Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

345 Sunnyside Ave

The City of Toronto has 9 building permits since 2017 (9 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Revision 02: BASEMENT INTERIOR ALTERATIONS, FIRST AND SECOND FLOOR INTERIOR ALTERATIONS (20m2) REAR FIRST FLOOR DECK ALTERATIONS AND REAR DECK ROOFRevision 1: Extend the basement with underpinning (l=6.8m) the newly poured footings and foundations for the rear addition.Proposal for two storey rear addition

    Applied Aug 19, 2026 · issued Sep 10, 2026 · Permit 25 202815 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for two storey rear addition

    Applied Jul 21, 2026 · issued Sep 8, 2026 · Permit 25 202815 HVA

    Permit issued
  • Plumbing

    Revision 1: Extend the basement with underpinning (l=6.8m) the newly poured footings and foundations for the rear addition.Plumbing - Proposal for two storey rear addition

    Applied Nov 28, 2025 · issued Dec 12, 2025 · Permit 25 202815 PLB (revision 01)

    Revision issued
  • Small residential project · Addition(s)

    Revision 1: Extend the basement with underpinning (l=6.8m) the newly poured footings and foundations for the rear addition.Proposal for two storey rear addition

    Applied Nov 28, 2025 · issued Dec 16, 2025 · Permit 25 202815 BLD (revision 01)

    Revision issued
  • Small residential project · Addition(s)

    Proposal for two storey rear addition

    Applied Jul 30, 2025 · issued Nov 27, 2025 · Permit 25 202815 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for two storey rear addition

    Applied Jul 30, 2025 · issued Nov 27, 2025 · Permit 25 202815 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposed basement underpinning, interior alterations and drain work.

    Applied Jul 8, 2025 · issued Jul 25, 2025 · Permit 25 190171 DRN

    Permit issued
  • Plumbing

    Plumbing - Proposed basement underpinning, interior alterations and drain work.

    Applied Jul 8, 2025 · issued Jul 25, 2025 · Permit 25 190171 PLB

    Permit issued
  • Small residential project · Multiple projects

    Proposed basement underpinning, interior alterations and drain work.

    Applied Jul 8, 2025 · issued Jul 25, 2025 · Permit 25 190171 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition (with a flat roof), and a rear ground floor deck with stairs. The existing one-storey ancillary building (garage), in the rear yard, will be maintained and unaltered.

    Decision: Approved (hearing Oct 22, 2025)

    Filed Aug 29, 2025 · File A0671/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 6 Howard Park Avenue

    11 storeys · 130 homes · Mixed use

    450 m away · Condominium · Under review · filed Nov 8, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 15 Constance St · Minor variance

    110 m away · filed Sep 24, 2026 · Accepted

  • 374 Sunnyside Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a north side third storey dormer addition, a new enclosed front porch with a canopy and stairs, and a rear covered porch with stairs.

    160 m away · filed Aug 5, 2026 · Tentatively scheduled

  • 350 Sunnyside Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition with a new rear roof deck above. The existing partial one-storey ground floor addition with roof deck above will be demolished.

    60 m away · filed Nov 26, 2025 · Approved

  • 294 Roncesvalles Ave · Minor variance

    To permit a wellness centre (located in the basement and ground floor) in the existing two-and-one-half-storey mixed-use building that contains two dwelling units (located on the second and third floor).

    170 m away · filed Jan 19, 2024 · Approved

  • 147 Westminster Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third storey addition, a rear two-storey addition, rear roof decks on the second and third floors, and a rear ground level deck. The existing detached garage at the rear will remain unaltered.

    250 m away · filed Dec 11, 2023 · Approved

  • 141 Geoffrey St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with a rear ground floor patio and stairs. Also, to construct a one-storey ancillary building (detached garage with a west side deck and stairs) in the rear yard.

    180 m away · filed Jul 24, 2023 · Approved

  • 155 Grenadier Rd · Minor variance

    To construct a new one-storey detached ancillary building (garage), in the rear yard, abutting the laneway.

    70 m away · filed Apr 19, 2023 · Approved

  • 294 Roncesvalles Ave · Minor variance

    To convert a portion of the existing two-and-one-half-storey detached dwelling from a ground floor and basement florist use to a ground floor eating establishment (café/restaurant) with basement food storage areas. The existing two residential units on the second and third levels will be maintained and unaltered.

    170 m away · filed Mar 22, 2023 · Refused

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.