Toronto address · Ward 12, Toronto-St. Paul's
339 Howland Ave
The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Party Wall Administrative Permit to work on neighbouring 337 Howland AveUnderpinning of party wall: 13 m
Applied Aug 4, 2023 · issued Aug 15, 2023 · completed Oct 26, 2023 · Permit 23 184651 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed Back Water Valve (Sewer only) with no sump pump
Applied Jul 27, 2020 · issued Jul 28, 2020 · completed Jul 30, 2020 · Permit 20 172875 DRN
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to portions of all floors
Applied Sep 16, 2008 · issued Sep 25, 2008 · Permit 08 203071 HVA
- Inspections under way
Plumbing
Plumbing - Interior alterations to portions of all floors
Applied Sep 12, 2008 · issued Sep 19, 2008 · Permit 08 203071 PLB
- Inspections under way
Small residential project · Interior alterations
Interior alterations to portions of all floors
Applied Sep 12, 2008 · issued Sep 19, 2008 · Permit 08 203071 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
16 storeys · 257 homes · Mixed use
210 m away · Site plan · Under review · filed Oct 31, 2021
- Under review
8 storeys · 134 homes · Residential
240 m away · Site plan · Under review · filed Apr 25, 2022
- Under review
8 storeys · 135 homes · Residential
240 m away · Site plan · Under review · filed Apr 25, 2022
- Approved
13 storeys · 115 homes · Residential
310 m away · Condominium · Approved · filed Oct 28, 2024
Neighbours’ Committee of Adjustment files within 250 m
574 Davenport Rd · Minor variance
To construct a new three-storey apartment building with front and rear balconies (located on the second and third storeys), front and rear basement walkouts, front and rear porches, exterior stairs (at the northwest, northeast, and southeast corners of the building), and a raised planter with concrete wall at the southwest corner. There will be a total of 12 residential dwelling units on this corner lot.
220 m away · filed Jun 12, 2026 · Approved
1130 Bathurst St · Minor variance
To construct a staff parking lot within the hydro corridor, located south of the TTC Hillcrest Complex, by reducing the accessible parking spaces, and driving aisle widths.
230 m away · filed Mar 13, 2026 · Postponed
343 Albany Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a rear third floor deck on the roof of the second storey below, and a two-storey rear addition (at the southeast portion of the dwelling).
110 m away · filed Jun 1, 2024 · Approved
14 Lyndhurst Crt · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear ground level patio, a rear basement walkout with stairs, and a third floor rear walkout terrace. The existing front driveway, and rear yard deck will be maintained and unaltered.
220 m away · filed Mar 1, 2024 · Approved
624 Davenport Rd · Minor variance
To permit a front yard parking pad with a front walkway.
160 m away · filed May 16, 2022 · Approved
622 Davenport Rd · Minor variance
To construct one secondary suite within the basement with a front basement walkout.
160 m away · filed Apr 21, 2022 · Approved
618 Davenport Rd · Minor variance
To alter the existing semi-detached dwelling by constructing a rear uncovered deck.
160 m away · filed Mar 2, 2022 · Approved
12 Austin Cres · Minor variance
To alter the existing 2½-storey detached dwelling by constructing a new 1½-storey attached garage on the west side of the dwelling.
240 m away · filed Dec 28, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.