Toronto address · Ward 12, Toronto-St. Paul's
342 Howland Ave
The City of Toronto has 2 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Unperpin the existing basement
Applied Dec 21, 2016 · issued Jan 6, 2017 · Permit 16 269472 BLD
- Cancelled
Plumbing
Plumbing - Unperpin the existing basement
Applied Dec 21, 2016 · completed Jan 4, 2017 · Permit 16 269472 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Consent · Other
Decision: Withdrawn
Filed May 29, 2017 · File B0057/17TEY
What’s planned nearby
Development sites within 500 m
- Under review
16 storeys · 257 homes · Mixed use
240 m away · Site plan · Under review · filed Oct 31, 2021
- Approved
- Under review
8 storeys · 134 homes · Residential
270 m away · Site plan · Under review · filed Apr 25, 2022
- Under review
8 storeys · 135 homes · Residential
280 m away · Site plan · Under review · filed Apr 25, 2022
- Approved
13 storeys · 115 homes · Residential
350 m away · Condominium · Approved · filed Oct 28, 2024
Neighbours’ Committee of Adjustment files within 250 m
574 Davenport Rd · Minor variance
To construct a new three-storey apartment building with front and rear balconies (located on the second and third storeys), front and rear basement walkouts, front and rear porches, exterior stairs (at the northwest, northeast, and southeast corners of the building), and a raised planter with concrete wall at the southwest corner. There will be a total of 12 residential dwelling units on this corner lot.
250 m away · filed Jun 12, 2026 · Approved
1130 Bathurst St · Minor variance
To construct a staff parking lot within the hydro corridor, located south of the TTC Hillcrest Complex, by reducing the accessible parking spaces, and driving aisle widths.
190 m away · filed Mar 13, 2026 · Postponed
343 Albany Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a rear third floor deck on the roof of the second storey below, and a two-storey rear addition (at the southeast portion of the dwelling).
60 m away · filed Jun 1, 2024 · Approved
14 Lyndhurst Crt · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear ground level patio, a rear basement walkout with stairs, and a third floor rear walkout terrace. The existing front driveway, and rear yard deck will be maintained and unaltered.
230 m away · filed Mar 1, 2024 · Approved
624 Davenport Rd · Minor variance
To permit a front yard parking pad with a front walkway.
160 m away · filed May 16, 2022 · Approved
622 Davenport Rd · Minor variance
To construct one secondary suite within the basement with a front basement walkout.
160 m away · filed Apr 21, 2022 · Approved
618 Davenport Rd · Minor variance
To alter the existing semi-detached dwelling by constructing a rear uncovered deck.
160 m away · filed Mar 2, 2022 · Approved
12 Austin Cres · Minor variance
To alter the existing 2½-storey detached dwelling by constructing a new 1½-storey attached garage on the west side of the dwelling.
220 m away · filed Dec 28, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.