Toronto address · Ward 11, University-Rosedale
34 Henderson Ave
The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposal for interior renovations.
Applied Oct 15, 2025 · issued Oct 20, 2025 · Permit 25 239862 PLB
- Inspections under way
Small residential project · Interior alterations
Proposal for interior renovations.
Applied Oct 15, 2025 · issued Oct 20, 2025 · Permit 25 239862 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior renovations.
Applied Oct 15, 2025 · issued Oct 22, 2025 · Permit 25 239862 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Consent · Other
To obtain consent for the technical severance of the property for the purpose of re-establishing two lots which merged on title.
Decision: Approved (hearing Jan 11, 2023)
Filed Sep 9, 2022 · File B0067/22TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
37 Henderson Ave · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear first storey juliet balconies, as well as, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
30 m away · filed Jul 28, 2026 · Hearing scheduled
644 College St · Minor variance
To convert the existing three-storey mixed-use building into a commercial building by converting the existing third floor residential dwelling unit into commercial use (office space). There will be no residential dwelling units on this lot.
180 m away · filed Apr 8, 2026 · Approved
646 College St · Minor variance
To convert the existing three-storey mixed-use building into a commercial building by converting the existing second floor storage space and third floor residential dwelling unit into commercial use (office spaces). There will be no residential dwelling units on this lot.
180 m away · filed Apr 8, 2026 · Approved
100 Beatrice St · Consent
210 m away · filed Mar 9, 2026 · Postponed
375 Manning Ave · Minor variance
To construct a new three-storey semi-detached dwelling (fourplex) with a covered front porch with stairs, a front basement walkout, and a rear deck with stairs. This dwelling is currently under construction ( as approved under Building Permit No. 24 166489 BLD 00 NH). There will be five residential dwelling units on this lot (four units occupying the main dwelling and one unit occupying the ancillary building).
250 m away · filed Sep 5, 2025 · Approved
356 Euclid Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition (including the basement level), a front second floor canopy, a south side window well with stairs, a rear ground floor deck with stairs and a rear third floor rooftop deck with privacy screen. The existing rear one-storey ancillary building (garage) will be maintained and unaltered.
250 m away · filed Sep 3, 2025 · Approved
647 College St · Minor variance
To convert the existing three-storey mixed-use building into a residential apartment building, and to construct a rear ground floor patio. There will be a total of six residential dwelling units on this lot (one unit within the basement, one unit on the ground level, two units on the second level, and two units on the third level). Also, four long-term bicycle parking spaces will be provided.
150 m away · filed Mar 3, 2025 · Approved
376 Manning Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition with a rear rooftop deck (above a portion of the rear second level). The existing rear detached garage will be maintained and unaltered.
230 m away · filed May 21, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.