Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

351 Kennedy Ave

The City of Toronto has 1 building permit since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Back Water Valve (Sewer only) installation.

    Applied Nov 28, 2016 · issued Nov 28, 2016 · Permit 16 257177 DRN

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-and-one-half-storey detached dwelling by constructing a side (south) second storey addition (above the existing attached garage). The existing attached garage will be reconstructed by lowering the parking level into the basement level and converting the first level into habitable space. Also, the existing driveway will be reconstructed and lowered.

    Decision: Approved (hearing May 21, 2025)

    Filed Apr 3, 2025 · File A0234/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 506 Glenlake Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey rear and side (east) addition, a one-storey front addition, as well as a front ground floor porch and stairs. The existing ancillary building (detached garage), in the rear yard will be maintained and unaltered.

    230 m away · filed Nov 1, 2023 · Approved

  • 361 Kennedy Ave · Minor variance

    To construct a new two-storey ancillary building (with a garage on the ground level and garden suite on the second level), fronting Kennedy Avenue.

    30 m away · filed Jan 20, 2023 · Approved

  • 284 Kennedy Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a rear ground floor deck, a basement walkout, and a second storey balcony. Also, to construct a complete third storey addition.

    250 m away · filed Oct 31, 2022 · Approved

  • 69 Colbeck St · Minor variance

    To legalize and to maintain the east side stair addition and third floor dormer, being constructed without a building permit; and to convert the 2½-storey detached dwelling into a three unit dwelling by constructing two secondary suites.

    210 m away · filed Sep 13, 2019 · Approved

  • 491 Glenlake Ave · Minor variance

    To alter the front yard landscaping and to construct a front yard hammerhead parking space having access from the east adjacent property.

    240 m away · filed Jul 24, 2019 · Approved

  • 140 Evelyn Cres · Minor variance

    To maintain a one-storey rear addition.

    210 m away · filed Oct 31, 2018 · Approved

  • 14 Norma Cres · Minor variance

    To enclose the existing front porch.

    140 m away · filed May 15, 2018 · Approved

  • 298 Kennedy Ave · Minor variance

    To construct a rear two-storey addition, a rear third storey addition, a rooftop patio, a rear deck and a new detached garage.

    190 m away · filed Jan 22, 2018 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.