Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

35 Budea Cres

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision to the rear addition. The solarium and cold room areas have been converted from unheated to heated areas. These spaces now include the designation of heated areas and the insulation requirements for these spaces. The work area for these changes is 47.58 sq. m.Proposal for a 1 storey addition with a wood deck at the rear of an existing 1 storey SFD-detached dwelling.

    Applied Jun 26, 2024 · issued Jul 2, 2024 · Permit 24 139374 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for a 1 storey addition with a wood deck at the rear of an existing 1 storey SFD-detached dwelling.

    Applied Jun 18, 2024 · issued Jun 26, 2024 · Permit 24 139374 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for a 1 storey addition with a wood deck at the rear of an existing 1 storey SFD-detached dwelling.

    Applied Apr 23, 2024 · issued Apr 29, 2024 · Permit 24 139374 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for a 1 storey addition with a concrete porch at the rear of an existing 1 storey SFD-detached dwelling.

    Applied Apr 23, 2024 · issued Apr 29, 2024 · Permit 24 139374 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 33 Budea Cres · Minor variance

    To construct a new detached garage in the rear yard. This application was previously deferred at the January 2024 hearing.

    10 m away · filed Nov 21, 2023 · Approved

  • 23 Tulip Dr · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new one storey rear addition to the existing one storey dwelling with a new covered front porch.

    200 m away · filed Dec 7, 2017 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.