Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

355 Sherbourne St

St Lukes Congregation of the United Chur

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    One ground sign development sign with qr code**something new is coming**

    Applied Nov 7, 2025 · issued Nov 14, 2025 · Permit 25 251167 DST

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 383-387 Sherbourne Street

    39 storeys · 378 homes · Residential

    110 m away · Site plan · Under appeal · filed Jul 6, 2023

    Under appeal
  • 405 Sherbourne Street

    35 storeys · Residential

    190 m away · Site plan · Submitted · filed Mar 9, 2026

    Submitted
  • 211-219 Gerrard Street East

    10 storeys · 60 homes · Mixed use

    230 m away · Site plan · Under review · filed Jul 4, 2025

    Under review
  • 410 Sherbourne Street

    39 storeys · 456 homes · Mixed use

    230 m away · Condominium · Under review · filed Nov 8, 2021

    Under review
  • 227 Gerrard Street East

    107 homes · Residential

    250 m away · Condominium · Under review · filed Oct 27, 2021

    Under review
  • 294-300 Sherbourne Street

    10 storeys · Residential

    290 m away · Condominium · Under review · filed Oct 26, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 185 Gerrard St E · Minor variance

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    250 m away · filed Aug 28, 2026 · Hearing scheduled

  • 183 Carlton St · Minor variance

    To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).

    120 m away · filed Apr 10, 2026 · Approved

  • 311 Sherbourne St · Minor variance

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    180 m away · filed Apr 8, 2026 · Approved

  • 209 Carlton St · Minor variance

    To alter the existing three-storey semi-detached building (currently vacant and with the front and rear portion of the building, abutting Doctor O Lane, attached below grade) by converting it to a mixed-use building (service hub for the Indigenous community) with four dwelling units and community and office space on the basement, first, and second floors, by constructing front and side (west) basement additions, an enlarged ground floor terrace (at the west portion of the building), three new dormers at the rear portion of the second floor, and a rear second floor balcony at the east portion…

    240 m away · filed May 27, 2025 · Approved

  • 134 Carlton St · Minor variance

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    230 m away · filed May 13, 2025 · Approved

  • 311 Sherbourne St · Minor variance

    To alter the existing three-storey commercial building (containing office uses) by converting the west half of the first storey, and the second and third storeys into a hotel use with a common use area located on the ground floor. The existing east half of the building and the existing pharmacy (located on the ground floor) will be maintained. There will be a total of 39 hotel rooms within this mixed-use building.

    180 m away · filed Feb 5, 2025 · Approved

  • 169 Carlton St · Minor variance

    To construct a one-storey ancillary structure (carport), in the rear yard, abutting the laneway (Doctor O Lane), for two parking spaces.

    50 m away · filed Oct 10, 2024 · Approved

  • 194 Carlton St · Minor variance

    To convert the existing two-and-one-half-storey semi-detached mixed-use building into a three-unit dwelling (triplex).

    150 m away · filed Jul 5, 2024 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.