Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

357 Bay St

The City of Toronto has 31 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    To erect and display one illuminated static copy ***WE WORK***

    Applied Jan 25, 2023 · issued Feb 28, 2023 · completed Jun 18, 2025 · Permit 23 107168 DST

    Closed
  • Alternative solution

    Proposed Alternative Solution to address the fire shutter within the exit lobby fire separation within the ground floor of 357 Bay St

    Applied Jul 18, 2022 · completed Jul 26, 2022 · Permit 22 178498 ALT

    Approved
  • Heating and ventilation

    Rev 01 - Change of use at ground floor previously approved under existing permit. Reinstatement of original floor openings at mezzanine previously approved under existing permitHVAC - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING. REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2&2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE OF US…

    Applied Jul 7, 2022 · issued Aug 8, 2022 · completed Feb 12, 2024 · Permit 20 154955 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Rev 02 - construction of new partitions & finishes, installation of a new gf universal washroom, & creation of new internal opening at gf lobby, refer to alternate solution. No changes to the exist. Base buidling mech. Or elect. Services or structural systems are proposed. Exist stairs & fire rated assemblies will remain in their exist. Configuration.rev 01: reduce fire shutter size at mezzanine level as per option 1 of application #20 171409 alt 00 as. Proposal for interior renovations (tenant fit-out) to floors 1 (ground), 2 and 2m (mezzanine). Scope of work includes construction of new par…

    Applied Jul 7, 2022 · issued Sep 14, 2022 · completed Aug 22, 2023 · Permit 20 154955 BLD (revision 02)

    Closed
  • Plumbing

    Rev 01 - Change of use at ground floor previously approved under existing permit. Reinstatement of original floor openings at mezzanine previously approved under existing permitPlumbing - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING. REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2&2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE O…

    Applied Jul 7, 2022 · issued Aug 8, 2022 · completed Feb 12, 2024 · Permit 20 154955 PLB (revision 01)

    Closed
  • Plumbing

    Rev 02 -Proposed revised interior layouts (tenant fit-out) for floors 3-10. Single tenant (WeWork) for entire building, floors 1 thru 10. See attached cover letter for detailsPHASE 1REV 01:SEE COVER LETTERPlumbing - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES NEW LIGHTING.

    Applied Jun 27, 2022 · issued Aug 8, 2022 · completed Oct 23, 2023 · Permit 20 140284 PLB (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Rev 02 -Proposed revised interior layouts (tenant fit-out) for floors 3-10. Single tenant (WeWork) for entire building, floors 1 thru 10. See attached cover letter for detailsREV 01: PHASE 1 SEE COVER LETTERPROPOSED: [Floors 3 -10, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES NEW LIGHTING.]Base building work done under #18 256994 BA

    Applied Jun 27, 2022 · issued Jul 25, 2022 · completed Feb 15, 2024 · Permit 20 140284 BLD (revision 02)

    Closed
  • Heating and ventilation

    Rev 02 -Proposed revised interior layouts (tenant fit-out) for floors 3-10. Single tenant (WeWork) for entire building, floors 1 thru 10. See attached cover letter for detailsREV 01: PHASE 1 SEE COVER LETTERHVAC - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES NEW LIGHTING.

    Applied Jun 27, 2022 · issued Aug 8, 2022 · completed Nov 23, 2023 · Permit 20 140284 HVA (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision#1: reduce fire shutter size at mezzanine level as per option 1 of application #20 171409 alt 00 as. Proposal for interior renovations (tenant fit-out) to floors 1 (ground), 2 and 2m (mezzanine). Scope of work includes construction of new partitions and finishes, installation of mechanical and electrical distribution, installation of new washrooms including plumbing and fixtures, new lighting, reinstatement of opening in 2m floor with associated structural work, 2hr frr between 2 and 2m floors maintained with 2hr frr gwb partitions and fire shutters. Change of use at ground floor from…

    Applied Feb 1, 2021 · issued Mar 3, 2021 · completed Aug 22, 2023 · Permit 20 154955 BLD (revision 01)

    Closed
  • Plumbing

    PHASE 1REV 01:SEE COVER LETTERPlumbing - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES NEW LIGHTING.

    Applied Aug 24, 2020 · issued Oct 1, 2020 · completed Oct 23, 2023 · Permit 20 140284 PLB (revision 01)

    Closed
  • Heating and ventilation

    Rev 01: phase 1 see cover letterhvac - proposed: interior renovation (tenant fit-out) including construction of new partitions and finished, relocation of fan coil units to suit tenant new layout, installation of mechanical and electrical distribution, installation of new washrooms including plumbing and fixtures new lighting.

    Applied Aug 24, 2020 · issued Sep 25, 2020 · completed Nov 23, 2023 · Permit 20 140284 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV 01: PHASE 1 SEE COVER LETTERPROPOSED: [Floors 3 -10, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES NEW LIGHTING.]Base building work done under #18 256994 BA

    Applied Aug 24, 2020 · issued Oct 1, 2020 · completed Feb 15, 2024 · Permit 20 140284 BLD (revision 01)

    Closed
Show 19 more permits
  • Alternative solution

    Proposed Alternative Solution to address the use of oversized rolling steel fire doors (i.e fire shutters) separating the level 2 and level 2 mezzanine openings at 357 Bay St. Related to permit # 20-154955.

    Applied Jul 22, 2020 · completed Nov 3, 2020 · Permit 20 171409 ALT

    Approved
  • Alternative solution

    AS-GROUND FLOOR EXIT DOOR FOR MAG LOCKInstall two maglock to existing office building

    Applied Jul 20, 2020 · completed Sep 8, 2020 · Permit 20 170027 ALT

    Approved
  • Heating and ventilation

    HVAC - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING. REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2&2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE OF USE AT GROUND FLOOR FROM RETAIL (GROUP E) TO OFFICES (GROUP D) AND CONFERENCE/PRESENTATION ASSEMBLY SPACE (GROUP A2)Base building work done under #18 256994 BA

    Applied Jun 11, 2020 · issued Nov 3, 2020 · completed Feb 12, 2024 · Permit 20 154955 HVA

    Closed
  • Plumbing

    Plumbing - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING. REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2&2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE OF USE AT GROUND FLOOR FROM RETAIL (GROUP E) TO OFFICES (GROUP D) AND CONFERENCE/PRESENTATION ASSEMBLY SPACE (GROUP A2)Base building work done under #18 256994 BA

    Applied Jun 11, 2020 · issued Nov 3, 2020 · completed Feb 12, 2024 · Permit 20 154955 PLB

    Closed
  • Addition or alteration · Interior alterations

    PROPOSAL FOR INTERIOR RENOVATIONS (TENANT FIT-OUT) TO FLOORS 1 (GROUND), 2 AND 2M (MEZZANINE). SCOPE OF WORK INCLUDES CONSTRUCTION OF NEW PARTITIONS AND FINISHES, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING, REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2 AND 2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE OF USE AT GROUND FLOOR FROM RETAIL (GROUP E) TO OFFICES (GROUP D). Base building work done under #18 256994 BA

    Applied Jun 11, 2020 · issued Nov 3, 2020 · completed Aug 22, 2023 · Permit 20 154955 BLD

    Closed
  • Plumbing

    Plumbing - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES NEW LIGHTING.

    Applied Apr 29, 2020 · issued Jun 4, 2020 · completed Oct 23, 2023 · Permit 20 140284 PLB

    Closed
  • Addition or alteration · Interior alterations

    PROPOSED: Floors 3 -10, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES NEW LIGHTING.Base building work done under #18 256994 BA

    Applied Apr 29, 2020 · issued Jun 4, 2020 · completed Feb 15, 2024 · Permit 20 140284 BLD

    Closed
  • Heating and ventilation

    Hvac - proposed: interior renovation (tenant fit-out) including construction of new partitions and finished, relocation of fan coil units to suit tenant new layout, installation of mechanical and electrical distribution, installation of new washrooms including plumbing and fixtures new lighting.

    Applied Apr 29, 2020 · issued Jun 4, 2020 · completed Nov 23, 2023 · Permit 20 140284 HVA

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Install two maglock to existing office building

    Applied Dec 16, 2019 · issued Sep 9, 2020 · Permit 19 261662 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    Rev 02: changes to south facade, changes to exit on basement at couth east corner

    Applied Aug 8, 2019 · issued Oct 31, 2019 · completed Oct 20, 2020 · Permit 18 256994 BLD (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    REVISION - relocation of existing openings at east wall to co-ordinate new stairsProposal for interior alterations, basement to top floor of existing 11 storey office building. back to base conditions

    Applied May 9, 2019 · issued Jun 21, 2019 · completed Oct 20, 2020 · Permit 18 256994 BLD (revision 01)

    Closed
  • Fire and security upgrade

    FS - New fire alarm throughout entire building - Proposal for interior alterations, basement to top floor of existing 11 storey office building. back to base conditions

    Applied Dec 21, 2018 · completed Feb 28, 2019 · Permit 18 256994 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations, basement to top floor of existing 11 storey office building.

    Applied Nov 15, 2018 · issued Dec 21, 2018 · completed Jan 18, 2021 · Permit 18 256994 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations basement to top floor of existing 11 storey office building.

    Applied Nov 15, 2018 · issued Dec 21, 2018 · completed May 1, 2020 · Permit 18 256994 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations, basement to top floor of existing 11 storey office building. back to base conditions

    Applied Nov 15, 2018 · issued Dec 21, 2018 · completed Oct 20, 2020 · Permit 18 256994 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed interior demolition to the entire existing office building to bring the building back to base conditions to be finshed later by new tenant.

    Applied Sep 14, 2018 · completed May 30, 2019 · Permit 18 225393 HVA

    Cancelled
  • Addition or alteration · Other

    Proposed interior demolition to the entire existing office building to bring the building back to base conditions to be finshed later by new tenant.

    Applied Sep 14, 2018 · completed May 30, 2019 · Permit 18 225393 BLD

    Cancelled
  • Plumbing

    Plumbing - Alterations - Unit 502 - Dundee Realty

    Applied Mar 27, 2014 · issued Apr 4, 2014 · completed Aug 21, 2026 · Permit 14 134319 PLB

    Closed
  • Designated structure · Sign building permit related

    To erect and display signs.**Flight Centre**

    Applied Jun 24, 2013 · completed Mar 12, 2018 · Permit 13 192597 DST

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 20 King St W · Minor variance

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    220 m away · filed May 6, 2026 · Approved

  • 67 Richmond St W · Minor variance

    To construct an outdoor patio in the West side yard and rear yard of the existing seven-storey mixed-use building.

    80 m away · filed Dec 18, 2020 · Approved

  • 330 Bay St · Minor variance

    To alter the existing 11-storey mixed-use building by increasing the usable floor area at the first and second storey.

    80 m away · filed Sep 16, 2020 · Approved

  • 365 Bay St · Minor variance

    To alter the existing commercial building by converting the basement, ground, and mezzanine levels to an eating establishment (greater than 30 seats). An expansion of the existing mezzanine will be constructed to accommodate mechanical space, elevators and access stairs.

    20 m away · filed Sep 27, 2017 · Approved

  • 85 Richmond St W · Minor variance

    To alter the existing office building by facilitating heritage restoration, recladding and the addition of non-residential gross floor area to the rear of the building.

    160 m away · filed May 15, 2017 · Approved

  • 2 Queen St W · Minor variance

    To alter the two 6 ½-storey buildings by constructing: a one-storey addition which will contain office and retail use, a green roof, and to remove the metal over-cladding from the buildings.

    220 m away · filed Apr 6, 2017 · Approved

  • 1 Adelaide St E · Minor variance

    To construct two outdoor patios to be associated with restaurant uses in the east courtyard area.

    230 m away · filed Dec 6, 2016 · Approved

  • 120 Adelaide St W · Minor variance

    To facilitate the recladding of the existing office building and a reconfiguration of Open Space on the lot to facilitate new directory signage and new restaurant patio spaces.

    210 m away · filed Nov 22, 2016 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.