Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

358 Lansdowne Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Garage

    Demolish existing garage and construct new detached garage abutting the existing laneway

    Applied Sep 26, 2025 · issued Oct 2, 2025 · completed May 22, 2026 · Permit 25 231150 BLD

    Closed
  • Small residential project · Garage

    Proposal to construct new concrete block garage 4.57m x 6.71m in rear yard abutting a lane

    Applied Jul 29, 2025 · completed Aug 1, 2025 · Permit 25 202236 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 148 Margueretta St · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage abutting the laneway) by constructing a complete second storey addition (to contain one laneway suite) with a side (east) dormer, and a covered second storey balcony at the northwest corner. The second storey of this ancillary building will be cantilevered on the east side. There will be a total of four residential dwelling units on this lot (three units within the main dwelling, and one unit within the ancillary building).

    220 m away · filed Apr 7, 2026 · Approved

  • 204 Margueretta St · Minor variance

    To legalize and to maintain the rear and side (south) roof (canopy) which was constructed without an authorized building permit. There will be a total of one residential dwelling unit on this lot (within the existing two-and-one-half storey detached dwelling).

    230 m away · filed Sep 10, 2025 · Approved

  • 385 Lansdowne Ave · Minor variance

    To permit the conversion of the existing front and rear enclosed porches into habitable space, without an authorized building permit. Also, to alter the existing two-and-one-half-storey detached dwelling by constructing a new front landing platform with stairs. The existing rear ground floor deck, the rear second storey deck, and the rear third storey balcony will be maintained and unaltered.

    180 m away · filed Jul 25, 2024 · Approved

  • 397 Lansdowne Ave · Minor variance

    To alter the existing two-and-one-half storey detached dwelling by constructing a rear one-storey addition with stairs. Also, to maintain the existing enclosed front porch.

    120 m away · filed Oct 2, 2023 · Approved

  • 301 St Clarens Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a three-storey rear addition, a rear ground floor deck with stairs, and rear second and third storey balconies.

    150 m away · filed Oct 17, 2022 · Approved

  • 447 Lansdowne Ave · Minor variance

    To convert the existing two-and-one-half-storey semi-detached dwelling from one unit into three units (1 primary unit and 2 secondary units).

    60 m away · filed Sep 28, 2022 · Approved

  • 449 Lansdowne Ave · Minor variance

    To convert the existing two-and-one-half-storey semi-detached dwelling from two units into three units (1 primary unit and 2 secondary suites).

    60 m away · filed Sep 27, 2022 · Approved

  • 196 Margueretta St · Minor variance

    To alter the existing building by constructing a rear two-storey addition, a basement walkout, and a rear ground floor deck.

    220 m away · filed Dec 15, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.