Toronto address · Ward 13, Toronto Centre
342 Wellesley St E
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Party wall admin permits
Administrative Party-wall permit for work at 340 Wellesley Street East.See also 24-155178 BLD 00 SR
Applied May 28, 2024 · issued Jun 6, 2024 · Permit 24 155311 BLD
- Closed
Small residential project · Other
New 3 storey rear addition and complete 3rd storey addition.340 Wellesley St E submitting for permit for similar work June 19/09.Administrative permit created for 344 Wellesley St E
Applied Jun 19, 2009 · issued Aug 25, 2009 · completed Dec 21, 2021 · Permit 09 152205 BLD
- Closed
Small residential project · Interior alterations
Interior alterations to the basement , ground and second floor for structural members. Note OTC on proberty for this work without permit.
Applied Feb 22, 2005 · issued Feb 22, 2005 · completed Dec 21, 2021 · Permit 05 110387 BLD
- Closed
Residential building permit · Alteration to existing building
Make interior alterations to existing grounfd floor framing in order to reinforce it.
Applied Jan 2, 2001 · issued Jan 2, 2001 · completed Dec 21, 2021 · Permit 01 100078 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
350 m away · Site plan · Under review · filed Apr 27, 2022
- Under appeal
10 storeys · 60 homes · Mixed use
440 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Approved
41 storeys · 460 homes · Mixed use
490 m away · Rezoning · Approved · filed Aug 25, 2025
Neighbours’ Committee of Adjustment files within 250 m
32 Salisbury Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).
210 m away · filed Jun 11, 2025 · Approved
603 1/2 Parliament St · Minor variance
To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.
160 m away · filed Jul 18, 2024 · Approved
51 Metcalfe St · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new front porch (to replace the existing front porch).
250 m away · filed Dec 6, 2023 · Approved
116 Amelia St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.
220 m away · filed Jan 30, 2023 · Approved
340 Wellesley St E · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a two-storey rear addition, a rear ground floor deck, a rear stepped window well, and a front basement walkout.
10 m away · filed Nov 21, 2022 · Approved
92 Amelia St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a rear third storey roof deck, a new rear ground floor addition (to replace the existing addition), and a rear second storey roof deck. This dwelling will have a total of two residential units.
170 m away · filed Oct 25, 2022 · Approved
35 Amelia St · Minor variance
To construct a two-storey ancillary building (laneway suite) in the rear yard of the property, abutting the laneway (Prohibition Lane).
150 m away · filed Aug 28, 2022 · Approved
499 Sackville St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition, as approved by Minor Variance Application A0370/22TEY. The current application is necessitated to identify a depth variance to the altered dwelling (as cited in the variance below).
110 m away · filed Aug 25, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.