Toronto address · Ward 11, University-Rosedale
34 Sussex Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Permit for interior alterations to existing sfd 2 unit dwelling - Interior alterations on all floors - Please note application to be reviewed with 32 Sussex, Building permit 12 180876 BLD.
Applied Jun 12, 2012 · issued Oct 1, 2012 · Permit 12 191199 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
300 Bloor Street West and 478 Huron Street
34 storeys · 339 homes · Residential
250 m away · Condominium · Approved · filed Mar 17, 2026
- Under review
37 storeys · 366 homes · Mixed use
260 m away · Site plan · Under review · filed Dec 7, 2021
- Under review
30 storeys · 472 homes · Mixed use
310 m away · Site plan · Under review · filed Oct 12, 2022
- Under review
334-350 Bloor Street West and 2-6 Spadina Road
36 storeys · 431 homes · Mixed use
310 m away · Site plan · Under review · filed Apr 27, 2022
- Under appeal
28 storeys · 398 homes · Mixed use
450 m away · Site plan · Under appeal · filed May 17, 2021
Neighbours’ Committee of Adjustment files within 250 m
356 Huron St · Minor variance
To convert the existing two-storey detached main dwelling into a mixed-use building through interior alterations to permit a restaurant (café) use within the ground floor of the building. Also, to construct a new two-storey detached ancillary building (containing one laneway suite with bedrooms within the basement below) in the rear yard, abutting the Public laneway. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the laneway suite).
150 m away · filed Oct 23, 2025 · Approved
648 Spadina Ave · Minor variance
To alter the existing two-storey commercial building by increasing the permitted non-residential gross floor area for the restaurant use (through interior alterations).
240 m away · filed Sep 15, 2024 · Approved
161 Robert St · Minor variance
To alter the existing two-and-one-half-storey semi-detached building by constructing rear partial first storey extensions, a rear second storey addition with terrace, and a rear third-storey addition with terrace.
250 m away · filed Nov 13, 2023 · Application withdrawn
2 Sussex Ave · Minor variance
To alter the existing building (Innis College) by constructing a four-storey addition at the northwest portion of the subject site.
170 m away · filed Apr 24, 2023 · Approved
341 Bloor St W · Minor variance
To alter the existing underground parking facility to add four new accessible parking spaces, and new accessibility improvements into the basement elevator lobby entrance.
220 m away · filed Jan 26, 2022 · Approved
320 Bloor St W · Consent
To obtain consent to create an overhang easement/right-of-way in favour of 316 Bloor Street W.
240 m away · filed Dec 3, 2021 · Approved
171 Robert St · Minor variance
To alter the existing 2-½ storey semi-detached dwelling by constructing a rear two-storey addition, a basement addition with a rear walk out, and a rear deck.
240 m away · filed Aug 24, 2020 · Approved
407 Huron St · Minor variance
To permit an office use that is not associated with or accessory to the community health centre or educational clinic permitted by Site-specific By-law 1246-2016.
170 m away · filed Jun 17, 2019 · Withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.