Toronto address · Ward 19, Beaches-East York
34 Woodmount Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Interior alterations
Remove walls on the main floor and sister joists
Applied May 16, 2022 · issued May 25, 2022 · completed Dec 16, 2022 · Permit 22 147223 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a backwater valve on the sanitary line in an existing SFD-semi dwelling.
Applied Nov 26, 2018 · issued Nov 27, 2018 · completed Nov 30, 2018 · Permit 18 261095 DRN
- Closed
Heating and ventilation
HVAC - Lowering basement slab and finishing basement (57m2)
Applied Jun 27, 2018 · issued Jul 5, 2018 · completed Aug 20, 2018 · Permit 18 162610 HVA
- Closed
Plumbing
Plumbing - Lowering basment slab and finishing basement (57m2)
Applied May 22, 2018 · issued Jun 7, 2018 · completed Aug 20, 2018 · Permit 18 162610 PLB
- Closed
Small residential project · Finishing basements
Lowering basement slab and finishing basement (57m2)
Applied May 22, 2018 · issued Jun 7, 2018 · completed Aug 20, 2018 · Permit 18 162610 BLD
- Closed
Drains and site services
Drain - Lowering basment slab and finishing basement (57m2)
Applied May 22, 2018 · issued Jun 7, 2018 · completed Aug 20, 2018 · Permit 18 162610 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
2078-2106 Danforth Avenue and 985 Woodbine Avenue
35 storeys · 601 homes · Mixed use
290 m away · Site plan · Under review · filed Dec 18, 2024
- Under review
10 storeys · 60 homes · Mixed use
310 m away · Site plan · Under review · filed Dec 9, 2024
Neighbours’ Committee of Adjustment files within 250 m
996 Woodbine Ave · Minor variance
To construct a new four-storey detached building (Municipal shelter). There will be one surface parking space in the rear yard, abutting Strathmore Boulevard.
210 m away · filed Jan 21, 2025 · Approved
564 Glebeholme Blvd · Minor variance
To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor deck and stairs.
170 m away · filed Jan 14, 2025 · Approved
996 Woodbine Ave · Minor variance
To construct a new four-storey, multi-unit, detached building (to contain a municipal shelter). There will be one parking pad space abutting Strathmore Boulevard.
210 m away · filed Aug 21, 2024 · Approved
313 Wolverleigh Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front porch (which will be enclosed) and to reconstruct the front stairs.
100 m away · filed Aug 9, 2023 · Approved
2048 Danforth Ave · Minor variance
To alter the existing two-storey mixed-use building by constructing a new partial third storey addition with a third storey deck.
180 m away · filed Dec 10, 2021 · Approved
526 Strathmore Blvd · Consent
To obtain consent for a technical severance to re-establish two residential lots which merged on title.
80 m away · filed Nov 8, 2021 · Approved
100 Woodmount Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a first storey rear deck and to reconstruct the detached garage in the rear of the lot.
240 m away · filed Jun 24, 2021 · Approved
1997 Danforth Ave · Minor variance
To alter the existing two-storey mixed-use building by constructing a one-storey addition above the existing building and a rear three-storey addition to create three additional residential units. The building will contain a total of four residential units and one commercial unit on the ground floor.
170 m away · filed Dec 7, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.