The City of Toronto has 11 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - To construct a new building attached to existing paper machine building for operations meeting room, building 30'7x12.9, consists of poured foundation, steel fram structure with steel cladding, steel deck - membrane roof with HVAC, and fire proptection sprinkler system

    Applied May 8, 2023 · issued Jul 25, 2023 · completed Feb 2, 2024 · Permit 23 142976 HVA

    Closed
  • Addition or alteration · Addition(s)

    To construct a new building attached to existing paper machine building for operations meeting room, building 30'7x12.9, consists of poured foundation, steel fram structure with steel cladding, steel deck - membrane roof with HVAC, and fire proptection sprinkler system

    Applied May 8, 2023 · issued Jul 25, 2023 · completed Feb 2, 2024 · Permit 23 142976 BLD

    Closed
  • Designated structure · Exterior tank & support

    Proposed concrete base to hold tank and extension to house the scrubber.

    Applied Oct 17, 2016 · completed Aug 13, 2024 · Permit 16 238204 DST

    Cancelled
  • Plumbing · Manholes/Catch Basins/Sumps/Interceptors

    Disconnect storm water from sanitary, directing water to an outlet to creek and installing a passive water filtration device

    Applied Aug 4, 2016 · completed Mar 28, 2025 · Permit 16 201535 PSA

    Cancelled
  • Fire and security upgrade · Other

    Fire alarm upgrade; modify existing fire alarm panel nomenclature

    Applied Jul 19, 2011 · issued Aug 10, 2011 · Permit 11 240866 FSU

    Permit issued
  • Plumbing

    Plumbing - construct addition to bldg 'E', truck bay addition to "S", add 5 free-standing tanks and 3 roof top tanks - Addition(s) Buildin 'E' - containing elecrical switch gears and duct banks.

    Applied Dec 28, 2005 · issued Oct 10, 2006 · Permit 05 212246 PLB

    Inspections under way
  • Addition or alteration · Addition(s)

    construct addition to bldg 'E', truck bay addition to "S", add 5 free-standing tanks and 3 roof top tanks

    Applied Dec 28, 2005 · issued Oct 10, 2006 · Permit 05 212246 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - construct addition to bldg 'E', truck bay addition to "S", add 5 free-standing tanks and 3 roof top tanks - Addition(s) Building 'E' - containing elecrtical switch gears and duct banks.

    Applied Dec 28, 2005 · issued Oct 10, 2006 · Permit 05 212246 HVA

    Inspections under way
  • Addition or alteration · Addition(s)

    Reinforced concrete and steel framed addition - bldg. I

    Applied Jul 29, 2005 · issued Apr 19, 2006 · completed Jun 15, 2021 · Permit 05 166099 BLD

    Closed
  • Non-residential building permit · Partial permit - foundation

    Partial foundation

    Applied Oct 7, 2003 · issued Dec 18, 2003 · completed Apr 27, 2020 · Permit 03 183726 PRT

    Closed
  • Non-residential building permit · New building

    Construct a new 1 storey building for the purpose of warehousing and paper manufacturing - bldg n

    Applied Aug 1, 2003 · issued Jan 19, 2005 · completed Apr 23, 2020 · Permit 03 162873 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 1600 Brimley Road

    42 storeys · Mixed use

    270 m away · Rezoning · Under review · filed Jun 30, 2025

    Under review
  • 1560 Brimley Road and 1350 Ellesmere Road

    15 storeys · 250 homes · Residential

    470 m away · Condominium · Approved · filed Jan 25, 2024

    Approved
  • 100 Borough Drive

    50 storeys · Non-residential

    470 m away · Subdivision · Under review · filed Nov 27, 2025

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 1680 Brimley Rd · Consent

    To server the property into two lots. Cross Reference Rezoning Application File No. 06 200146 ESC 37 OZ, Site Plan Control File No. 06 200147 ESC 37 SA, and Draft Plan of Condominium Application File No. 21233420ESC21CD. This application was previously deferred at the August 2024 hearing.

    230 m away · filed Jun 24, 2024 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.