Toronto address · Ward 5, York South-Weston
351 Blackthorn Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal to convert fully detached dwelling to 4 units, interior alterations in basement, first and second floor and underpinning.
Applied Nov 25, 2025 · issued Jan 21, 2026 · completed Jul 27, 2026 · Permit 25 132594 PLB
- Closed
Small residential project · Multiple projects
Revision 01: interior alterations and removal of fire rated ceiling. Proposal to convert fully detached dwelling to 4 units, interior alterations in basement, first and second floor and underpinning.
Applied Nov 25, 2025 · issued Jan 5, 2026 · completed Jul 27, 2026 · Permit 25 132594 BLD (revision 01)
- Closed
Small residential project · Multiple projects
Proposal to convert fully detached dwelling to 4 units, interior alterations in basement, first and second floor and underpinning.
Applied Mar 21, 2025 · issued Jul 22, 2025 · completed Jul 27, 2026 · Permit 25 132594 BLD
- Cancelled
Small residential project · Other
Interior alterations to convert an existing dwelling into four units.
Applied Feb 23, 2024 · completed Dec 23, 2024 · 3 homes added · Permit 24 118150 BLD
- Cancelled
Addition or alteration · Interior alterations
Proposal to convert single family dwelling to 6 units
Applied Sep 9, 2022 · completed Oct 21, 2022 · 5 homes added · Permit 22 201491 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To convert the existing dwelling into an apartment building. The building will contain a total of 6 residential units.
Decision: Approved (hearing May 25, 2021)
Filed Oct 3, 2019 · File A0514/19EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
308 Silverthorn Ave · Minor variance
To construct a new one-storey ancillary building (shed), in the rear yard of the property. The existing rear one-storey ancillary building (shed), with an interlock pad, will be demolished/removed.
250 m away · filed Jun 9, 2026 · Approved
343 Blackthorn Ave · Minor variance
To construct a new fourplex and a new as of right garden suite in the rear.
20 m away · filed May 8, 2026 · Approved
402 Blackthorn Ave · Minor variance
To enclose the existing rear porch.
180 m away · filed Mar 18, 2025 · Approved
342 Gilbert Ave · Minor variance
To alter the existing two-storey ancillary building (detached garage), abutting Bronco Avenue, by converting the second floor into a new second storey garden suite, constructing a front (east) walkout, and reconstructing the exterior south side staircase. The garage area would remain on the ground level of the ancillary building. The existing one-storey detached main dwelling on the property would remain unaltered.
240 m away · filed Aug 2, 2023 · Approved
320 Silverthorn Ave · Minor variance
To alter the existing two-storey detached dwelling (within the Commercial/Residential (CR) zone) by constructing a rear two-storey addition with ground and second storey rear balconies, and a side (south) parking pad. Also, to alter the existing storage shed located in the rear yard.
210 m away · filed May 12, 2023 · Approved
20 Kenora Cres · Minor variance
To construct a two-storey rear addition and a new front porch.
160 m away · filed Oct 5, 2022 · Approved
357 Silverthorn Ave · Minor variance
To construct a new dwelling with an integral garage.
120 m away · filed Aug 11, 2022 · Approved
5 Kenora Cres · Minor variance
To maintain an existing ancillary structure (outside storage) in the rear yard.
90 m away · filed Mar 25, 2022 · Deferred
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.