Toronto address · Ward 12, Toronto-St. Paul's
351 Atlas Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Drains and site services · Back water valve (Sewer only)
Proposed installation of a backwater valve.
Applied Nov 18, 2024 · issued Dec 2, 2024 · Permit 24 239950 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
Neighbours’ Committee of Adjustment files within 250 m
490 Arlington Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey cantilevered addition above the existing attached garage. The garage will be converted into storage space.
130 m away · filed Jul 14, 2026 · Hearing scheduled
378 Winnett Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a second storey rooftop balcony above, and a rear ground level patio. Also, to construct a new one-storey detached ancillary building (one-car garage) in the rear yard with a new rear driveway accessed from the existing right-of-way. The existing ancillary building (shed) in the rear yard will be demolished.
240 m away · filed Nov 24, 2025 · Approved
431 Arlington Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new front one-storey addition with stairs, and a rear two-storey addition with new ground floor stairs and a second storey rear balcony.
210 m away · filed Jan 28, 2025 · Approved
501 Arlington Ave · Minor variance
To alter the existing two-storey building (Leo Baeck Day School) by constructing a front accessible ramp, a side (north) two-storey addition with a green roof, a rear basement walkout, a rear one-storey addition (vestibule entrance), and outdoor amenity areas.
180 m away · filed Nov 22, 2024 · Refused
204 Winnett Ave · Minor variance
To construct a new two-storey detached dwelling with a front covered porch, a rear basement walkout, a rear ground floor deck, and a rear second storey balcony. Also, to construct a new front yard parking pad and driveway, abutting Winnett Avenue. The existing rear shed will be demolished.
230 m away · filed Nov 12, 2024 · Approved
374 Winnett Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing an integral garage, complete second and third storey additions, a rear and partially cantilevered side (north) three storey addition, a covered front porch with stairs (the existing front porch will be demolished), a rear ground floor covered deck with stairs, a rear third storey balcony, and a rear basement walkout with a patio.
220 m away · filed Oct 15, 2024 · Approved
355 Atlas Ave · Minor variance
To alter the existing two-storey, semi-detached dwelling by constructing a rear covered ground floor deck. Also, to convert the existing one-storey ancillary building (detached garage) into one garden suite. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the ancillary building).
10 m away · filed Aug 21, 2024 · Approved
13 Durham Ave · Minor variance
To construct a new two-storey detached dwelling with a front integral garage (with new driveway), a front porch with stairs, a side (east) entrance, rear first storey deck with stairs, and a rear basement walkout. The existing rear ancillary building (detached garage) will be demolished.
140 m away · filed Aug 13, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.