 20 233178 PLB

    Closed
  • Demolition

    Proposal to demolish the existing dwelling to construct a new pair of Semi-Detached House on one lot

    Applied Dec 22, 2020 · issued Mar 4, 2021 · completed May 26, 2022 · 1 home removed · Permit 20 233180 DEM

    Closed
  • Drains and site services

    Drain - Proposal to construct a new two unit semi detached dwelling on one lot with an integral garage.

    Applied Dec 22, 2020 · issued Mar 4, 2021 · completed May 26, 2022 · Permit 20 233178 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct two new three-storey semi-detached dwellings on one lot.

    Decision: Refused (hearing Mar 28, 2018)

    Filed Sep 27, 2017 · File A1046/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Selwood Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.

    240 m away · filed Sep 1, 2026 · Postponed

  • 26 Hazel Ave · Consent

    To obtain consent to create a new easement/right-of-way.

    110 m away · filed Feb 19, 2026 · Approved

  • 52 Balsam Ave · Consent

    To obtain consent to sever the property into two residential lots.

    200 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    200 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    200 m away · filed Feb 3, 2026 · Postponed

  • 34 Balsam Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.

    120 m away · filed Aug 25, 2025 · Approved

  • 29 Maclean Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).

    180 m away · filed Jul 30, 2025 · Approved

  • 34 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing an integral garage, a partial third storey addition, a rear basement walkout, and a rear first level deck. The front porch will be reconstructed with a canopy and stairs. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    40 m away · filed Jul 28, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.